HomeMy WebLinkAboutPermit Electrical 2011-4-25
225 Firth Street. Springfield, OR 97477. PH(S4I)7:!6-3753. FA..X(541)T'
0v...\1.~1..J(;., ~r
-tt ~IO- C(S)
This permit is issued under OAR 9J 8-309-0000. Permits are nontransferable. Permits expire if worl, is not started within 180
days of issuance or iF ,,..orlt is suspended for 180 days.
Signing supervisor's license no.:
Print name of signing supervisor:
Signature of signing supervis .,
~~
~~
ro \ tx. \ ,tv'
.!HO-2584-J (9/0BICOM)
'~-DEPARTMENT USE ONLY.
SPRINCFI eLD - --~
~,
Pemlit no.: SJ() ~OO t{ ~r
Date:
'f-Z)-If
- . FEE SCHEDULE.. .',..,,'.
-
_Nl.Ll'!lbcI~or inspectiDns per item () .\QIy. Cost-. Total
ea. cost
-
Residential, per unit, service included: - -- "- -
. 1,000 sq. ft. 'or less (4)" I -$134.00 .$-13'1
Each additional 500 sq. fl. or portion '1 $ 25.00 $Joe
thereof -
Limited energy (2) $ 32.00 $
Each manufactured home or modular $ 63.00 $
dwelling service or Feeder (2)
Scn'ices or feeders: installa/iolT, alteratiDIl. relDcation
200 amps or less (2) $ 81.00 $
20110400 amps (2) $ 95.00 $
40llo 600 amps (2) $158.00 $
601 to 1,000 amps (2)-' $205.00 $
Over 1.000 amps or volts (2) $469.00 $
Reconnect only (2) . -- $ 63.00 $
Temporllry services or feeders: instaJ/alioll, alleration, relocation
20D amps or Jess (2) I $ 63.00 $6~
20110 400 amps (2) $ 87.00 $
40110 fiOO amps (2) $126.00 $
Over 600 amps or 1,000 valls, see services or Cceders section obove. _
Branch tircuits: new, alteration. extension per panel
a. Fee for brrmch circuits with purchase of llse'rvice or feeder fee:
EDCh brunch circuit $ 6.00 $
b. Fee for branch circuits without purchase of D. service or feeder fee:
First branch circuit (2) $ 55.00 $
Each iJdditional branch circuit $ 6.00 $
Miscellaneous fees: sen,ice or feeder nol included
ElIch pump or irrigation circ:Je (2) $ 63.00 $
Each sign or outline lighting (2) $ 63.00 $
Signal circuit Dr n limited-energy pone!, $ 83.00 $
alleration, or e1\tension (2)
Each additional inspection: (l) $58.00 $
'So ,.. i," AppUbANTUSE .... :"", , . "."0
..
(A) Enter subtOlal of above fees $217
(Minimum Permit Fec $58.00)
(B) Enler 12% surcharge (.12 x [A]) $3.5'0/
(C) Technology Fee [5% of [A]) $ Itf 6S
TOTAL fees nnd surcharges (A through C): $ 3'-17 ':!'<;
~~ ~ \\~~ (r<<,
\9-/ \'1 (\0