HomeMy WebLinkAboutPermit Building 1991-8-13
CO M M E RCIALlI N DU ST RIAL
PERMIT. APPLICATION
225 Fifth Street, Springfield, Oregon 97477
LOCATION OF PROPOS~D WORK' / J J. ?
ASSESSORS MAP: \ID~@l 0 \~
,I_ (/1. (ilA YJlhI'~e
:3 _ -? 9 M IJ\.fJ/lL-?jef-F , r I-
,r;1J ~,' ,AI ?+/ 6/ rI. STAT~' If7< ZIP: .,l 7c; 7 '7
//- ge~)(__-I ~~~.??~/~/~{~6
ADDITION DEMOLISH OTHER
OWNER:
ADDRESS:
CITY'
DESCRIPTION OF WORK:
NEW
L ~ REMODEL
ARCH ITEeT: i
(
B-A
NAME
/_/1= AI4/l t-
A~DRESS )
( ~/H-I/ WtRCC.'
_.. tJ CONST.
ADDRESS CONTRACTOR #
UJ 4- Y/11 i r (L(f II /h.E) '7 L/t, f/7
CONTRACTOR'S NAME
\TH (Jf!
GENERAL:
PLUMBING' .
MECHANICAL:
ELECTRICAi.
I
I NO.
I :2.;iJf SingleFixture
I Relocated Bldg.
(new fix, addtl)
~~/X' Water Service
IL ~ 1 Sanitary Sewer
17"" I Storm Sewer
I I I Backflow Device
I I
I I
I I
I I
I I
I TOTAL PERMIT
PLUMBING
ft.
I
I
I
I
I
I
I
I
I
ft.
ft.
QUAD AREA: ~ ~ \\JllJ
t'\\ \
OCCY GROUP: '"
A.
# OF BLDGS:
# OF STORIES'
SQ, FT.
SQ. FTG MAIN .g'3? 2.
SQ. FTG ACCESS 6''10
SQ. FTG OTHER ~"'!7~
I
I NO
I
I
I
I
I ~,
I
1'1
I
/1
I
I
I TOTAL PERMIT
LAND USE:- o\\~s~
~
\/A.)
FEE
/tP
I
CHARGE I
"26~.~ I
1- I
~~_t>/
:<5",. 4
" Y't1>:"'1
/t1J.~1
I
I
I
I
I
I
I
13'7S~.
# OF UNITS:
/(
. ,-\T
.
-r1 ()
9/~-s.~
$/SQ. FT.
X "38. Y'c>
X //1./0
X
. ,
PLAN CHECK FEi: -.!:I/), ~':>-r ti5"~CPT# :::?O/~
DATE~/~/,r
~Y /7~~.
,,. ,
I BUILDING PERMIT
15% State
SurcharQe
I MECHANICAL
/5% State
SurcharQe
I PAVIN~
JOB NUMBER
INSPECTION LINE: 726,3769 .
OFFICE: 726.3759
it 0:- fn -7 0/- P tv\?'C{CJt
TAX LOT: (:-> 6lrDO
PHONE:
7;26 -.f()h b
J)/~. -f!)C> ~ -., ,,1 PLUMBING
f'" ~ . 1.5% State
-:2~ .q~'~" SurCharge
ijh..t>~ I e~~UCEE $
. ;.... jc:>- I SIDEWALK
I. S'6.50 .ICURBCUT
I
I
I
FT. I
FT. 1_
~//~b>/:~'-Av .
VALUE: ,1!J.r:t./IJ() '--
. . / S"~. :;:;? fl&!. ~<t:J J
PHONE
EXPIRES PHONE
it;! ~l! q 1- ,7%-9S.20
MECHANICAL
1=1=10
r.HAR(lF
Furnace/burner & vent
<100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater.
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
I
I
"3
'0'-~
I /~,e>~
I I. I
I ~SC> /8. --~ I
I I
I'?
Permit Issuance
. $10.00
f/6.4
HANDICAP ACCESS:
FLOOD PLAI~' '.IZ'#-
ZONING: \-..A.. \)~
CONSTR. TYPE:
HEAT SOURCE: ~r-C,r .~ L
LIGHTING POWER BUDGET:
WATER HEATER:
EC~:..
VALUE
/-=3.17. 2.~2_ ~O
,
7. a /'-/. ere.
..,
~ 4'-.:z~ . ~b
- F ,'.
TOTAL VALUE OF PROJECT /~:f2B9.~
'3~ ~ I DEMOLITION
/.8 .7s-1
5: c!!>6 I
I SUBTOTAL
PERMITS
I SYSTEMS '
DEVELOPMENT
--' ....
/ t74/7. q~
2/~9'.~ 51
TOTAL PERMIT FEES
EXCLUDING ELECTRICAl
'328/.SS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setu p of forms.
" 7)
'r \,
)(
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
REQUIRED INSPECTIONS
I
ox
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
y
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
~
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
STRUCTURAL CONCRETE: In
excess of 2500 PS.1. (306 a.1)
K
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
)I
FRAMING: To be made after
the roof, all frami ng, fi re
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the' rough electrical, plumbing
and mechanical are approved.
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
x
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
STRUCTURAL WELDS:
Performed on the job. (2722 f)
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied. ..
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
y
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
y
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
'j
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
y
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
finished.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
SIDEWALK & DRIVEWAY:
Required for all'concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
* In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
-------------------------------------------------------
Y FINAL PLUMBING
I
I FINAL ELECTRICAL
X FINAL MECHANICAL
Y FINAL FIRE DEPARTMENT
I
ADDITIONAL COMMENTS:
X SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
)( FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
PLANS REVIEWED BY /k.. . ~~~...-:::-:> DATE ? c:;; 57/
r , /' ~, -- ~
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
Signatu,e ?, N~~
Date
'2-l '5- '7 /
VALIDATION:
AMOUNT RECEIVED: 5*$55"y. 07
RECEIPT #: -:?c::>~g7>
DATE PAl D: 8- /3... <<7/..
RECEIVED BY:~"'~~-<::"";
"/ r ~