Loading...
HomeMy WebLinkAboutMiscellaneous APPLICANT 1/20/2010 . . Type I tentative Minimum Development Standards, Staff Report &. Decision Project Name: Riverstone Clinic Lane County Nature of Application: Lane County has purchased the existing "Olympic Building" near the intersection of 21" and Olympic Street as a relocation site for the Riverstone Clinic. The building is a three-story office building that was formerly occupied by the SELCO Credit Union and various other professional offices. The County is remodeling the building to use as a clinic facility. Case Number: DRC2009-00042 Project Location: 2073 Olympic Street, Map No. 17-03-25-42 TL 1000 and 1100 Current Site Conditions: The Olympic Building is a three-story office building with approximately 22,000 square feet of interior space. The site takes access from 21" Street and from Olympic. The site depends upon a joint access agreement for shared parking to meet parking space minimums for office use. Existing landscaping is compliant with code. There is no exterior trash receptacle area shown on the site plan and no dumpsters were evident at the time of site inspection. Application Submitted Date: November 10, Site Visit Conducted Date: December 4, 2009 2009 Decision Issued Date: January 20, 2010 Recommendation: Approval as conditioned Zoning: Major Retail Commercial Metro Plan Designation: Major Retail Center Refinement Plan: Not Applicable Zoning of Surrounding Properties: North, West and East - Major Retail Commercial; South --Medium Density Residential CITY OF SPRINGFIELD DEVELOPMENT REVIEW TEAM POSITION REVIEW OF NAME PHONE Project Manager Planning Liz Miller 726-2301 Transportation Planning Engineer Transportation Jon Driscoll - 726-3679 Public Works EIT Sanitary & Storm Sewer Eric Walter 736-1034 Deputy Fire Marshal Fire and Life Safety Gilbert Gordon 726-2293 Building Inspector III Building Robert Castile 726-3666 Owner: Applicant's Representative: Lane County Bill Seider David Suchart PIVOT Architecture ~~te Received: k 20 -/0 125 E. 8th Avenue 72 West Broadway . .... . ......,,"'.. ,."., r /-1 MDS - DRC2009-00042 Riverstone Clinic 1 . . I Eugene, OR 97401 I Eugene, OR 97401 ~~Q";t('I~r'ir'~r._ . r"I' . II' or""-...~r.:;;...,. < .~ ....JrlJ';JPJdQm-:!!r'f~ Purpose: Minimum Development Standards (MDS) are intended to support economic development by minimizing City review for minor additions, expansions or changes in use. MDS shall ensure compliance with specific appearance; transportation safety and efficiency; and stormwater management standards specified in the Springfield Development Code (SDC) and otherwise protect public health, safety and welfare. MDS - DRC2009-00042 Riverstone Clinic 2 . . Criteria of Approval: In order to grant MDS approval, the Director shall determine compliance with all applicable standards specified below: Special Use Standards: 1. SDC section 3.2-315 requires properties zoned Major Retail Commercial which are abutting residential properties to maintain a landscaped setback area of S feet. ~ Complies as Shown on Plot Plan o Proposal Complies when the following Condition(s) is/are met: AI A five-foot wide landscaped planter strip, including street trees, with approved irrigation or approved drought resistant plants as specified in SDC Sections 4.4-100 and 4.2-140 shall be installed between the sidewalk and parking areas or buildings. EXCEPTIONS: 1. Where there is an unimproved street, a four foot wide landscaped planter strip shall be required to be set back one foot from the property line. 2. Where there is insufficient space for the landscaped strip required in Subsection A., above due to existing buildings, street width, paved parking, changes of elevation or location of utilities including catch basins, the Director may approve: a. Decorative fencing located immediately behind the property line. ;The fencing may be wrought iron or masonry and shall be subject to the fence height standards ofthe applicable zoning district and the vision clearance setbacks of Section 4.2-130; and/or b. Landscaping equivalent to the amount required in Subsection A., above may be placed at the property corners or other areas of the property that are visible from the street. ~ Complies as Shown on Plot Plan o Proposal Complies when the following Condition(s) is/are met: > I BI Trash receptacles and outdoor storage areas shall be screened by a structure or enclosure permanently affixed to the ground as specified in SDC Section 4.4-100. MDS - DRC2009-00042 Riverstone Clinic 3 . . D Complies as Shown on Plot Plan ~ Proposal Complies when the following Condition(s) is/are met: Condition #1: A covered trash enclosure shall be installed consistent with stormwater management standards found in Section 4.4.2 of the Portland Environmental Services Bureau Stormwater management manual which has been adopted for implementation in Springfield. The applicant has supplied an update to the site plan and construction drawings showing the required trash encloshure that meets city design standards. C) Bicycle parking spaces shall be added to meet the numerical standards for the appropriate USe or upgraded to meet the standards set in SDC Sections 4.6-140, 4.6145 and 4.6-155. [8l Complies as Shown on Plot Plan D Proposal Complies when the following Condition(s) is/are met: D) Parking and circulation areas shall be paved and striped and wheel stops installed as specified in SDC Sections 4.6-100 and 4.6-120. Required paving and other impervious surfaces on the site shall comply with on-site stormwater management standards as ~pecified in SDC Section 4.3-110 for required parking, circulation area and storage area impervious surfaces only. EXCEPTION: In cases where the number of vehicular parking spaces cannot be met due to lot size or physical constraint, the Director, in consultation with the Transportation Planning Engineer, may reduce the standard without a Minor Variance if a finding is made that the reduction will not have an adverse impact on public safety. ~ Complies as Shown on Plot Plan D Proposal Complies when the following Condition(s) is/are met: Parking minimums are met through the joint use agreement that entitles clients and staff to park on adjacent properties along Olympic to the west. E) Access onto the public right-of-way shall comply with SDC Section 4.2-120. ~ Complies as Shown on Plot Plan D Proposal Complies when the following Condition(s) is/are met: MDS - DRC2009-00042 Riverstone Clinic 4 . . f) Concrete sidewalks shall be installed where the site abuts a curb and gutter street as specified in SOC Section 4.2-135. [g] Complies as Shown on Plot Plan D Proposal Complies when the following Condition(s) is/are met: G) Streetlights shall be installed as specified in SOC Section 4.2-135. [g] Complies as Shown on Plot Plan D Proposal Complies when the following Condition(s) is/are met: H) The development shall connect to public utilities as specified in Sections 4.3-105, 4.3-110 and 4.3-120 of the SOC and comply with the Springfield Building Safety Codes, where applicable. Easements may be required as specified in Subsection 4.3-140 of this Code. [g] Complies as Shown on Plot Plan D Proposal Complies when the following Condition(s) is/are met: Timelines and Conditions of Approval: The property owner and/or applicant has 30 days from the date of this decision to submit a Final Plot Plan (the Final Plot Plan must be to scale and indicate the scale on the plan) demonstrating compliance with the following Conditions of Approval: Condition #1: A covered trash enclosure shall be installed consistent with storinwater management standards found in Section 4.4.2 of the Portland Environmental Services Bureau Stormwater management manual which has been adopted for implementation in Springfield. MDS - DRC2009-00042 Riverstone Clinic 5 . . Note: on January 19, 2010, the applicant provided an amendment to the original site plan showing the required enclosed trash enclosure. This amendment shall be added to the original drawing and will be accepted as the Final Plot Plan. In order to complete the review process, a Development Agreement is required within 45 days from the date of this decision to ensure the terms and conditions of this application are binding upon both the applicant and the City. This agreement will be prepared by Staff and upon approval of the Final Plot Plan, must be signed by the property owner prior to issuance of a building permit and land use approval. The construction of the required improvements shall begin within 90 days of the date of this decision. If the established time line cannot be met, the applicant may submit,a written request . for a time line extension as specified in SDC Section 5.15-125. The Director may allow a one-time extension of the 90-day start of construction time line due to situations including but not limited to, required permits from the City or other,agencies, weather conditions and the unavailability of asphalt or the unavailability of street trees. If the time extension is allowed, security shall be provided as specified in SDC Section 5.17-150 of this Article. The time line extension shall not exceed 90 days. If the established time line is not met and the applicant has not requested an extension, the Director shall declare the application null and void if the property is occupied and the property owner shall be considered in violation ofthis Code. If the established time line is not met and the applicant has requested an extension and that time line has not been met, the Director may require the improvements be installed as specified in SDC Section 5.7-150. Permits That May Be Required: . All new sewer taps will require permits from the Public Works De'partment prior to connection. . Sidewalks and driveway curb cuts and closures require permits from the Public Works Department. , . Building permits will be required for the construction of the building and the paving of the parking lot. . An LDAP permit will be required for all grading, filling and excavating being done. . Sign Permit-NOTE: Signs are regulated by the Springfield Municipal Code Article 9, Chapter7. The number and placement of signs must be coordinated with the Community Services Division. The location of signs on a Site Plan does not constitute approval from the Community Services Division. Additional Information: The application, all documents, and evidence relied upon by the applicant, and the applicable criteria of approval are available for free inspection and copies are available for a fee at the Development Services Department, 225 Fifth Street, Springfield, Oregon. MDS - DRC2009-00042 Riverstone Clinic 6 . . Appeals: This Type I decision is exempt from the provisions of ORS 197.195, 197.763 and 227.173 and therefore cannot be subject to the appeal provisions of SDC Section 5.3-100, Appeals. Questions: Please call Mark Metzger in the Planning Division of the Development Services Department at (541)726-3775 if you have any questions regarding this process. MDS - DRC2009-00042 Riverstone Clinic 7