HomeMy WebLinkAboutPermit Plumbing 1989-8-17
.. RES IDE N T I A l . .
APPLICAT j, 'PERMIT
225 North 5th Street
SpringfieZd" Oregon 97477
Building Division
726-3753
Job Location:
\-;.,1\4- ~ ~~U t.'
[ CAJner: \'\'l\ \\ .~~. i--\lY'101\./ "
Address: \ 8.\~ ,1; ,,0\~OJl,t Phone:
CitY'~I~)tOfi I ~ Zip' Q141'1
I Nf?W
I Additicn
I Remodel
I !Iobi le Home
~/sotJ. 0 c.>
Date of Applicaticn Value -r)
Contractors Address 'Lisc. It ,Bid c-
Gen~raL Albert F enco ,Co. ,1385 Skyl i ne, Eug. 60686
iPlumbing Right-Way Plumbing, Eug/Spfld 20-195PB
I Hechanical
I E],ectrical
J Supervi"'Sing Electr~cian
It is the responoibil~ty of the permit ho~er to see that all inspections are made at the proper tim~, that each ~ddress is readabZe
fI'om the street, and that the permit oard is located at the front of the propeI'ty.
~Bui!ding [)1~vidon apPI'oved plan shall remain on the Building Sita at all times.
, . /
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (rccorder) state your city designated job nwnber, job adQ:rcss, type of in3pec::icll
I'equestcd ar.d when you will be ready for inspection, COlltI'actors or CAJners name and p}wne number. Requests received befcre 7:00 ~
L.'iU be made the same daYi requests made after -? :00 am IJiZl-'be niade the next- WOl'kir.g day.
~()fJj4A
Asoessors Map #
Subdivision:
Reauirf?d InsDf?cticns
O SITE INSPECTION: To be TTrJ.de after
excavation, but prior to set up of
forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
, MECHANICAL: To be made before any
work is ~oveI'ed.
Tax Lot #
Describe I,'ork:
\Dll:ib ~
0JL
Rcce:pt .'/
/cf&b /
Signed:
Ch/7?/.7 o.JAA.A'~
t/' R- / /- f?9
~ Date:
Hoard R~
Exoir,es
PhOJ1P
~"b~': 484-2258
741-2242
Your City DeGigr.ated Job Number Ia:
'0 INSULA, TION/VAPOR BARRIER INSPECTION:
To be made after all insulation ~~
", l'aquired vapor barriers are in plaoe
, 'but before any lath, gypsum board or
wll covering is ~pplied, and before
'any inauZation is concealed.
D FOOTING & FOUNDATION: To be TTrJ.de 0 DRYWALL INSPf:CTION: Tc be made
' afteI' trenches are excavated and after all drywall i8 in place,
, forms are erected, but prior to but prior to any taping.
pouring ccncrete. '~' ,
~ 1;' '1;' . " 0 MASONRY: Steel location, bond
" U.~DuRGRO~.'W PLUMBING. Su~R. W.1T~R, , beams, grouting or verticals in
D,:AINAGE. To be TTrJ.de p1'1.or ,accordance with U. B. C. Section
'hr.g trenchee. ',' '2415.
D, UNDERFLOOR PLUMBING & MECHANICAL: 0 WOODSToVE: After installation'i8
, To be made prior to installation of ccmpleted.
floor insulation 01' deoking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking.
ROUGl! PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to bc covered
,until thcse inspections have beer.
made and approved. '
FIREPLACE: Prior to pZacir.g facing
materials and before framing in8pec-
tion.
D FRAMING: Must be requested after
approval of rough plwnbing, electri-
cal & mechanical. All roofing
b~acing & chimneys, et~. must be
: completed. No work is to be con-
-, cealed until thia in8pection has
. bee,n made and approved.
o
D
D
D
o
CURB & APPROACH APRON: After' forms
are erected but prior to pouring
concrete.
6/91
DENOLITION OR !-JOVED BUILDINGS
~ Sanitary 8e'.Jer capped at p~op<lrty line
~ Septi~ tank p~ed and filled with graJel
I Final - 1.'hen above item8 are completed
~ and when demolitior. is complete or stru~-
ture moved and pr<lmises cleaned up.
Mobile Homes
~ Blocking and Set-~p
~ Plumbing connections scwer and water
~ Electrical Connection - Blocking, set-up
~ and plumbing connections nr~st ce approved
beforc requesting electrical inspec::io~
:==J Acce8sory Building
~ Final - After porches, 8kirting, decks,
---l etc. are completed.
D
All project condition8, ouch as the installation of street trees, co,~lation of tne
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
o FINAL PLUMBING
D FINAL MECHANICAL
D FINAL ELECTRICAL
o
SIDEWALK & DRIVEWAY: For aU oon-
crete paving within street right-
of-way, to bc made after all exca-
vating canplete & form work & sub-
, base material in place.
~NCE: K'hen complete -- Provide'
~ ~~tes or movable 8ection8 through
P.U.E. '
o
-.,.-
o
FINAL BUILDING: The Final Building Inspection must be requeiJted after the Final Plumbing
Electrical, and Mechanical Inspectiona have been made and approved.
~~LL MANHOLES AND CLEANOUTS NUST BE, A,CCESSIBLE, AD.TUST!lENT TO BE ftL1DE AT NO COST TO CI'!'Y I Pa~7e ! of 2
. ' ,
L-COC-J;-
I JOB
I Zone:
No.8CfOPARSOLAR ACCESS REQ.-
Type/Cor.a t:
Bedrooms:
Occuoancy Cn,
Lot Sq. Ftg.
~ of lot Coverag~
,q of Stories
Total Height
Topography
ITEM
SQ.FTG
Main
Garaae
Carpol't
AccessorII
WT TYPE
Interior
Cornel'
Panhandle
Cul-de-aao
x
Value
Res. Sa. ftC{.
I New/Extend Cirouits
I Temporary Service
I
Eleatrioal Permit
State Suraharge
I iTEM
, Furlwce ETU' S
Exhaus t Hood
Vent Fan
Woodstove
Permit Issuanoe
Meahanioa l Permi t
State Surcharae
, Total Charqeo
I .- ENCROACHMENT --
Ise~~rity Deposit
Storage
Maintenance
Parmit
I
Total Charqes
eurbcut
Sidez.Jalk
I ["enae
I Electrical
Label
Mobile Home
1"'()7'A r. A.^fI1UNT n!/F:: ~
CHARGE:
. \~.(X)
,'l~
,\SJ15 *
I ' CHARGE
FEE
CHARGE
,~.rD
I
I
I
I I
~D "-151
Lot Faces -
I Enerqy Sources
I !leat
I
I
I
I
I.
Tyroe
Setbacks
P.L. 'IIOlwe Cm'age" Access.
North
East
South
~Weot
Water Heater
Range
Fireplace
Wood;;tove
-- Fees
Building V~lue & Permit
This permit is granted on the express condition that the said construction
shall, in all respeots, conform to the Ordinance adopted by the City of
Springfield, inc?uding the Zoning Crdinance, regulati/lg the cCl1struaticn
and uoe of buildings, and may be suapended or revoked at c:ny time upon vie:'
lotion of any provisions of said Ordinances.
IPlari Check Fee:
I Date' Paid:
IRecdpt #:
\ Signed:
Plumbing Permit
No person shall construct, install, alter or ohange any new cr e:::isting
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, exoept that a pe~son may do
plumbing work to property which is owned, leased or operated by the appli-
oant. '
E I e c t r i c a I Perm i t
~_.-" . -
T Where -state-law-requires -that thir e iedtrical-'workbe 'done by an. Electrioa L
Con trao tor, the eleotrical portion of this permit shall r~t be valid until
the ~el has been signed by the Electrical Contractor.
*
Mechanical
Permit
Plan Examiner
Vate
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby oertify that all information hereon is true and correct, and I
further oe1'tify that any ar.d all work pe1'for:ned s}lall be done in acoo1'-
danae with the Ordinanoes of the city of Springfie~~ and th~ Ur~s of the
* State of Oregon pertaining to the work described here~n, and that NO OCCU-
PANCY will be rrr:zde of any structU1'2 without permission of the Building Di-
vision. I further certify that o~ly contractors ar~ e~ployees who are in
oomplianoe with ORS 701.055 will be used on this p1'ojeot
,0~~C~,
Sign2d / /
y- /7-Yi
Date