Loading...
HomeMy WebLinkAboutComments SUB 1/21/2011 01/21/2009 18:13 FAX 7477348 WSC FAX 141 00l/002 . . .' SPRINGfIELD UTILITY BOARD WATJ.:KSERV1CE C[:'\ITEfI. 202 Sa'uth 18th Street Springfi9ld, OR 97477-5240 Tel 541.726.2396 Fall. 541.747.7348 www.swbutil.(:om January 21, 2009 Steve Hopkins City of Springfield 225N. 5th Strcct Springfield, OR 97477 Dear Steve: SUBJECT: PARTITION TENTATIVE #SUB2008-00054 SCHULZ / D-BAR Tax Map 17-02-31-22, Tax Lot 500, 790 30"' Streetl1350 28"' Street The meters for the 3 new parcels have already been constructed and are ready for use for the new development. If there is any additional water service needed, the following comments apply: 1. The proposed development is within the Springfield city limits and receives water service from the Springfield Utility Board (SUB). 2. All new water system facilities and modifications to water system facilities bolh inside and adjacent to the proposed development shan be placed in street right-of-way at a location and depth of bury that meets the standards of the SUB Water Division. 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications. 4. All workmanship shan be performed to meet or exceed SUB Water Division construction , . standards. . 5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB Water Division and lhe long-range needs oflhe City. These needs include, but are not limited to, meter location and access, sizes of water distribution and transmission lines, pumping facilities, and communication lines. 6. Please ask the developer to contact the SUB Water Division for detailed,information on the materials and construction standards, detailed costs for installing. SUB water facilities, and a . schedule of construction. Construction expenses may be reduced wilh good planning of required water facilities, good timing of facilities installation, and joint trench opportunities. 7. All water meters will be placed in public right-{)f-way at a location identified by the developer. Each lot or parcel must have its own water service. 8. Water service facilities will be installed upon collection of development charges. Development policies and charges identified in this letter are subject to change. Actual charges will be those in effect at the time water service is requested. S:\SITEPLAN\\350 28th Street partition tentative 1-21-09.docx ~c \ _z,\jl Date Received: --.-- /" Planner: SH 01/21/2009 18:14 FAX 7477348 WSC FAX ~ 0021002 ',~ ~ . I. 9. Springfield has several wellhead protection areas, Ninety percent of Springfield's drinking water comes from wells. In every instance, care shanbe.taken to prevent.groundwater contamination. . Contractors/developers/oWners shall be responsible for the safe handling and storage of chenricals, petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination, Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396. 10, Backflow prevention devices will be required for this service. Please coniact Chuck Davis at 726-2396 prior to installing water service. Chuck can help in the selection of the most economical device and location. Water service will not be provided until a backflow plan has been submitted to SUB Water Engineering and approved for installation. PLEASE NOTE: SUB development charges are paid directly to SUB Water Division aild SUB Electric Division. SL2;~ Rebecca Templin, P.E. Water Engineering Supervisor - Water Division RAT:mk cc: Dana Schulz, D-aar & Company Construction, Inc" 790 30" Street, Springfield, Oregon 97477 Stacy Salladay, Branch Engineering, Inc., 310 Fifth Street, Springfield, Oregon 97477 S:\SITEPLAN\1350 28th Street partition tenlotive 1-21-09.doex .~ Date Received:- Planner: SH IvZ"\ ~