Daily Report of Proprietary Anchors
Client: TEILHABER MANUFACTURING CORPORATION
Project: CABELA' S SPORTING GOOD STORE - RACKING SYSTEM
Address: 3000 GATEWAY STREET - SPRINGFIELD, OR Jurisdiction:
cn representative S. DAUGHTRY OBOA 658, 685
was on site this date Apr. 13, 2011 to perform Special Inspection for:
Pennrt 811-SPR2010-257
cn Job #: El101l45.
SPRINGFIELD
DFS #(s)
PO Nnmber:
SCOPE OF INSPECTION
1. Checked in with superintendent or client representative.
Name: CARL
Company: HOWARD S WRIGHT CONSTRUCTION
2. Inspection was "IBC" D Continuous
GJ Periodic
PROPRIETARY ANCHORS
Yes NoN/A
1. Reviewed previous inspection repons?
2. Reviewed evaluation report?
Verified following items meet manufacmrer's
published installation instrUctions.
3. Verifted mirumum embedment depth of the
anchors. X
4.Verified installation of the anchors. X
5. Verified anchor diameter. X
6. Verified steel grade. x
i. Verified hole diameter. x
8. Verified type of drill bit used. X
9. Verified hole cleaning method. x
10. Verified adhesive application. X
II. Verified edge dtstance. x
12. Verified spacing. x
13. Verified installation torque. y.
Evaluation repon number & date:
Ice ESR 1917
09/01/2007
Name of product being installed
HILTI KBTZ
Batch Number N 1 A
Expiration Date N 1 A
Location of proprietary anchors inspected [to include grid
lines, elevations (floors) and drawing details]:
CTI ON SITE TO PERFORM PERIODIC INSPECTION PER
ENGINEER'S EMAIL DA7ED 04-13-11 ON MECHANICAL
ANCHORS lNSTALLED PRIOR TO INSPECTION. CTI ONLY
HAD ACCESS TO APPROXIMATELY 10% OF THE BOL7S,
FOOTWEA~ WAREHOUSE RACKS DUE TO SHELVING AND
PRODUC~ OBSTRUCTION EMBEDMENT DEPTH WAS VERIFIED
AT 3 - 3/4" BASED ON BO;'T IDENTIFICATION AND
LENGTH Of EXPOSED BOLT (PER ENG:NEER'S EMAIL}.
TORQUE wAS TO BE VERIFIED AT 40FT/LBS. CONTIN...
REPORT SUMMARY
I. Work inspected was: Q Completed 0 In progress
:!. Completed work inspected was not in compliance with
o Approved plans and specifications 0 Shop drawings
o RFI 0 Design change GJ Submittal 0 N/A
Document#(s) ENGINEER'S EMAIL Dated: 04/13/2011
3. Noncompliance item(s) were noted this date. details on
followingpage(s). GJ Yes 0 No 0 N/A
4. Noncompliance item(s) were reinspected this date, details
on following page(s). 0 Yes 0 No GJ N/A
D Conform 0 Remain in progress
Report(s) ftndings were discussed and left with
CONOR KILKENNY
of HOWARD S WRIGHT CONSTRUCTION
Based on the Code. approval is required from the Building Official before the SPECIAL INSPECTED items noted above can
be covered. Carlson Testing has no authority to direct work of comractors or subcontractors.
o See additional report page(s).
o Distribute attachments.
Page _of _
.
,
Daily Report of Proprietary Anchors
en Job #: E1101145.
Project: CABE~.'S SPORTING GOOD STORE - RACKING SYSTEM
For: 04(13(2011
Notes:
TORQUED BOLTS FAILED TO MEET THE 40FT(LBS REQUIREMENT. ENGINEER'S REVIEW AND WRITTEN DIRECTIVE IS
REQUIRED.
[n some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in ft
without prior authorization from this office. Under all circumstances. the information contained in this report is provided
subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other
than those to whom cn has distributed this report shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING. INe.
Reviewed By: Steven Dugger
Review Date: 04/]4/2011
SD/LS
TEILHABER MANUFACTURING CORPORATION
TO: CITY OF SPRINGFIELD BUILDING DEPARTMENT
STRUCTURAL CONCEPTS ENGINEERING - BOB SHARIFY
BHENNESSY@TEILHABER.COM
BOB@SCEINC.NET
TEILHABER MANUFACTURING CORPORATION - DON RUTKOSWKI
DRUTKOW5KI@TEIlHABER.COM
-
,-.,
,
-
u
c.lS
-
- -
- '"
~.-
~.J
-
.= fI:J
- -
'" =
ClI ClI
E-.::
.
- "'0
-
<:> ClI
~ - '"
ClI Ol
~
= c.. <Il
U - ,.
= <Il
<:> "
'" '" '"
= ~ 0
- '"
U
~ 0
..0
Ol
~
'"
Ol "
'" '"
0 ~
~ '"
<Il 0,
<Il
0
0
0
" ~
Ol
" Ol
'" '"
~ ~ "-
~ <Il "'
0: N
0 ,. ,
0, <l; 0
<Il :< ~
Ol 0
<Il ~ N
<l; '"
j " 0.
<Il
Ol 0 ,
[5 0 ~
0 ~
M ro
;.r,
~ ~
"
.
oi. """
0 " """
N .,. Z < Z
.,.; u U ;:: Z
" " E
. - "C' '0' :i
"--
< '" d::t "
"- "-
'"
:<
o
'"
'"
."
~
~-
';; ~
C.
0
U
i::
C?
.
'"
Vi
-
;-
u
~
~
.
~
2
0
U
<Il
<Il -
<Il '"
0 Ol Ol
~ U Ol
U '"
0 <l; ~
Ol "
..0 0 Z 0
~ :li Ol Ol
<l; '"
'" ~
,. 0
'" ..0 <Il 0
Ol '" ~ Ol
~ 0 ..0 '"
<Il 0
,. ~ '" <Il
<Il ~ ~
U Ol
.~ " <Il Ol
~ Z 0 ~ :>
- ~ ~ ~
= '" ;:; ~
U U
~ Ol '" Ol
E 0 0 '"
0 ~
'" '" " 0
0 0 0
'" ~ ~ z
Ol
<Il '" ,. ~
~ 0 ..0 ~
..0 Ol ~
0 <Il ~ '"
'" '" ~ :<
..0
'" --- ~ 0
~ ~ >< ~
'" '" 0
'" 0 '"
" 0, :<
~ 0. Ol
~ ~ <: ~
..0 Ol :>
~ Ol 0 Ol
'" ~ '"
~
~
0
~ N
~ ---
M
~
---
"
0
~ 0 I
<Il
~
'"
~
o
"
"
'"
~
'"
:;:;
u
"
.0'
.
0..
"
l
~
'"
:<
<Il
0
'"
,. '""
'" "
~ '"
'"
e; '"
~Ui 0
0
Z
Ol'"
:;:0
z~'" '"
00: 0
~<l; , ~
~o. ~
':::cu:t~ <:
"'oz '"
o ~ 0
0."", Co.
cr:zw '"
0....0l 0
uoz U
..o~
"...." "
z::oz z
...."'Ol ~
'" "'
OO<ll
f-t...:n... ;:;
UOlo. U
<l;....0l <:
'"'"U '"
:ll'2: 0
~ZO Z
....u "-
:;:'" :;:
0...0
"'<Il<l; '"
Ol '" Ol
"''"0 ~
<:o~
U
:3><=> ::;
....~'" ~
WHt-< Ol
~U<Il ~
5
;-
.
-