HomeMy WebLinkAboutCorrespondence PWE 8/27/2010 (2)
.
.
Memorandum
City of Springfield
Date: August 30, 2010
To: Andy Limbird - Planning
From: Jesse Jones, P.E., Civil Engineer
Subject:. TYP11O-00001 Gateway Mall- Cabela's Transportation Comments
The Transportation Division has reviewed the materials provided with the subject application.
The required findings and conditions outlined below are provided for your implementation into
the land use decision.
General
Finding: Approval of this proposal would allow a new Cabela's retail store (tenant infill),
loading dock relocation, and parking lot modifications at Gateway Mall. The entire development
site is located on Tax Lot 02219 of Map 17-03-22-00.
Site Access and Circulation
Finding: In accordance with SDC 4.2-105.A.I, the on-site private road system shall assure
efficient traffic circulation that is convenient and safe. The applicant is proposing to re-align the
existing perimeter loop road along the west edge of the mall site to accommodate the new RV
and compact parking spaces. In realigning the perimeter loop road, the northbound travel would
be deflected to a four-way intersection approximately 160 feet from the northwest corner of the
Cabela's store. This intersection will require some type of traffic management signage to ensure
safe operation. However, the applicant has not depicted any traffic control signage or stop bares)
on the site plan.
Condition: Provide traffic management signage and/or stop bar(s) at the above identified
intersection.
Transportation Svstem Impacts
Finding: There are no significant offsite transportation system impacts.
. Date Reeelvecj: 8A7~1D
pl"1nnRr' ill 7-' /
C:\Documents and Settings\limb0967\Local Settings\Temporary Internet Files\Content.OutJook\OtJSF'01GATYP.110.00001 Gateway Mall - Cabelas
Trans.dacx