SPRINGfIELD UTILITY BOARD
WATJ.:KSERV1CE C[:'\ITEfI. 202 Sa'uth 18th Street Springfi9ld, OR 97477-5240 Tel 541.726.2396 Fall. 541.747.7348 www.swbutil.(:om
January 21, 2009
Steve Hopkins
City of Springfield
225N. 5th Strcct
Springfield, OR 97477
Dear Steve:
SUBJECT:
PARTITION TENTATIVE #SUB2008-00054 SCHULZ / D-BAR
Tax Map 17-02-31-22, Tax Lot 500, 790 30"' Streetl1350 28"' Street
The meters for the 3 new parcels have already been constructed and are ready for use for the new
development. If there is any additional water service needed, the following comments apply:
1. The proposed development is within the Springfield city limits and receives water service from
the Springfield Utility Board (SUB).
2. All new water system facilities and modifications to water system facilities bolh inside and
adjacent to the proposed development shan be placed in street right-of-way at a location and
depth of bury that meets the standards of the SUB Water Division.
3. All water facility materials shall be to a standard that must meet SUB Water Division
specifications.
4. All workmanship shan be performed to meet or exceed SUB Water Division construction
, .
standards. .
5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB
Water Division and lhe long-range needs oflhe City. These needs include, but are not limited to,
meter location and access, sizes of water distribution and transmission lines, pumping facilities,
and communication lines.
6. Please ask the developer to contact the SUB Water Division for detailed,information on the
materials and construction standards, detailed costs for installing. SUB water facilities, and a .
schedule of construction. Construction expenses may be reduced wilh good planning of required
water facilities, good timing of facilities installation, and joint trench opportunities.
7. All water meters will be placed in public right-{)f-way at a location identified by the developer.
Each lot or parcel must have its own water service.
8. Water service facilities will be installed upon collection of development charges. Development
policies and charges identified in this letter are subject to change. Actual charges will be those in
effect at the time water service is requested.
S:\SITEPLAN\\350 28th Street partition tentative 1-21-09.docx
~c \ _z,\jl
Date Received: --.-- /"
Planner: SH
01/21/2009 18:14 FAX 7477348
WSC FAX
~ 0021002
',~ ~
.
I.
9. Springfield has several wellhead protection areas, Ninety percent of Springfield's drinking water
comes from wells. In every instance, care shanbe.taken to prevent.groundwater contamination. .
Contractors/developers/oWners shall be responsible for the safe handling and storage of
chenricals, petroleum products, fertilizers, and the prevention of groundwater and storm water
runoff contamination,
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396.
10, Backflow prevention devices will be required for this service. Please coniact Chuck Davis at
726-2396 prior to installing water service. Chuck can help in the selection of the most
economical device and location. Water service will not be provided until a backflow plan has
been submitted to SUB Water Engineering and approved for installation.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division aild
SUB Electric Division.
SL2;~
Rebecca Templin, P.E.
Water Engineering Supervisor - Water Division
RAT:mk
cc: Dana Schulz, D-aar & Company Construction, Inc" 790 30" Street, Springfield, Oregon 97477
Stacy Salladay, Branch Engineering, Inc., 310 Fifth Street, Springfield, Oregon 97477
S:\SITEPLAN\1350 28th Street partition tenlotive 1-21-09.doex
.~