HomeMy WebLinkAboutPermit Mechanical 1988-11-14
.... '.':'~' ,,:,....:.. . . ........:L..:..~.....;.t..:\... ..-:.;-.....,.\.;..:. .. .'l....\~.:._.... .:.'. ". "',,-..-,, ~'. ..... ~.~:;._..~~~'r~:.....-.(,~........,.:."",~ ::....:...
.".:;. , ..,.......,...:..:'-...."'t; .
.. RESID.TIAl'.'
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
, Rcce~pt II
Job Location:
~ c2 ()... .L.. ~
I?o 3 :20 ;;) '--I
~r'
ASllessors Map #
Subdivision:
T= Lot # 0 ~ l / (()
-/ '---'
Or.mer:
IfJ~kVV )Jtdt~,
tJ f t!3.:2,;;;< s s:T,
Address:
Ci ty :
n
I I
I I
I I
Naw
Addi tien
Remodel
Mobile Home
,I{~,lv-~r
Address
/)
/,~ )", IJ h uP ,_/'"
/J /l
It is the responsibility of the permit holder. to see that aU in";;pectVons are made at the proper time, that each -=ddress is rea::acZe
from the street" and that the permit card is located at the front of the property.
"Bui!ding Divi::ion approved plan shall remain.on the; Building Site at all times.
PROCEDURE FOR INSPECTION RE'QUEST:CALL 726-3769 (recorder) state your City designated joc nw;;ber, job adircss, type of inspec:;icn
requestcd ar.d when you will be ready for inspcction, Contracters or Or.mers name and phone numbcr. Requests received'cefcre 7:00 ~
:.'iZl be made the same day, requests made after 7:00 am will b3 made the n=t :JOrking day.
Date of Application
Contractors
General
Plumbing
Phone: Jtfi - 3-1 C; %
Zip:
DiJ~ ~'
f/1t~~J- 4
Value
~
I Mechar.ic.::Z
n If--- I ',"A.'
L,lYY1/(I!)~ --' L"t1 jJ4~
Lender
Electrical
Construction
Reaui~ed I~sDections
D SITE INSPE'CTION: To be made after
excavation, but prior to set up of
forms.
0, , 'UNDERSLAB PLUMBING. ELECTRIC,1L &
MECHANICAL: To be made before any
work is covered.
~
FOOTING & FOUNDATION: To be made
after trenches are eXcavated and
forms are erected, but prior to
pouring cencreta.
UNDERGROUND PLUMBING. SEf-lER, W.1TER,
DRAINAGE: To be made prior to fiZ-
,Zir..g trenahes.
~
~
J
UNDERFLOOR PLUf.!BING & MECHANICAL:
To be made prior to installation' of
[tOOl' insulation 01' decking.
POST AND BEAM: To be made prior to
installation of floor insulation 01'
decking .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be couered
,until these inspections have been
made and approved.
FIREPLACE: Prior to placir..g faaing
materials and before framing inspea-
tion.
FRA!!ING: Must be requested after
approval of rough plumbing, eleatri-
:cal & mechanical. AU roofing
bracing & chimneys, et~. nr~st be
:' comp leted. flo work is to be con"-
~ cealed until this inspection has
. been made and approved.
~
~
]
Your City Desigr~ted Job NUmber Is:
~
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulatian ~4
required vapor carriers are in place
but cefore any lath, gypsum beard or
wall covering is applied, and before
any insulation is concealed.
'2751
Cis)
\ II J
o
DRYWALL INSPECTION: Te be made
after all drywall is in place,
but prior to any taping.
O MASONRY: Steel location, bond
beams, grouting 01' verticals in
accordance with U.B.C. Section
~:;~~~TOVE: After installation is
JaL cempleted.
,I I~
O CURB & APPROACH AP!'iON: After forms
are erected but prior to pouring
co=rete.
D
SIDEfvALK & DRIl'EfvAY: For aU con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & form work & sub-
, base material in pla::e.
O FENCE: r.'hen complate -- Provide
gates 01' movable sections through 0
P.U.E. ^ fl- r ,<
Pf1)J~.~~.
- ~~~'L
Signed:
Cu
'./(-Ic(-~flY
Date:
Lisc.#
Expires
Phone
gg I ()2()
DElJOLITIO!! OR !.;OVE] BUILDIilGS
~ Sani:;~y s~~er ::apped ~t f~operri lir.e
~ Septi:: tank p~~ed and filled with gra~el
---, Final - h'hen above items are ccmpleted
~ ar.d when demclition is complete or struc-
ture moved and premises cleaned'up.
, Nobi le Hemes
~ Blocking and Set-up
~ Plumbing connections -- scwer and Water
---, Electrical Connection - Blocking, set-up
--l and plumbing, connections iir-ist l;ii approved
, before requesting electrical inspectio~,
~ AcceSs01"d Building
~ Final - Afte,r parches, skirting, decks,
~ etc. are completed.
All projeat conditions, such as the installation of street trees, co~Zetion of the
required landscaping, eta., must be satisfied before the BUILDING FINAL can be requested.
~ FINAL PLUMBlllG
J FINAL ME(;HANICAL
] FINAL ELECTRICAL
]
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbi~
Electrical, and Mechanical Inspectiono have been made and approved.
"ALL MANHOLES AND CLEANOUTS !lUST BE ACCESSIBLE, ADJUST!iElIT TO BE ft~1DE n NO COST TO CITY I Page 1 of 2
JOB NO.{;<f( (J:2/) SOLA',R ACCESS REQ.-
Zone:
OCCUDanCl{ Grou.
LOT TYPE
Lot Sq. Ftg.
~ of lot Coverag~
# of Stories
Total Height
Topography
ITEf.!
SQ.FTG
Main
GaraGe
Carport
Accessorll
S.D.C.
TOTAL VALUE
(vcwc)
1.5 x
Building Permit
State Surcharge
Total Charges
lITEM
I Fixtures
Resid21ltial (1 bath)
NO.
Sanitary Sewer
I Water
I
Plumbing Perr.:it
State Surcr.arge
Total C1u::rnes
11'EM
I Re~. Sa. fta.
I New/Extend Circuits
I
I Temporary Service
I
NO.
'Ete~trical Permit
State Surcharqe
Total Char'ces
ITEM
NO.
Furnace PTU' S
Exhaust Hood
! Vent Fan
I Woodsto:Je
! 'p rLt - Qt/vvv
I
Pernrit Issuance
Me~ hanic:z l Permi t
State Surcharoe
Totql CharoP-G
ENCROACHMENT --
Se~~rity Deposit
Storage
Maintenarwe
Permit
Total Charoes
curbcut
Sidewalk
Fen~e
Electrical Label
Mobile Home
:Ol'Al. AJ.!OiJf,1' Diii;: ~
Interior
Corner
Panhandle
Cul-de-sac
x
Value
FEE
CP.ARC;C;
FEE
Ch'Ai1"C2."
F>;'l;'
~~
CHARCE
l S. (YO
\S .O'lJ
'3<0 . <rrO
,75
30.7S
30,7:5('
l- C 0 G"It:
Type/Cor.st:
Bedrooms:
I Lot Faces -
I Setbacks
I P.L. House Carage
North
East
South
IWest
I Enerny Sources
I Heat
Access. I I ~/ater Heater
I I Range
I I Firer; lace
I I Wood:; tove
I I
T,iJ[le
-- Fees
Building Value & Permit
This permit is granted on the express condition that the sdid construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Crdinance, regulating the construotion
and use of buildings, and m:zy be suspended or revoked at any time upon ,vio-
lation of any provisions of said Ordinances.
*
Plan Check Fee:
Date Paid:
IRecdpt #:
I Signed:
Plumbing Perrrdt
No person shall construct, install, alter or change any new or existing
plumbing or drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a person, may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
I *
Electrica I
Per mi t
Where State Law requires tr.at the electrical work be done by an Electrical
Contractor, the electrical portion of this permit slull not be valid until
the label has been signed by the Electrical Contractor.
Mechanical Permit
,_Lt.
L\tp
*
Plan Exam'Lner
vate
I HAVE CAREFULLY EXAMINED thE completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any arA all work perfor.ned slull be done in accor-
dance with the Ordinances of the city of Springfield, and th~ L~~s of the
* State of Oregon pertaining to the w01\k described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contractors a;:d e:nployees who are in
c~pliance with ORS 701.05S will be used on this project
~~
/1~
""/.- .
1/-' jrj--ff