Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2002-01229
ISSUED: 03/12/2003
APPLIED: 10/18/2002
EXPIRES: 09/1212003
VALUE: $ 180,000.00
SITE ADDRESS: 5170 Franklin Blvd
ASSESSOR'S PARCEL NO.: 1803034000500
Eugene
TYPE OF
Warehouse
PROJECT DESCRIPTION: Mini-Warehouse
TYPE OF USE: New
Commercial
Owner: FRANKLIN PARK LLC
Address: PO BOX 1548 EUGENE OR 97440
Contractor Type
Architect
Owner
# of Buildings:
Primary Occupancy Group:
Secondary Occupancy
P'rimary Construction Type
Secondary Construction
# of Bedrooms:
SETBACKS
Front yard Setback:
Side 1 Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
Street
Storm Sewer Available:
Special Instruction:
Notes:
Description
'CONTRACfOR INFORMATION I
Contractor
KEATING ENGINEERING
FRANKLIN PARK LLC
, BUILDING INFORMATION I
License
# of Stories: 1
Height of ~Q'1\~
Type of Heat: \~ '\\\'t. S ~c;j,
VN Water TYPR\'\~'t. 't.~~\\ \~
~. R~~~~\~\S \' ~'t.~ ~
~f\}\\f\; 't.~,,:<It\n~\~~~~'ib~'tlt-.~\)\)
,\',\\S \' Ao,\l't.\) ~ (\~ \S.
\~4)t\.),,~d\Wltf'~ORMA nON,
... '1. it'
\)~. \'OIJ"
t-.~'\ Overlay Dist:
# Street Trees
Paved Drive Rqd:
10
B
Expiration Date Phone
541-726-9995
Lot Size:
Sq Ft 1st Floor:
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport:
Sq Ft Other:
Impervious Surface Area:
10,320
REQUIRED PARKING
Total:
Handicapped:
Compa.ct:
IJ\~eS ':10\\\\\'1 ,
leC; <\0\\ ,o~'
()\' \'a.'l'l a Ole" e se\ ~)"
...,,>.0.: ..d \'(\ _~ 2.( _~"..o
IPUBLlC IMPROVEME~'J'S.\~~o~,e~~ose ~;~ ol>-~; IIJ\es;'
~,. ",vs ,,>131. ~ '!c',o~ 0' '" ~o\\
,. '" Iv ee SiilewalR Type'S \e~ . 0\\
Partially Improved ,o\\~ ':\.\0\\ ~,\-\Jv .\\e"'~' :\~e\e ':\.\~\ea.\\
No ~\o':\.\,\e~ t'\S'V'IJ Do~.ls""~outsIDtainsi ~OA'\
. \~ 1>-',.." \\\"'1 al.'" \)\\"" n"-"','
\\\ 0 ,<OIJ ea\\\! e9>O\\ ~~_'t.:r
O'?/:J. t'\ \~e e 01 OO-?;
o a.\X\<;i" 'o~ \~ . ,\-'0
e ~e~ :tel \'0
o.IJ\\\ ee\\
I Valuation Descrintion I
% of Lot Coverage:
Type of Construction
Square Foolaee
$ Per Sq Ft
1 of 5
Value
Date Calculated
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Bid Amount
Use Bid Amount
.
. CITY OF SPRINGFIELD.
Building/Combination Permit
PERMIT NO: COM2002-01229
ISSUED: 03/1212003
APPLIED: 10/18/2002
EXPIRES: 09/1212003
VALUE: $ 180,000.00
$1.00
180,000.00
Total Value of Project
$180,000.00
$180,000.00
10/18/2002
I Fees Paid I
Fee Description Amount Paid Dale Receipt Number
Plan Review Comm/IndlPublic $536.67 10/18/02 1200200000000000091
-Mechanical Issuance Fee- $10.00 3/12/03 1200200000000000819
+ 10% Administrative Fee $122.97 3/12103 1200200000000000819
+ 7% State Surcharge $86.08 3/12103 1200200000000000819
Addressing Assignment $8.00 3/12103 1200200000000000819
Annexed 1999 $-15.67 3/12103 1200200000000000819
Backflow Device $14.00 3/12/03 1200200000000000819
Building Permit $825.65 3/12103 1200200000000000819
Copies - Ea Addtl @ 50 Cnts Ea $2.50 3/12103 1200200000000000819
Copy 1st @ 75 cents $0.75 3/12103 1200200000000000819
Fixture $84.00 3/12/03 1200200000000000819
Minimum/Adjustment Mechanical $39.00 3/12/03 1200200000000000819
Planning Final Occy Inspection $110.00 3/12/03 1200200000000000819
Sanitary Sewer - 1st 50 Feet $45.00 3/12103 1200200000000000819
Sanitary Sewer - Improvement $117.53 3/12/03 1200200000000000819
Sanitary Sewer - Reimbursement $154.63 3/12/03 1200200000000000819
Sanitary Sewer Each Addtll 00' $28.00 3/12103 1200200000000000819
SDC MWMC Administration $10.00 3/12/03 1200200000000000819
SDC MWMC Improvement $61.85 3/12103 1200200000000000819
SDC MWMC Reimbursement $591.15 3/12103 1200200000000000819
SDC Sanitary/Storm Admin $238.13 3/12103 1200200000000000819
SDC Transpo Admin $122.95 3/12103 1200200000000000819
SDC Transpo Improvement $1,824.95 3/12103 1200200000000000819
SDC Transpo Reimbursement $413.61 3/12103 1200200000000000819
Storm Drainage Impervious Area $4,063.62 3/12103 1200200000000000819
Storm Sewer - 1st 50 Feet $45.00 3/12/03 1200200000000000819
Storm Sewer Each Addtll 00' $56.00 3/12/03 1200200000000000819
Vent Fan $6.00 3/12/03 1200200000000000819
Water Line - 1st 50 Feet $45.00 3/12/03 1200200000000000819
Water Line - Each Addtll00' $42.00 3/12103 1200200000000000819
Total Amount $9,695.37
Plan Reviews I
2 of 5
. . CITY OF SPRINGFIELD
Building/Combination Permit
Status: Issued PERMIT NO: COM2002-01229
225 Fifth Street, Springfield, OR ISSUED: 0311212003
APPLIED: 10/1812002
541-726-3753 Phone EXPIRES: 09/1212003
541-726-3676 Fax
541-726-3769 Inspection Line VALUE: $ 180,000.00
Fire Department Review 10/1812002 12/10/2002 OK GRG Plan Review-New
Construction-II Mini- W arehousestl;
S-I; Type II-N construction; 2
buildings on site.
Provide "No Parking-Fire Lane
signs meeting requirement of
state-adopted Manual on Uniform
Traffic Control Devices spaced 25
feet apart along south curb parking
lot (Springfield Uniform Fire Code
901.4.5)
Initial Review 10/18/2002 10/18/2002 APP LLH
Plannine Review 10/18/2002 03/07/2003 APP EMM Waiting for Site Plan Review - in
progress - Colin Stephens planner.
Final Site plan OK on 3/5/03
Public Works Review 10/18/2002 01/31/2003 WE PJO Waiting for Site Plan Approval.
Counter conference regarding
requirements 1/31/03
Public Works Review 01/31/2003 02/28/2003 WE PJO Keating called wanting approval.
Keating called asking for SDC
charges. I gave them to him on
2/28/03. He wanted to pay them. I
said no, not until he has an approved
site plan and approved building
building permit.
Public Works Review 03/06/2003 03/06/2003 APP PJO Received final site plan 3/5/03.
Called and asked for building permit
copies. K said we had enough.
Structural Review 10/18/2002 WE DLM Plan Review comments were faxed
to engineer on 11-22-02.
Structural Review 12/13/2002 12/13/2002 10 LLH Steve Keating provided Fire
Department with new site plan
showing new fire hydrant location.
Please see fire department approved
plans for location.
Structural Review 12/13/2002 WE JMP Accepted Keatings resubmission on
items 1-4 but faxed him 12-10-02
that items 5-7 have not been
addressed satisfactorily.
Structural Review 03/07/2003 03/07/2003 APP JMP Received final data from Public
Works end of the day. Left message
for Chuck Koehn that permit would
be assembled Wednesday, March 12,
2003 and fees would be adjusted for
changes received end of the day.
SUB Review 10/1812002 10/18/2002 WE LLH Applicant stated at counter he would
be bringing in all required energy
forms. We will fax to SUB as soon
as they are received. Ih
3 of 5
~~":";~"..,.,. :.i
Wt:.,,,,.", ,. . ~
~ ,~
.... fl
,. '. .'~
. .. .. ... ... -.' . "-"..~ . ,-"
'''''.'.~ -..- ..,--". ^....
.
.
. CITY OF SrKmhl'lJ!.LIJ
Building/Combination Permit
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
PERMIT NO: COM2002-01229
ISSUED: 03/12/2003
APPLIED: 10/18/2002
EXPIRES: 09/1212003
VALUE: $ 180,000.00
SUB Review
02/24/2003
02/17/2003
WE JF
Received Building Envelope code
form only.
Pass energy code review
SUB Review
02/28/2003
02/28/2003
APP JF
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the fOllowing work
day.
I. Reouired 'nsnections I
1 Site Inspection: To be made after excavation but prior to setting forms.
2 Erosion/Grading Inspection: After all erosion measures are in place.
3 Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or
foundation inspection.
4 Foundation: After forms are erected but prior to concrete placement.
5 Shear Wall Nailing: Before covering sheathing with finish materials.
6 Framing Inspection: Prior to cover and after all rough in inspections have been approved.
7 Wall Insulation: Prior to cover.
8 Ceiling Insulation: Prior to cover.
9 Roofing: Prior to installing any roof covering.
10 Drywall: Prior to taping.
11 Firewall: Located and constructed according to plans.
12 Roof SheathinglNailing: Before covering sheathing with finish material.
13 Final Fire Department. After all requirements of the Fire Department have been met.
14 Final Building: After all Conditions have been completed as required on Development Agreement.
15 Final Building: After all required inspections have been requested and approved and the building is complete.
16 Rough Grading: After gravel is in place but prior to placing concrete.
17 Final Paving: After paving is complete.
18 Underground Plumbing: Prior to filling the trench and including required testing.
19 Undertloor Plumbing: Prior to insulation or decking.
20 Undertloor Drain: Prior to cover or placement of concrete.
21 Rough Plumbing: Prior to cover and including required testing.
22 Water Line: Prior to filling trench and including required testing.
23 Sanitary Sewer Line: Prior to filling trench and including required testing.
24 Line to Septic Tank: Prior to filling trench and required testing.
25 Storm Sewer Line: Prior to filling trench.
26 Final Plumbing: When all plumbing work is complete.
27 Backtlow Device: Prior to covering and provide a copy of the test report on site at the time of inspection.
28 Rough Mechanical: Prior to Cover
29 Final Mechanical: When all mechanical work is complete.
30 Ufor Electrical Ground: Install ground rod at footing and call for inspection in conjuction with footing and/or
foundation inspection.
31 Rough Electric: Prior to Cover
32 Electric Service: Approval required prior to utility company energizing service.
33 Final Electric: When all electrical work is complete.
34 Sidewalk - Curbside: After forms are erected but prior to placement of concrete.
4 of 5
.
. CITY OF ~rKlNGFIELD
Building/Combination Permit
PERMIT NO: COM2002-01229
ISSUED: 03/12/2003
APPLIED: 10/18/2002
EXPIRES: 09/12/2003
VALUE: $ 180,000.00
By signature, I state and agree, that I have carefully examined the completed application and do hereby certifY that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division,
Building Safety. I further certifY that only contractors and employees who are in compliance with ORS 701.005 will be
used on this project.
I further agree to ensure that all re 'red inspections are requested at the proper time, that each address is readable from
~~ea::~~:;st~~tr~; :::;~ is cated at the front of the property, and the ap;i;:sj ~~lans will remain on the site
Owner or Contractors ~re Date
5 of 5
225 Fifth Street
Springfield, Oregon 97477
541-726-3759 Phone
Line Items:
Job/Journal Number
COM2002-0 1229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-0 1229
COM2002-01229
C0M2002-01229
COM2002-0 1229
COM2002-01229
COM2002-01229
3/12/2003
2:43:20PM
City of Springfield
Development Services Department
Public Works Department
Official Receipt
Receipt #: 1200200000000000819
Date: 03/1212003
.
Amount Paid
8.00
4,063.62
154.63
117.53
413.61
1,824.95
591.15
61.85 .
10.00
238.13
122.95
(15.67)
825.65
45.00
28.00
Description
Addressing Assignment
Storm Drainage Impervious Area
Sanitary Sewer - Reimbursement
Sanitary Sewer - Improvement
SDC Transpo Reimbursement
SDC Traospo Improvement
SDC MWMC Reimbursement
SDC MWMC Improvement
SDC MWMC Administration
SDC Sanitary/Storm Admin
SDC Transpo Admin
Annexed 1999
Building Permit
Sanitary Sewer - 1st 50 Feet
Sanitary Sewer Each Addtl 100'
Page 1 00
cReceiptrpt
'!!l~~~~=~ _..~___,._.,.~ ~:
Wi~.'......... ........-........'..
- ' "
,
~""'.,-.' ~ ;
t, II
"......_"';:.___".C,'~,-'"':-.... _f.'-"",~,~
225 Fifth Street
Springfield, Oregon 97477
541-726-3759 Phone
COM2002-01229
COM2002-0 1229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
COM2002-01229
Receipt #: 1200200000000000819
Date: 03/12/2003
Water Line - 1st 50 Feet
Water Line - Each Addtl 100'
Vent Fan
Minimum! Adjustment Mechanical
Planning Final Occy Inspection
Storm Sewer.. 1st 50 Feet
Storm Sewer Each Addtl 100'
Backflow Device
-Mechanical Issuance Fee-
Fixture
+ 7% State Surcharge
+ 10% Administrative Fee
Copy 1st @ 75 cents
Copies - Ea Addtl @ 50 Cnts Ea
Copies - Ea Addtl @ 50 Cnts Ea
Page 2 of3
3/12/2003
2:43:20PM
City of Springfield
Development Services Department
Public Works Department
Official Receipt
45.00
.
42.00
6.00
39.00
11 0.00
45.00
56.00
14.00
10.00
84.00
86.08
122.97
0.75
2.50
6.00
.
Line Item Total:
$9,158.70
cReceipt.rpt
225 Fifth Street
Springfield, Oregon 97477
541-726-3759 Phone
Payments:
TW' of Payment
Check
Receipt #: 1200200000000000819
Date: 03/1212003
Paid By
Received By
Check Number Confirm No
NOHAIR LLC
djb
Page 3 00
3/12/2003
2:43:20PM ,
City of Springfield
Development Services Department
Public Works Department
Official Receipt
.
How Received
Amount Paid
In Person
9,158.70
$9,158.70
Payment Total:
.
cReceipt.rpt
.
.
ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET
JOURNAL OR JOB NUMBER COM2002-01229
NAME OR COMPANY: FRANKLIN PARK LLC.
LOCATION: 5180 FRANKLIN BLVD
MAP & TAX LOT NUMBER: 18-03-03-40 500
DEVELOPMENT TYPE: MINI WAREHOUSE
NEW DEVELOPED AREA (S.F.): 1O,360.OQ
EXISTING DEVELOPED AREA (S.F.):
TOTAL IMPERVIOUS SURFACE (S.F.):
28,820.OQ
ITE:
ITE:
LOT SIZE (S.F.):
151
L STORM ORAINAGF.
DETENTION BASIN
IMPERVIOUS SQ. FT.
DISCOUNT 50%
$ 0,282 PER SF
$8.127.24
TOTAL STORM DRAINAGE SDq $ 4,063.62
28.820
x
2_ SANITARY SEWER-CITY
A. REIMBURSEMENT COST:
NUMBER OF DFU's
B. IMPROVEMENT COST:
NUMBER OF DFU's
(SEE REVERSE SIDE)
7
x
$ 22.09 PER DFU
7
x
$ 16.79 PER DFU
TOTAL LOCAL WASTEWATER SDC,' $
272.16 ~
,,_ TRANSPORTATION
BLOG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
10.36 x 2.5 x $ 16.81 PER TRIP x 0.95
B. IMPROVEMENT COST:
10.36 x 2.5 x $ 74.17 PER TRIP x 0.95
NTF 1$
413.61 1
1.824.951
NTF 1$
TOT AL TRANSPORTATION REIMBURSEMENT SDq $
TOTAL TRANSPORTATION IMPROVEMENT SOC:' $
TOTAL TRANSPORTATION SDq $ 2,238.56 ~
, $
, $
154.63
117.53
4_ SANITARY SEWER. MWMC:
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's 10.36
B. IMPROVEMENT COST:
NUMBER OF FEU's 10.36
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
1$
591.151
x
$57.06 PER FEU
x
$5.97 PER FEU 1 $ 61.85 1
$
TOTAL MWMC REIMBURSEMENT FEE: $
TOTAL MWMC IMPROVEMENT FEE: $
MWMC ADMINISTRATIVE FEE: $
TOTAL MWMC SDC" $ 647.331
SUBTOTAL (ADD ITEMS 1.2.3,&4)
, $
7,221.671
.
~. ADMINISTRATIVE FEES,
BASE CHARGE (SUBTOTAL ABOVE)
$
7.221.67 x 5% $ 361.08
TOTAL TRANSPORTATION ADMINISTRATION FEE:I $
TOTAL SEWER ADMINISTRATION FEE: $
pa""-flaJ. ow""b el-J
SOC COORDINATOR
1131/2003
DATE
TOTAL SDC CHARGES
COM2002..o1229. FRANKLIN PARK lLC, 5170 FRANKLlN.xls
413.61
1,824.95
(15.67)
591.15
61.85
10.00
"''' I
238.13 107
J
-
I $
7,582. 75 ~
JULY 2001
.
.
DRAINAGE FIXTURE UNIT (DFU) CALCULA TION TABLE
NUMBER OF NEW RXTURES x UNIT EQUIVALENT'" DRAINAGE FIXTURE UNITS
(NOTE, FOR REMODELS. CALCU~TE ONLY THE NET ADDITIONAL AXTURES)
FIXTURE TYPE
BATHTUB
DRINKING FOUNTAIN
FLOOR DRAIN
INTERCEPTORS FOR GREASE/OIUSOLlDS/ETG.
INTERCEPTORS FOR SAND/AUTO WASH/ETG.
LAUNDRY TUB
CLOTHES WASHER/MOP SINK
CLOTHES WASHER - 3 OR MORE (EA)
MOBILE HOME PARK TRAP (I PER TRAILER)
RECEPTOR FOR REFRIGERA TOR/WATER ST A TION/ETG.
RECEPTOR FOR COMMERCIAL SINK! DISHW ASHER/ETG.
SHOWER, SINGLE STALL
SHOWER, GANG (NUMBER OF HEADS)
SINK, COMMERCIAL. RESIDENTIAL KITCHEN
SINK, COMMERCIAL BAR
SINK, WASH BASIN/OOUBLE LA V A TORY
SINK, SINGLE LAVATORY/RESIDENTIAL BAR
URINAL. ST ALUW ALL
TOILET, PUBLIC INSTALLATION
TOILET, PRIVATE INSTALLATION
MISCELLANEOUS,
FIXTURES
NEW OLD
NUMBER OF EDU'S'
UNIT
EQUIVALENT
3
I
3
3
6
2
3
6
12
I
3
2
2
3
2
2
I
5
6
3
*EDU (Equivalent Dwelling Unit) is a dischar~e eauivalent to a single family dwel1in~ (20 DRJ) set al 167 ~Ilons ner day
TOTAL DRAINAGE FIXTURE UNITS~
DRAINAGE
FIXTURE
UNITS
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
I
o
6
o
o
o
o
7
CREDIT CALCULA nON TABLE, BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXA TION DATE IN TABLE, CALCULATE CREDITS SEPARATELY
YEAR RATE PER $1,000 YEAR RATE PER $1.000
ANNEXED ASSESSED VALUE ANNEXED ASSESSED VALUE
1979 or before $ 4.92 1990 $ 2.06
1980 $ 4.83 1991 $ 1.64
1981 $ 4.77 1992 $ 1.45
1982 $ 4.64 1993 $ 1.31
1983 $ 4.47 1994 $ 1.13
1984 $ 4.30 1995 $ 0.97
1985 $ 4.09 1996 $ 0.82
1986 $ 3.78 1997 $ 0.63
1987 $ 3.41 1998 $ 0.41
1988 $ 2.98 1999 $ 0.22
1989 $ 2.52 2000 $ 0.04
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE $ 022 x 71.241 $15.67
IMPROVEMENT (IF AFTER ANNEXATION DATE) x $0.00
CREDIT TOTAL $15.67
COM2002-01229, FRANKLIN PARK LLC, 5170 FRANKLlN.xls
JULY 2001