Loading...
HomeMy WebLinkAboutCorrespondence PWE 8/27/2010 (2) . . Memorandum City of Springfield Date: August 30, 2010 To: Andy Limbird - Planning From: Jesse Jones, P.E., Civil Engineer Subject:. TYP11O-00001 Gateway Mall- Cabela's Transportation Comments The Transportation Division has reviewed the materials provided with the subject application. The required findings and conditions outlined below are provided for your implementation into the land use decision. General Finding: Approval of this proposal would allow a new Cabela's retail store (tenant infill), loading dock relocation, and parking lot modifications at Gateway Mall. The entire development site is located on Tax Lot 02219 of Map 17-03-22-00. Site Access and Circulation Finding: In accordance with SDC 4.2-105.A.I, the on-site private road system shall assure efficient traffic circulation that is convenient and safe. The applicant is proposing to re-align the existing perimeter loop road along the west edge of the mall site to accommodate the new RV and compact parking spaces. In realigning the perimeter loop road, the northbound travel would be deflected to a four-way intersection approximately 160 feet from the northwest corner of the Cabela's store. This intersection will require some type of traffic management signage to ensure safe operation. However, the applicant has not depicted any traffic control signage or stop bares) on the site plan. Condition: Provide traffic management signage and/or stop bar(s) at the above identified intersection. Transportation Svstem Impacts Finding: There are no significant offsite transportation system impacts. . Date Reeelvecj: 8A7~1D pl"1nnRr' ill 7-' / C:\Documents and Settings\limb0967\Local Settings\Temporary Internet Files\Content.OutJook\OtJSF'01GATYP.110.00001 Gateway Mall - Cabelas Trans.dacx