HomeMy WebLinkAboutPermit Building 1991-9-30
CO M M E RCIAL/I N DUST RIAL
PERMIT APPLICATION
JOB NUMBER
9/L? / -::f 9'
- - ,
225 Fifth Street, Springfield, Oregon 97477
INSPECTION LINE: 726.3769. .
OFFICE: 726.3759
"... "
LOCATION OF PROPOSED WORK: /20/ k'
ASSESSORS MAP: / 7...o-g.::<~-/S/
7/A.R'c ~L /9- OP A..? R' ~~"7'
OWNER:~4~ 'Y" ~.~/77~~E
ADDRESS: ~~ q ~#~"73R/z)&; C ~T.
-- , ", - ,-
~~!"!>'~.F/ELD
-S~~C~: t:/Ai"//"~ /,,2_~ 31 Y
TAX LOT:' "3'h~
PHONE:
7"2~- 9CJ~b
CITY:
STATE:
CJ>R.
-ZIP:
977///.
DESCRIPTION OF WORK:
NEW ~ REMODEL
t.j -,P~€7
ADDITION
DEMOLISH
OTHER
VALUE: j::s--r: ~ 7?'- ~tt!>
NAME
~~~~~n 2/~~T
~" ~, -
ADDRESS
PHONE
CONTRACTOR'S NAME ADDRESS
"GENERAL: #~~~/77.~/E"
PLUMBING: ~4~t!:~-,tE;.5
CONST.
CONTRACTOR #
EXPIRES
PHONE
MECHANICAL:
ELECTRICAL: 6~~ /5
I PLUMBING I MECHANICAL I
I NO. FEE CHARGE I NO 1=1=1= rl-lARnl= I
Iz.?> Single Fixture 2~.~1 Furnace/ burner & vent I
/1> <100,000 BTUs
I Relocated Bldg. I' I Furnace/burner & vent I I
(new fix. addtl) > 100,000 BTUs
I< S-cS ' Water Service I :Z~"'6 I Floor furnace and vent I I
ft.
1/:<'0 / Sanitary Sewer I ~tP,-DI Suspended wall or floor I I
ft. mounted unit heater
k~oll Storm Sewer I '2S": c::sG>1 Appliance Vent I' I
ft. separate
I / I /o.~1 Stationaryevap. I I
Backflow Device cooler
I I '" I LJ I Vent Fan/Single I /::?,~I
duct "3
I I -, I Vent System apart I
from AC or htg.
I I I 'I I Mechanical exhaust /f.~ 18.~1
hood and duct
I I I I I I
1 I I I Permit Issuance I $10.00 I
I TOTAL PERMIT I .g~P.ee1 TOTAL PERMIT I q6'~~nl
- OFFICE USE - HANDICAP ACCESS:
QUAD AREA: ~p_)S/ bC/
./
OCCY GROUP: ;z?-/
2.
LAND USE:
/ /-::1'/
.. - - - -
Lj.
~AI
FLOOD PLAIN: /'1..4- ~
, ,
ZONING' ,M P"A>
# OF BLDGS:
# OF UNITS:
# OF STORIES:
CONSTR. TYPE:
HEAT SOURCE: e;?'4:c::r- ~~L
LIGHTING POWER BUDGET:
WATER HEATER: E Lc<::::::::..r- _
SQ. FT. $/SQ. FT.
SQ. FTG MAIN "?"?92 X ~~.~O
SQ. FTG ACCESS X
SQ. FTG OTHER .P#ru~/~ X
VALUE
/ ...:?.t:'. '2 s-'2 . .90
;
r;; 7"'2"2. $"" ~
TOTAL..VALUE OF PROJECT /-::J.~ tC7.t;; ":3"0
.. , - -
PLAN CHECKFEi: iI~, ~p
RCPT#
DATF
BY
I BUILDING PERMIT
15% State
Surcharge
I MECHANICAL
15% State
SurcharQe r, .
I PAVING
5""tJ~ ~~7S'
~~/'7'
~ PLUMBING
j 5% State
'1 Surcharge
FENCE r1 c::::"i"\.
'-;/O.'p ./ VALUE $ . ,~
"::2~~O " SIDEWALK It?LJ FT.
~ I CURBCUT
::;> "6, ..>6 v ?V- FT.
--? 6i!:/> DEMOLITION
-::>O(!).. ".,-
/5.""'~ ./
5.~~ j
SUBTOTAL
~$'.- v PERMITS
SYSTEMS
/Y'- S'c> ,I, DEVELOPMENT'
I
j
I
)
, I
" _. ~~S.&!l_
I. ":2~~Si~ I
TOTAL PERM'IT FEES
EXCLUDING ELECTRICAL
3t)~/.(/z
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you wi,'1 be ready
for inspection. Requests received before 7:00 a.m. wil' be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
. ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
x
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
>,.-f
REQUIRED INSPECTIONS
x
J
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
pi pi ng, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
^
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code.
a special inspector shall be employed
by the Owner! Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
)-
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
. made prior to installation of
floor insulation, decking or
floor sheathing.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
frami ng inspection.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
A
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
x
FRAMING: To be made after
the roof, all frami ng, fi re
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
HIGH STRENGTH BOLTING:
During all bolt installation and
ti ghteni ng operations. (306
a.6)
)(
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
STRUCTURAL WELDS:
. Performed on the job. (2722 f)
~
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied. -
SPECIAL GRADING,
EXCAVATION AND FILLING:
Du ri ng earthwork. (306 a.11 &
Chapter 29)
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof coveri ng.
SPRAYED ON
FIREPROOFING: U.B.c.
Standards 43-8.
x
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
y
GLU-LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.c.
STDS. 25-10,11).
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or .before
gypsum board joints and
fasteners are taped and
finished.
X SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
STRUCTURAL MASONRY: (306
a.7)
.In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
)
CURB AND APPROACH
APRONS: After forms are
erected but prior to placi ng
concrete.
-------------------------------------------------------
x
FINAL PLUMBING
x
FINAL ELECTRICAL
,X
y
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
x
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
y
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by'the Building Division
and posted on the premises.
- ----'-
PLANS REVIEWED BY d~~
, '/ .. - /"'
DATE
7-S<G3/
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
Date
9,.. 30-9> /
Signature ~1V~
. u -
C
VALIDATION: AMOUNT RECEIVED' ""3-~2'_? -:? i
RECEIPT #: 7/'7'S-_~
DATE PAID: 9-~~/
RECEIVED BY: ~~ ,.