HomeMy WebLinkAboutNotice PLANNER 4/20/2006
,
~-
.
.
~()Y-
.
,
AFFIDA VIT OF SERVICE
ST A TE OF OREGON)
) ss.
County of Lane )
I, Karen LaFleur, being first duly sworn, do hereby depose and say as follows:
1. I state that I am a Clerk III for the Planning Division of the Development Services
Department, City of Springfield, Oregon.
2. I state that in my capacity as Clerk III, I prepared and caused to be mailed copies
SiJC32.,oOb-Dalt3. . <;
of (See attachment "A") on
z..o ,2006 addressed to (see Attachment B"): by causing said letters to be
placed in a U.S. mail box with postage fully prepaid thereon.
J!t~ eNt d/ A6MA
K R La'FLEUR
STATE OF OREGON, County of Lane
~.dlO , 2006. Personally appeared the above named Karen LaFleur, Clerk III,
w acknowledged the foregoing instrument to be their voluntary act. Before me:
~~ on MIf
My Commission Expires:
/I~Z!rf6
I I
.' OFFICIAL SEAL
, SANDRA MARX
\, .J NOTARY PUBLIC. OREGON
',,' COMMISSION NO, 385725
MY COMMISSION EXPIRES NOV, 12, 2008
Date Received: i.f.- 20- Dc:'
Planner. ' 5D
I of l'oe~
;.
.
.
NOTICE OF DECISION - PROPERTY LINE ADJUSTMENT
DATE OF LETTER
April 20, 2006
JOURNAL NUMBER
SUB2006-000 13
Owner: Civil Engineering Consultants
Symantec Corporation Balzhiser & Hubbard Engineers
Contact: Gary Robak Contact: Clell Goodwin, PLS
555 International Way PO Box 10347
Springfield, OR 97477 Eugene, Oregon 97440
Applicants: Property Location
SARES REGIS Group of Northern California 555 International Way
Contact: Zach Wilson, Project Manager Springfield, OR 97477
90 I Mariners Island Boulevard, Suite 700
San Mateo, CA 94404 ~ Assessor's Map 17-03.-15-30, Tax Lot 500
650-377-5821 Assessor's Map 17-03-15-40, Tax Lot 700
DESCRIPTION OF PROPOSAL
This is an application to move the common property line between two tax lots owned by the
Symantec Corporation. The purpose of the request is to place the common property line between
the two main wings of the existing structure. Approval of the requested property line location and
a proposed deed restriction will resolve building setback issues and provide guidelines for
separation of the properties if necessary in the future.
SITE INFORMATION AND BACKGROUND
The site proposed for this property line adjustment is the existing Symantec Campus on the north
side of Game Farm Road at Maple Island Road, in Springfield. Thepioperty is zoned Campus
Industrial (CI) and designated for Campus Industrial use in the Metropolitan Area General Plan.
The west wing of the existing structure is nearing completion under Site Plan Approval
(DRC2005-00047); partition plat lines on the property were recently vacated (LRP2006-000 I).
DECISION .
Preliminary.Plan approval with conditions is granted as of the date ofthis letter. Preliminary Plan
approval expires 90 days from the date ofthis letter. Final Map Approval shall be granted upon
receipt of the final map delivered to the Development Services Department together with any
documents required as a condition of approval.
-,
.
.
CRITERIA OF APPROVAL (SDC33.060)
The application shall be approved, approved with conditions, or denied based on compliance with
the criteria of Section 33.060 of the Springfield Development Code (SDC). SDC 33.060 states
that the Property Line Adjustment shall not:
(1) Create a new lot or parcel;
Finding #1: This proposal adjusts the property line between two pre-existing lots. No new lots
are being created.
(2) Create a landlocked lot or parcel;
Finding #2: Both lots have street frontage and access on Intemational Way and Game Faml Road
East. No landlocked lots or parcels will be created.
(3) Reduce an existing lot or parcel below the minimum size standard or
reduce setbacks below the minimum established. by the applicable zoning
districts in this Code;
The properties involved in this request are zoned CI and are therefore subject to the lot size
standards of SDC 21.070(1) which requires 10,000 square feet and 75 feet offrontage. SDC
21.070(2-4) sets setback standards of 50 feet for exterior boundaries, 30 feet of planted setbacks
from collector street frontages and 20 feet of building separation (zero lot line construction
allowed in accordance with adopted building codes). .
Finding #3: Both tax lots, as adjusted through this application, meet the lot size requirements of
SDC 21.070 because both exceed 10,000 square feet of area and 75 feet of frontage.
Finding #4: The setbacks of the existing structure from exterior boundaries of the CI District along
Game Farm Road (E) south of the site, where abutting the CC and LDR Districts, comply with SDC
21.070(2) because approximately 70 feet of setback is provided.
Finding #5: Pursuant to SDC 21.070(2), the two-winged structure straddling the proposed
common property line constitutes a zero setback as allowed by the Springfield Development
Code. (See other Conditions Imposed under Criterion 4, below).
Finding #6: The submittal complies with the applicable lot size and setback standards of the
Springfield Development Code. .
. (4) Violate any previous conditions the Approval Authority may have
imposed on the lots or parcels involved in the application;
Finding #7: The proposed deed restriction satisfies the requirements of Condition #8 contained
in DRC2005-00047, Site Plan Approval for Phase II of the Symantec campus. There are no other
previous conditions of approval imposed on either of the lots involved in this application.
Conclusion: The Director, in consultation with the Building Official and the City Attomey, find
that the building designs approved under Site Plan DRC2005-00047, in conjunction with the
~ubmitted property line adjustment and deed restriction, meet all applicable zoning and building
2
Property Line Adjustmelll
SUB2006-000/3
April/9. 2006
.
.
conditions imposed on the subject properties. The proposed deed restriction is acceptable as
submitted and shall be filed pursuant to the following condition:
Condition I: Prior to Final Survey Approval or Final Occupancy (as applicable), the applicant
shall submit a copy of the proposed Deed Restriction with Attachments and Exhibits for review,
.approval and filing with the final survey and lot descriptions.
(5) Detrimentally alter the availability of existing public or private utilities
to each lot or parcel in the application or to abutting lots or parcels;
Findiug #8: The availability of existing public and private utilities will not be altered by the
approval of this property line adjustment because both properties are under the same ownership
'and the existing location of, and access to, easements has been reviewed and approved under Site
Plan Approval DRC2005-00047.
(6) Increase the degree of non-conformity of each lot, parcel or structure
that is non-conforming at the time of application.
Finding #9: The lots involved 'with this property line adjustment were not non-conforming at !he
time of application nor will they be under the proposed property line adjustment. There are no
non-confonning structures on either lot.
CONCLUSION
Based on these findings of fact, staff finds Property Line Adjustment SUB2006-000 13 complies
with the criteria of Article 33, Section 33.060 of the Springfield Development Code and is
therefore approved with the conditions as specified below.
WHAT NEEDS TO BE DONE BY THE APPLICANT TO OBTAIN FINAL APPROVAL
Within 90 days of the date ofthis letter the following conditions and procedures shall be
met:
1. Prior to Final Survey Approval or Final Occupancy (as applicable), the applicant
shall submit a copy ofthe proposed Deed Restriction with Attachments and Exhibits
for review, approval and filing with the final survey and lot descriptions.
2. Tbe applicant shall submit a Final Survey prepared, stamped and signed hy an
Oregon registered Land Surveyor in accordance with ORS 92.010(7) (b), ORS
. 92.060(3) and ORS 209.250.
3. One copy ofthe Final Survey shall be delivered to the Development Services
Department together with any conditioned documents.
4. Once the Director and City Surveyor have certified that all conditions listed under
p'reliminary Survey approval have been met, the Final Survey may be recorded at
the Lane County Surveyor's Office.
5. The owners ofthe lots or parcels included in the application shall record with Lane
County Deeds and Records Property Line Adjustment deeds, as specified in ORS
92.190(4). The Property Line Adjustment deeds shall contain the names of the
parties, the description of the adjusted line, reference to original recorded
documents and signatures of all parties with proper acknowledgment. The Property
3
Proper{v Line Adjllstl'r:ent
SUB2006-000/3
April/9.2006
.
.
Line Adjustment deeds shall also identify the PlaI!ning file uumber and shall
contain a statement declaring that the purpose of the deeds is for a Property Line
Adjustment. Reference to the affected properties by map and tax lot number shall
be in addition to reference by legal de.scription. In the case of serial Property Line
Adjustments processed under Type II procedure, each Property line Adjnstment
deed for the lots or parcels in the series shall be recorded separately, in the sequence
of City approval. .
6. A copy of the recorded Final Survey and deeds shall be delivered to the
Development Services Department together with any other recorded documents that
may have been required.as a condition of approval.
. EXPIRATION OF APPROVAL
The Property Line Adjnstment preliminary approval shall become null and void if:
I. The Final Survey and any conditions of approval have not been submitted to the City in a
complete form within 90 days of the date of Preliminary Survey approval; or
2. The Final Survey is not submitted to the Lane County Surveyor within 30 days of the
City approval; or
3. The Property line Adjustment deed or other conditioned documents have not been
recorded with Lane County Deeds and Records. with the Final Survey.
APPEALS
This Property Line Adjustment request is considered a decision ofthe Director and as such can be
appealed to the Planning Commission. An appeal must be filed at the Development Services
Department by an affected party by 5:00 P. M. on May 4,2006. An appeal must be in accordance
with the Springfield Development Code, Article 15, Appeals. The appeal must be submitted on a
City form and be accompanied by a $250 filing fee. TIle fee will be returned to the appellant if
the Planning Commission approves the appeal application.
OUESTIONS
Please call Jim Donovan in the Development Services Department at (541) 726-3660
if you ha,:e questions regarding this application.
4
Proper~1' Line Adjustment
SUB2006-000 /3
April /9, 2006
...._~ -....... .~....... .......,,,'......"'"
PLANNING DEPARTMENT
225 FIFTH !3TREET
SPI'1INGFIELD, OR 97477
............... .~._.". ....-..~._--
PLANNING DEPARTMENT
225 FIFTH STREET
SPRINGFIELD, OR 97477
r.M-Ml-- U
DEVELOPMENTSERWCES
PLANNING DEPARTMENT
225 FIFTH STREET
SPRINGFIELD, OR 97477
--- ....
. .
Symantec Corporation
Gary Robak
555 International Way
Springfield, OR 97477
Balzhiser & Hubbard Engineers
Clell Goodwin, PLS
PO Box 10347
Eugene, OR 97440
~~~
Sares Regis Group
Zach Wilson
901 Mariners Island Blvd, Ste 700
San Mateo, CA 94404
()::tt-~ r~