Tuesday, January 11, 2011 4:59 PM
L1MBIRD Andrew
RE: Gateway Mall Cabela's: Storm Drain Relocation
This looks fine to me, I don't see something like this as any kind of substantial change in the plans-just field conditions
that are never what the plans said they would be
From: LIMBIRD Andrew
Sent: Tuesday, January 11, 2011 2:38 PM
To: KAUFMAN Kip; GRAHAM Steve; MCEACHERN Clayton
Subject: PN: Gateway Mall Cabela's: Storm Drain Relocation
Please review the attached drawings and let me know if you have any issues or concerns with the proposed changes.
Because the revisions are proposed to:
(a) abandon an existing 8" private stormwater line found during on-site work; and (b) realign a 15" private stormwater
line to make gradient to the discharge point, I am inclined to accept the proposed revisions as "field adjustments". If
you are amenable to these revisions, full-size plan sheets can be requested from the applicant for attachment to the
approved plan sets. let me know what you think! Thanks
Andy
From: Ryan Nossaman [mailto:rnossaman@bhengineers.com]
Sent: Tuesday, January 11, 2011 2:17 PM
To: LIMBIRD Andrew
Cc: tguard@bhengineers.com; Geoff Larsen
Subject: Gateway Mall Cabela's: Storm Drain Relocation
Hi Andy,
Attached are the revision materials I called you about. We will wait to hear back from you on the number of copies you
would like to have for the full size sheet.
Also, I have not been able to track down any information on a site/building generator as it relates to site screening
requirement but I'll keep checking.
Thank you,
Ryan Nossaman
Civil Designer
Balzhiser & Hubbard Enqineers Inc.
Mechanical. Electrical - Civil - Energy - lighting - Surveying - Commissioning - Sustainability
100 West 13th Avenue, Eugene, Oregon 97401 (541) 666-8478 fax (541) 345-5303
1
. ,'{dCeived:4'-;y/ .uJ /1
"!armer:' AL /