Kip: It appears that SUB Water Quality has granted conditional acceptance of the diesel generator as discussed below.
Planning and Public Works staff have reviewed the plans and determined the enclosure needs to be equipped with a
stormwater drain with shutoff valve or filter insert. Hope this helps!
Andy
From: CHINm Amy C. [mailto:AmyC@subutiLcom]
Sent: Tuesday, February 01, 2011 2:16 PM
To: glarsen@bhengineers.com
Ce: Scott Walker; tguard@bhengineers.com; UMBIRD Andrew
Subject: RE: Generator containment info
Geoff,
The original proposal was for the enclosure to drain to landscaping, but that was not possible because of
property boundary issues. Determining how and where the enclosure should drain will be site specific.
The shut-off valve is more like a ball valve, though I am not sure of the exact kind of valve they used (so,
no, not like a flood gate).
SUB would like to see an insert in the catch basin; however, the actual requirements come from the City,
not from SUB.
Please let me know if you have any other questions.
Amy
Amy E. Chinitz
Water Quality Protection Coordinator
Springfield Utility Board
. 202 South 18th Street
Springfield, OR 97477
Phone: 541.744.37 4S
Fax, 541.747.7348
From: Geoff Larsen [mailto:glarsen@bhengineers.com]
Sent: Tuesday, February 01, 2011 2:04 PM
To: CHINm Amy C.
Ce: 'Scott Walker'; tguard@bhengineers.com
Subject: RE: Generator containment info
Hi Amy,
Thank you much for the cut-sheet. If I am understanding the excerpt below correctly, it looks like the Springfield Dialysis
project used a flood gate at the wall of the enclosure, which drained through the wall across the ground surface to an
adjacent catch basin. Please let me know if this sounds accurate, and let me know if the attached stop gate is similar to
1
. ~~~ni:~c~~ed:4j4"
. .. .
'I the product used at Springfield Dialysis. Please also note that, for our project site~e existing catch basin that would
accept drainage from the generator enclosure is not currently fitted with a flo-guard insert. Would SUB require the.
Cabela's project to add an insert to the existing catch basin? .
Thank you,
Geoff Larsen, P .E.
Civil Engineer
Balzhiser & Hubbard Engineers
Mechanical- Electrical- Ovil - Energy - Lighting - Surveying - Commissioning - $ustainability
100 West 13th Avenue, Eugene, Oregon 97401 (541) 686-8478 fax (541)345-5303
From: CHINill Amy C. [mailto:AmyC@subutil.com]
Sent: Tuesday, February 01, 2011 10:34 AM
To: glarsen@bhengineers.com
Subject: Generator containment info
Geoff,
Pasted below is an excerpt from the Springfield Dialysis HMMP that explains the set-up. I have attached
the spec sheet for the sub-base containment tray. I apologize that it is full of my notes from a telephone
call with the manufacturer.
Back-up Generator and enclosure area (exterior):
The diesel fueled packaged engine generator has been designed w.i
enclosure, fuel tank leak detector, sub~base containment tray, and,
foundation below the fuel tank/above the slab. The sealed and cur
gate that shall be kept open to allow for stormwater drainage to th
with a Flo-guard filter insert. During filling of the fuel tank, the ope
gate to ensure that any spills shall be contained in the curbed area.
immediately if any spillage occurs during filling. A drain mat shall
stormwater catch basin in case of a spill. Before the flood gate is 0)
operator shall visually inspect the sealed slab for any spilled matel
instruction shall be posted on the generator. (See Appendix F)
Amy E. Chinitz
Water Quality Protection Coordinator
Springfield Utility Board
202 South 18th Street
Springfield, OR 97477
Phone: 541.744.3745
Fax, 541.747:7348
2
Date Received: ~~/~rl
Planner: AL
.
.
L1MBIRD Andrew
Subject:
L1MBIRD Andrew
Tuesday, March 08, 2011 9:06 AM
'Witte, Mark'
Bartels, Aaron J.; Wisniewski, Walter; Brent Christiansen; Freeman, Benjamin H.;
glarsen@bhengineers.com; tguard@bhengineers.com
RE: .Gateway: Request to remove wheel stops
From:
Sent:
To:
Cc:
Mark: The diagrams are consistent with our previous discussions so the City is amenable to the requested changes. If
you have any additional questions please let me know.
On a related note, Cabela's has just announced an anticipated grand opening date of May 5. To ensure that final
building occupancy can be issued for the Cabela's store in accordance with this schedule, Planning staff will need to
conduct a final site inspection sometime in late April once all exterior site improvements have been completed. I can
arrange for the final site inspection given reasonable advance notice. Thanks
Andy Limbird
City of Springfield
From: Witte, Mark [mailto:MarkWitte@ggp.com]
Sent: Monday, March 07, 20111:11 PM
To: UMBIRD Andrew
ee: Bartels, Aaron J.; Wisniewski, Walter; Brent Christiansen; Freeman, Benjamin H.; glarsen@bhengineers.com;
tg uard@bhengineers.com
SUbject: Gateway: Request to remove wheel stops
Importance: High
Please see attached request.
Mark
Mark Witte, AlA
Design Manager
~ GENERAL,GRqWTH
~IiPR0PERTIES .
110 North Wacker Drive
Chicago, Illinois 60606
312.960.5000 phone
312.960.5778 direct
312.618.0578 cell
www.aao.com
Mark.Witte@aoo.com
1
Date Received:
Planner:: AL
3/f/Jo//
/