Dear Andy:
SUBJECT:
.SITE PLAN TENTATIVE #DRC2010-00023 JACKSON'S FOODS
TiixMap'j 7-03-22-20, Tax Lot 901; 3375 Gateway Street
~._~ '........_..~..... .. ..............
It appears there is no change in water service to the site. If any changes need to occur in the future, then
listed below are our comments for the above referenced development proposal:
I. The proposed development is within the Springfield city limits and will receive water service
from the Springfield Utility Board (SUB).
2. All~ew )Vater systemfaciliiies and modifications to 'Yater system facilities.both inside an~ .
adjacent .to, the p[op.osed dev~lopment shall.be placed)n street right-of;)'iay ala 10catiOlyand
depth of bury that meets the standards of the SUB Water Division.
3. Ali ~ater facility' materials shall be to a standard that must meet SUB Water Division
specifications.
4. All workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB
Water Division and the long-range needs of the City. These needs include, but are not limited to,
meter location-and access,-sizes.of-water-distribution and transmission lines, pumping-facilities,
and communication lines.
. ,.~
6. Please ask the deve!oper:to contact the SUB Wat.erDivision for' detailed information on the
materials and construction standards, detailed costs for installing SUB water facilities, and a.. . .
schedule of construction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities installation, and joint trench opportunities.
7. All water meters will be placed in public right-of-way at a location identified by the developer.
Each lot or parcel must have its own water service. .: . . ..
8. Water service facilities will be installed upon collection of development charges,. Development
policies and charges identified in this:letter are subject to change. Actual.charges;)Vill bethose in
effect at the time water service is requested.
S:\SITEPLAN\3375 Gateway Street site plan 7- 16-JO.docx
Date, Neceived:
Planner: AL
7b,!po
/ '
,
;
,1
j
.
.
9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water
comes from wells. In every instance, care shall be taken to prevent groundwater contamination.
Contractors/developers/owners shall be responsible for the safe handling and storage of
chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water
runoff contamination.
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396.
10. Backflow prevention devices will be required for this service. Please contact Scott Higley at 726-
2396 prior to installing water service. Scott can help in the selection of the most economical
device and location. Water service will not be provided until a backflow plan has been submitted
to SUB Water Engineering and approved for installation.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division and
SUB Electric Division.
Si~~~
Rebecca Templin, P.E.
Water Engineering Supervisor - Water Division
RAT:mt
cc: John Jackson, Jackson's Food LLC, 3450 East Commercial Court, Meridian, Idaho 83642
Ron Thienes, Ronald E. Thienes, Architect, P.O. Box 25, Walterville, Oregon 97489
S:\SITEPLAN\3375 Gateway Street site plan 7-16-IO.docx
Date Received:.Jp!)lJIO
Planner: AL