Loading...
HomeMy WebLinkAboutCorrespondence PWE 8/27/2010 . . L1MBIRD Andrew From: Sent: To: Subject: MCEACHERN Clayton Friday, August 27,20103:11 PM L1MBIRD Andrew cabelas mds review The Cabela's plan seem fine, and all of public works concern are addressed. Specifically: Stormwater is already treated for the mall as a whole by the existing swale Total impervious surface does not appear to increase The new truck dock will be covered and hydraulically isolated with a drain to sanitary sewer Clayton McEachern, PE Civil Engineer City of Springfield, Engineering Division Ph (541) 736-1036 Fax (541) 736-1021 cmceachem<<V.ci. sorinafield. or. us Date Received: Planner: AL 1 ;In/Jel. I