Loading...
HomeMy WebLinkAboutPermit Building 2007-7-27 Status Iss u ed CITY OF SPRINGFIELD. Building/Combination Permit PERMIT NO: COM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 0111112008 VALUE: $ 212,434,907.00 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line SITE ADDRESS: 3333 RiverBend Dr ASSESSOR'S PARCEL NO.: 1703220000902 Springfield TYPE OF WORK: Hospital TYPE OF USE: New Commercial PROJECT DESCRIPTION: Riverbend Hospital Owner: PEACEHEAL TH Address: PO BOX 1479 EUGENE OR 97440 I CONTRACTOR INFORMA nON I Contractor Type Architect General Electrical Low Voltage Electrical Plumbing Contractor License ANSHEN & ALLEN TURNER CONSTRUCTION COMPANY 69988 E C COMPANY 49737 SECURECOM INC 117195 BOHEMIA PLUMBING & CONSTRUCTION l41468 BUILDING INFORMATION I Expiration Date 11/09/2007 01/15/2008 09/07/2007 03/03/2007 Phone 415-882-9500 503 229-6000 503-224-351 i 541-988-3585 541-942-8333 # of Units: Primary Occupancy Group: Secondary Occupancy Group: Primary Construction Type Secondary Construction Type: # of Bedrooms: 1-1.1 B IFR # of Stories: Height of Structure: Type of Heat: Water Type: Range Type: Energy Path: Sprinkled Building: Lot Size: Sq Ft 1st Floor: Sq Ft 2nd Floor: Sq Ft Basement: Sq Ft Garage/Carport Sq Ft Other: Occupant Load: n/a I DEVELOPMENT INFORMA nON I Frontyard Setback: Side 1 Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: Overlay Dist: # Street Trees Rqd: Paved Drive Rqd: % of Lot Coverage: REQUIRED PARKING Total: Handicapped: Compact: AI fCI.J110N: Oregon law requlre~ l}1)iBldC IMPROVEMENTS I follow nlles adopted by the Orego",,",u(III1Y Street IWSfltfauOWt:enter. Those rules are set forth NOTICE- Sidewalk Type: ~~::7:.I=~:''=;~~t~~;~~~~~ ~~~e9r~~~~O~~ THIS PERMIf~~~mrIF THE WORK calling the center. (Note: the telepr.one AUTHORIZED UNDER THIS PERMIT IS NOT Notes: number for the Oregon Utility Notification COMMENCED OR IS ABANDONED FOR Center Is 1-800-332-2344). ANY 180 DAY PERIOD. Pal.!:e 1 of 27 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Description Tvpe of Construction Estimate Estimate Estimate Estimate Fee Description Plan Review Comm/Ind/Public Plan Review Fire & Life Safety + 1 % Seismic Fee + 10% Administrative Fee + 7% State Surcharge Building Permit + 10% Administrative Fee + 7% State Surcharge Fixture Sanitary Sewer - 1st 50 Feet Special Waste Connection Deposit + 10% Administrative Fee + 7% State Surcharge Plan Review Plumbing (30%) Sanitary Sewer - 1st 50 Feet Sanitary Sewer Each Addtll00' Special Waste Connection Storm Sewer - 1st 50 Feet Storm Sewer Each Addtll00' + 10% Administrative Fee + 7% State Surcharge Add, Alter, Extend Circ Ea Add Low Voltage - Commercial Indus Perm Serv/Fdr 1000 amps/volts Perm Serv/Fdr 200 amps or less Perm Serv/Fdr 201 to 400 amps Perm Serv/Fdr 401 to 600 amps Perm Serv/Fdr 601 to 999 amps Plan Review Electrical (25%) + 1 % Seismic Fee + 10% Administrative Fee + 7% State Surcharge Building Permit + 10% Administrative Fee CITY OF SPRINGFIELD I Building/Combination Permit PERMIT NO: COM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 0111112008 VALUE: $ 212,434,907.00 I Valuation Descriotion I $ Per Sq Ft or multiplier $1.00 $1.00 Square Footage or Bid Amount 212,186,907.00 248,000.00 Value Date Calculated $212,186,907.00 $248,000.00 $212,434,907,00 07/01/2005 06/08/2005 Total Value of Project ~ Amount Paid $443,476.63 $272,908.69 $5,518,79 $55,187.86 $38,631.51 $551,878.72 $21.60 $15.12 $14.00 $90.00 $112,00 $10,000.00 $293.20 $205.24 $1,029.13 $45.00 $560.00 $1,162.00 $45.00 $1,120.00 $14,201.30 $9,940.91 $22,602.00 $63,585.00 $19,125.00 $15,057.00 $18,150.00 $1,375.00 $2,119.00 $41,538.81 $1,379.70 $13,796.97 $9,657.88 $137,969.68 $5.90 Date Paid Receipt Number 12/6/04 12/6/04 7/1/05 7/1/05 7/1/05 7/1/05 7/6/05 7/6/05 7/6/05 7/6/05 7/6/05 7/8/05 8/22/05 8/22/05 8/22/05 8/22/05 8/22/05 8/22/05 8/22/05 8/22/05 9/2/05 9/2/05 9/2/05 9/2/05 9/2/05 9/2/05 9/2/05 9/2/05 9/2/05 9/2/05 10/21/05 10/21/05 10/21/05 10/21/05 2/7/06 2200400000000001481 2200400000000001481 2200500000000000873 2200500000000000873 2200500000000000873 2200500000000000873 1200500000000000955 1200500000000000955 1200500000000000955 1200500000000000955 1200500000000000955 2200500000000000902 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001132 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001211 2200500000000001477 2200500000000001477 2200500000000001477 2200500000000001477 3200600000000000057 Pal.!:e 2 of 27 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line + 8% State Surcharge Plan Review Plumbing (30%) Storm Sewer - 1st 50 Feet Storm Sewer Each Addtll00' + 10% Administrative Fee + 7% State Surcharge Fixture Special Waste Connection Storm Sewer - 1st 50 Feet Storm Sewer Each Addtll00' Plan Review Comm/Ind/Public Plan Review Fire & Life Safety ~Mechanical Issuance Fee~ + 10% Administrative Fee + 7% State Surcharge Air Handling Unit 10,000 & Ovr Air Handling Unit Up to 10,000 Appliance Not Listed Appliance Vent Backtlow Device Evaporative Coolers Exhaust Hoods Fixture Furnace - more than 100,000 Furnace - Unit Heater Furnace - up to 100,000 btu Gas Outlets 1-4 Gas Outlets 4+ Heat Pump Inspection - Preliminary Medical Gas Base Fee Medical Gas Each Inlet/Outlet Medical Gas Plan Review Not Covered Mechanical Plan Review Electrical (25%) Plan Review Mechanical (25%) Plan Review Plumbing (30%) Plan Review Plumbing (30%) Sanitary Sewer - 1st 50 Feet Sewage Ejector Pump Special Waste Connection Trap or Waste not Conn to Fixt Vent Fan Water Line - 1st 50 Feet Water Line - Each Addtll00' + 10% Administrative Fee + 8% State Surcharge Add, Alter, Extend Circ Ea Add Temp Power 201 - 400 amps $4.72 $159.30 $45.00 $14.00 $14.30 $10.01 $56.00 $14.00 $45.00 $28.00 $125.58 $77.28 $10.00 $10,748.00 $7,523.60 $435.00 $112.00 $28,260.00 $288,00 $210,00 $72.00 $90.00 $37,450.00 $90.00 $300.00 $18,804.00 $4.00 $6.00 $264,00 $45.00 $219.00 $14,625.00 $4,453.20 $540.00 $-6,035,53 $12,334.50 $-149.53 $12,992.40 $45.00 $112.00 $4,172.00 $1,260.00 $18.00 $45.00 $14.00 $9.00 $7.20 $21.00 $69,00 2/7/06 2/7/06 2/7/06 2/7/06 3/9/06 3/9/06 3/9/06 3/9/06 3/9/06 3/9/06 3/10/06 3/10/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 3/22/06 5/15/06 5/15/06 5/15/06 5/15/06 Pal.!:e 3 of 27 CITY OF SPRINGFIELD' Building/Combination Permit PERMIT NO: COM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/0612004 EXPIRES: 01111/2008 VALUE: $ 212,434,907.00 3200600000000000057 3200600000000000057 3200600000000000057 3200600000000000057 2200600000000000287 2200600000000000287 2200600000000000287 2200600000000000287 2200600000000000287 2200600000000000287 1200600000000000285 1200600000000000285 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000366 2200600000000000602 2200600000000000602 2200600000000000602 2200600000000000602 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line + 10% Administrative Fee + 8% State Surcharge Low Voltage - Commercial Indus Pian Review Electrical (25%) Refund - Admin Fee Refund - Electrical Refund - Surcharge + 10% Administrative Fee + 10% Administrative Fee + 10% Administrative Fee + 7% State Surcharge + 8% State Surcharge + 8% State Surcharge Fixture Not Covered Plumbing Plan Review Plumbing (30%) Plan Review Plumbing (30%) Plan Review Plumbing (30%) Refund - Admin Fee Refund - Plumbing Refund - Surcharge Sanitary or Storm Sewer Cap Sanitary Sewer - 1st 50 Feet Sanitary Sewer Each Addtll00' Special Waste Connection Storm Sewer - 1st 50 Feet Storm Sewer Each Addtll00' + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commercial Indus + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commercial Indus + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commercial Indus Plan Review Electrical (25%) + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commercial Indus Plan Review Electrical (25%) + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commercial Indus $900.00 $720.00 $9,000.00 $2,250.00 $-2.10 $-21.00 $-1.68 $11.50 $11.80 $137.20 $96.04 $9.20 $9.44 $1,344.00 $28.00 $34.50 $35.40 $481.57 $-137.20 $-1,853.57 $-96.04 $45.00 $45.00 $28.00 $42.00 $45.00 $28.00 $13.50 $6.75 $10.80 $135,00 $274.50 $137.25 $219.60 $2,745.00 $144.00 $72.00 $115,20 $1,440.00 $360.00 $603.00 $301.50 $482,40 $6,030.00 $1,507.50 $490.50 $245.25 $392.40 $4,905.00 CITY OF SPRINGFIELD' Building/Combination Permit PERMIT NO: COM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/0612004 EXPIRES: 01111/2008 VALUE: $ 212,434,907.00 5/18/06 5/18/06 5/18/06 5/18/06 5/19/06 5/19/06 5/19/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 6/8/06 8/9/06 8/9/06 8/9/06 8/9/06 12/4/06 12/4/06 12/4/06 12/4/06 12/12/06 12/12/06 12/12/06 12/12/06 12/12/06 2/15/07 2/15/07 2/15/07 2/15/07 2/15/07 3/19/07 3/19/07 3/19/07 3/19/07 1200600000000000678 1200600000000000678 1200600000000000678 1200600000000000678 VOUCHER #104418 VOUCHER #104418 VOUCHER #104418 1200600000000000829 1200600000000000829 1200600000000000827 1200600000000000827 1200600000000000829 1200600000000000829 1200600000000000827 1200600000000000827 1200600000000000829 1200600000000000829 1200600000000000827 VOUCHER # 105568 VOUCHER # 105568 VOUCHER # 105568 1200600000000000829 1200600000000000829 1200600000000000829 1200600000000000829 1200600000000000829 1200600000000000829 1200600000000001228 1200600000000001228 1200600000000001228 1200600000000001228 1200600000000001719 1200600000000001719 1200600000000001719 1200600000000001719 2200600000000001684 2200600000000001684 2200600000000001684 2200600000000001684 2200600000000001684 2200700000000000210 2200700000000000210 2200700000000000210 2200700000000000210 2200700000000000210 3200700000000000157 3200700000000000157 3200700000000000157 3200700000000000157 Pal.!:e 4 of 27 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Plan Review Mechanical (25%) + 10% Administrative Fee + 5% Technology Fee + 8% State Surc.harge Plan Review Plumbing (30%) Sanitary Sewer - 1st 50 Feet Sanitary Sewer Each Addtll00' Special Waste Connection Storm Sewer - 1st 50 Feet Storm Sewer Each Addti 100' Sanitary Sewer - Reimbursement SDC MWMC Administration SDC MWMC Improvement SDC MWMC Reimbursement SDC Sanitary/Storm Admin SDC Transpo Admin SDC Transpo Improvement SDC Transpo Reimbursement Storm Drainage Impervious Area + 10% Administrative Fee + 5% Technology Fee + 8% State Surcharge Low Voltage - Commerciai Indus Total Amount Paid Initial Review Public Works Review CITY OF SPRINGFIELD' Building/Combination Permit PERMIT NO: COM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 01/11/2008 VALUE: $ 212,434,907.00 $1,226.25 $67.80 $33.90 $54.24 $203.40 $45.00 $28.00 $224.00 $45.00 $336.00 $172,729,80 $10.00 $768,682.48 $72,795.91 $33,130.87 $87,265.55 $853,215.71 $282,168.90 $258,325.56 $5.00 $2.50 $4.00 $50.00 3/19/07 4/20/07 4/20/07 4/20/07 4/20/07 4/20/07 4/20/07 4/20/07 4/20/07 4/20/07 6/22/07 6/22/07 6/22/07 6/22/07 6/22/07 6/22/07 6/22/07 6/22/07 6/22/07 7/27/07 7/27/07 7/27/07 7/27/07 3200700000000000157 2200700000000000563 2200700000000000563 2200700000000000563 2200700000000000563 2200700000000000563 2200700000000000563 2200700000000000563 2200700000000000563 2200700000000000563 1200700000000000802 1200700000000000802 1200700000000000802 1200700000000000802 1200700000000000802 1200700000000000802 .1200700000000000802 1200700000000000802 1200700000000000802 2200700000000001194 2200700000000001194 2200700000000001194 2200700000000001194 $4,467,345.75 I Plan Reviews I. 03/30/2006 03/30/2006 10 LLH Received permission from Philip Farrington to recycle old plans. Added SDC fees provided by Ken. Processed info into cashier as provided by Les in amount of $2,528,324.77 check #00291969. Fee's are for Hospital 7-01488, Central Utility Plant 5-01358, and OHVI4-01488. ASI 95 - Approved with note to inspector ASI 106R.l - Approved with Conditions Proposal Request #35R.3 and #35R.4 - Approved with Conditions Proposal Request #52 - Approved Proposal Request #63 - Approved Proposal Request #80 - Approved with Note to Inspector 06/21/2007 06/20/2007 10 JLP Structural Review 06/19/2006 06/19/2006 APP AC Structural Review 06/19/2006 06/19/2006 APP AC Structural Review 06/19/2006 06/19/2006 APP AC Structural Review 06/19/2006 06/19/2006 APP AC Structural Review 06/19/2006 06/19/2006 APP AC Structural Review 06/19/2006 06/19/2006 APP AC Pal.!:e 5 of 27 CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/0612004 541-726-3676 Fax EXPIRES: 0111112008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 07/01/2006 07/03/2006 APP AC Deferred Submittal No. 0485-05510-DFO - Stair No.7, 9, 10, and 11 - 1st Back Check - Approved with Notes to Inspector Structural Review 07/01/2006 07/03/2006 APP AC Deferred Submittal No, 0625-03450-DFO - 3rd Floor Precast Bracket Panel Reinforcing Drawings w/ Calculations (APS) - Approved with conditions Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No. 0707-03450-DFO - 3rd Floor West Elevation Sills (between bracket panels) reivsion (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No. 0624-03450-DFO - Connection RDE-l and RDE-3 for panels SPl and SP3 (west elevation) (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/1712006 APP AC Deferred Submittal Package No. 0557-03450-DFO-l - Parapet and Bay Windows - Hospital (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/1712006 APP AC Deferred Submittal Package No. 0675-03450-DFO - Corner Window sills reinforcing, Level 4 Hospital - including shop drawings (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittai Package No. 0676-03450-DFO - Precast Window Sills Reinforcing - OHVI - shop drawings (APS) - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Deferred Submittal Package No. 0632-15000-DFl - Seismic Bracing- Level 2. (Previously submitted plans for this submittal were taken and stamped by KPFF and returned to CLAIR 7/11/06 for the back check t( our first review of this submittal) - Approved with Notes to Inspector Structural Review 07/01/2006 07/17/2006 APP AC Proposal Request #37 - Approved Structural Review 07/01/2006 07/17/2006 APP AC Proposal Request #97 - Approved Structural Review 07/01/2006 07/1712006 APP AC Construction Change Directive #52 - Approved with Conditions Structural Review 07/01/2006 07/1712006 APP AC Construction Change Directive #10 - Approved Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #53 - Approved with Notes to Inspector Pal.!:e 6 of 27 CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/1812006 541-726-3753 Phone APPLIED: 12/0612004 541-726-3676 Fax EXPIRES: 0111112008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structurai Review 07/01/2006 07/1712006 APP AC Construction Change Directive #70 - Approved with Conditions Structural Review 07/01/2006 07/17/2006 APP AC Construction Change Directive #55R2 - Approved. Structural Review 07/01/2006 07/17/2006 APP AC ASI #111 - Approved Structural Review 07/01/2006 07/17/2006 APP AC ASI #61 - Approved Structural Review 07/31/2006 08/01/2006 APP AC ASI #62 approved 7/31/06 Structural Review 07/3i/2006 08/01/2006 APP AC ASI #1l5Rl, 115R3, adn 115R4 - Approved on 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI 120 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI 130 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI 134 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC ASI 133 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC CCD 12 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC CCD 13 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC CCD 71 - Approved with notes to inspector 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC CCD 48 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC CCD 28 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC PR 65 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC PR 34 - Approved 7/31/06 Structural Review 07/31/2006 08/01/2006 APP AC. Deferred Submittal #0704-03450-DFO - 1st Floor Precast Sills (plan and reinforcing) - OHVI . Approved 7/31/06 Structural Review 08/01/2006 08/03/2006 APP AC Deferred Submittal #0777-08810-DFO - West Elevation Window Systems Floors 1-3- Approved with conditions Structural Review 08/01/2006 08/09/2006 APP AC ASI 122 - Approved Structural Review 08/01/2006 08/09/2006 APP AC ASI 91 - Approved with Notes to Inspector Structural Review 08/01/2006 08/09/2006 APP AC ASI 123 - Approved Structural Review 08/01/2006 08/0912006 APP AC CCD 46 - Approved Structural Review 08/01/2006 08/09/2006 APP AC CCD 81 - Approved Structural Review 08/01/2006 08/09/2006 APP AC PR #21 - Approved Structural Review 08/01/2006 08/09/2006 APP AC PR 42 - Approved Structural Review 08/01/2006 08/09/2006 APP AC Deferred Submittal Package No. 0373-15000-DFl - Larsen VR-1818 Fire Hose Valve Cabinet - product data/cut sheets - Approved Structural Review 08/01/2006 08/0912006 APP AC Deferred Submittal Package No. 0553-15000-DFO - Interior Accoustical Caulking for Non Fire-rated Wall Penetrations - Tremco Product Data. (Lane-Douglas) - Approved Pal.!:e 70f27 CITY OF SPRINGFIELD' Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/0612004 541-726-3676 Fax EXPIRES: 01/11/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 08/01/2006 08/09/2006 APP . AC Deferred Submittal Package No. 0558-15000-DFO - Seismic Pipe Bracing - Calculations (JH Kelly). Including Structural Calculations b) Miller Consulting dated 3/21/06 and Supplemental Structural Calculations by Miller Consulting dated 4/26/06 - Approved with Notes to Inspector Structural Review 08/01/2006 08/14/2006 APP AC ASI 116 - Approved Structural Review 08/01/2006 08/14/2006 APP AC ASI 121 - Approved Structural Review 08/01/2006 08/14/2006 APP AC ASI 69R2 - Conditions of Approval Structural Review 08/01/2006 08/14/2006 APP AC ASI 141 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 16 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 3 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 75 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 2 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 78 - Notes to inspector Structural Review 08/01/2006 08/14/2006 APP AC CCD 67 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 15 - Condition of Approval Structural Review 08/01/2006 08/14/2006 APP AC CCD 11 - Notes to Inspector Structural Review 08/01/2006 08/14/2006 APP AC CCD 20 - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 48Rl - Approved Structural Review 08/01/2006 08/14/2006 APP AC CCD 25 - Approved Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal 0899-15000-DFO - Seismic Anchorage and Restraints Hilti Kwik Bolt TZ Wedge Anchor - Product Data/Cut Sheets - Approved with Notes to Inspector Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal - 0843-15000-DFO - OHVI - Seismic Bracing of Suspended Utilities (Twill Rivers) - calculations (ISA T) - Approved with Notes to Inspector Structural Review 08/01/2006 08/14/2006 APP AC Deferred Submittal 0613-15000-DFO - Seismic Bracing - Levell (JH Kelley) - including shop drawings and calculations - Approved with Notes to Inspector Structural Review 08/01/2006 08/21/2006 APP AC ASI #119 - Approved Structural Review 08/01/2006 08/21/2006 APP AC ASI 91R - Approved Structural Review 08/01/2006 08/21/2006 APP AC ASI 142 - Approved Structural Review 08/01/2006 08/21/2006 APP AC CCD 45 - Approved Structural Review 08/01/2006 08/21/2006 APP AC CCD 27 - Approved Structural Review 08/01/2006 08/21/2006 APP AC CCD 24 - Approved Pal.!:e 8 of 27 CITY OF SPRINGFIELD' Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/1812006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01111/2008 541- 726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 08/01/2006 08/21/2006 APP AC Deferred Submittal 0779-15900-DFO - Parking Garage Ventilation Controls Deferred Submittal - including product data/cut sheets and shop drawings (Johnson Controls) - Approved with notes to inspector Structural Review 08/27/2006 08/28/2006 APP AC ASI 123Rl - Approved Structural Review 08/27/2006 08/28/2006 APP AC ASI 139 - Approved Structural Review 08/27/2006 08/28/2006 APP AC ASI 147 - Approved Structural Review 08/27/2006 08/28/2006 APP AC CCD 9Rl - Approved Structural Review 08/27/2006 08/28/2006 APP AC CCD 6 - Approved Structural Review 08/27/2006 08/28/2006 APP AC CCD 8 - Approved Structural Review 09/11/2006 09/11/2006 APP AC ASI 118 - Approved with Notes to Inspector Structural Review 09/11/2006 09111/2006 APP AC ASI 44 - Approved with conditions Structural Review 09111/2006 09/11/2006 APP AC CCD 43 - Approved with conditions Structural Review 09/11/2006 09/11/2006 DEN AC Deferred Submittal 0684-15000-DFO - Seismic Anchorage and Restraint (Superior Air Handling) - Shop Drawings - Not Approved Structural Review 09/11/2006 09/11/2006 APP AC Deferred Submittal 0814-08600-DFO - Skylights - Lobby Atrium and Entry Vestibule - including shop drawings and calculations - Approved with conditions Structural Review 09111/2006 09/11/2006 APP AC Deferred Submittal 0836-03450-DFO - Hospital - Bay coiumn, windows, and sills reinforcing - shop drawings. (APS) - Approved with conditions Structural Review 09110/2006 09/11/2006 APP AC Deferred Submittal 0677-15000-DFO - OHVI - HV AC Seismic Bracing for Suspended Equipment - Product Data Only (FM Sheet Metal) (ISA T) - Approved with conditions Structural Review 09/10/2006 09/11/2006 DEN AC Deferred Submittal 0902-15000-DFO - Hospital - HV AC Ductwork Seismic Bracing - SMACNA/IBC Comparison - Not Approved Structural Review 09/10/2006 09/11/2006 APP AC Deferred Submittal 0845-15000-DFO - Hospital - Seismic Bracing - Level 3 (Less Keyplan Areas C, G, K & Q) (JH Kelly) - including shop drawings and calculations - Approved with conditions Pal.!:e 9 of 27 CITY OF SPRINGFIELD. Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01/11/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 09/10/2006 09/11/2006 DEN AC Deferred Submittal 0379-15000-DFO - HV AC Dry Side - Seismic Product Data - responses and submittals.to CLAIR's 1st plan review of submittal #0379-15000-DFO including (5) sets of original submittal, (5) sets ofISA T Quality Assurance Plan, (5) sets ISA T Technical Bulletin with Oregon Stamp on cover page, and (5) sets of missing sheets of ISA T seismic bracing as indicated in the 1st plan review, - Not Approved Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal 0839-15000-DFO - Fire Department Valve Cabinet. - Approved Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal - 1st Back Ched - 0376-15000-DFO - Seismic Product Data Only - Medical Gas Systems. (Mason Industries) - Approved with conditions Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal - 1st Back Ched - 0538-15000-DFl - Response to 1st plan review of submittal no. 0538-15000-DFO (Seismic Locations and Details on the 1st Floor Key Plan Drawings "Q" and "T" (JH Kelly) - Approved with Notes to Inspector Structural Review 09/01/2006 09/25/2006 APP AC Deferred Submittal - 1st Back Ched - 0581-15000-DFl - Response to 1st plan review of submittal no. 0581-15000-DFO (Seismic Bracing - Parking Level (JH Kelly) - Approved with Notes to Inspector Structural Review 09/01/2006 09/18/2006 APP AC Deferred Submittai 0792-14210-DFO - Final Drawings for Elevators 5-6 and 18-19 - including shop drawings and procedures/qualifications - Approved with Conditions Structural Review 09/01/2006 09/18/2006 APP AC Deferred Submittal 0339-14210-DFO - Electric Elevators 3, 4, 10, 11, 12, Car, Machine Room and Hoistway plans with IBC Calculations - Approved with Conditions Pal.!:e 10 of 27 CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01/11/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 09/0112006 09/18/2006 APP AC Deferred Submittal 0335-14240-DFO - Hosp - Hydraulic Elevators - Cars, Machine Room, Hoistway and Entrance - Drawings with IBC Calculations - Elevators 1,2, 7, 22 & 23 - Approved with Conditions Structural Review 09/0112006 09/18/2006 APP AC Deferred Submittal 0781-14240-DFO - Hosp - Hydraulic Roped Elevators #8 and #9 IBC Hoist, Car and Machine Room - Approved with Conditions Structural Review 09/0112006 09/25/2006 APP AC ASI #63R - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI #73R2 - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI #68 - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI 148Rl - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI 137 - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI 151 - Approved Structural Review 09/0112006 09/25/2006 APP AC ASI 143 - Approved Structural Review 09/0112006 09/25/2006 APP AC CCD 7 - Approved Structural Review 09/0112006 09/25/2006 APP AC CCD 41 - Approved Structural Review 09/0112006 09/25/2006 APP AC CCD 76 - Approved Structural Review 09/0112006 09/25/2006 APP AC CCD 85 - Approved Structural Review 10/0112006 10/0112006 APP AC ASI 145 - Approved Structural Review 10/0112006 10/0112006 APP AC ASI 115Rl - Approved Structural Review 10/0112006 10/0112006 APP AC CCD 21 - Approved Structural Review 10/0112006 10/0112006 APP AC PR 12 - Approved w/ Notes to Inspector Structural Review 10/0112006 10/0112006 APP AC Deferred Submittal - 0382-14240-DFO - Hydraulic Elevators 7, 22, 23 & 32 - Panels, Hoistway and Cab Details - Approved wi Notes to Inspector Structural Review 10/0112006 10/0112006 APP AC Deferred Submittal - 0435-14210-DFO - Cab Interiors Electric Elevators 3,4,5-6, 18-19, 20-21,24-25,26-27 - Approved w/ Notes to Inspector Structural Review 10/0112006 10/0112006 APP AC Deferred Submittal - 0532-14240-DFO - Hydraulic Elevator #1, 2, Entrance, Cab, Controls, Lanterns - Approved w/ Notes to Inspector Structural Review 10/0112006 10/0112006 APP AC Deferred Submittal - 0564-14240-DFO - Elevators 8-9, Cab, Control Panel and Hall Signal Drawings - Approved w/ Notes to Inspector Pal.!:e 11 of 27 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review Structural Review 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 10/01/2006 1 % 1/2006 10/01/2006 10/01/2006 10/02/2006 10/0212006 10/02/2006 10/02/2006 CITY OF SPRINGFIELD. Building/Combination Permit PERMIT NO: COM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 0111112008 VALUE: $ 212,434,907.00 APP AC Deferred Submittal - 0830-16000-DFO - Seismic Bracing of Center Hung Cable Tray (EC) (ISA T) - Approved w/ Conditions Deferred Submittal - 0830-16000-DFO - Seismic Bracing of Center Hung Cable Tray (EC) (ISA T) - Approved w/ Conditions Deferred Submittal - 0833-16000-DFO - Single Anchorage of Electrical Seismic Bracing (EC) (ISA T) - Approved w/ Conditions Deferred Submittal - 0891-15000-DFO - Seismic Calculations for Pipe Shaft Riser Supports (Mason) - Approved with Conditions Deferred Submittal - 0373-15000-DF2 - Parking Level Fire Sprinkler Seismic Bracing - Calculations (Western States/WDY) - Approved w/ Conditions Deferred Submittal - 0384-14210-DFO - Electric Elevator Car, Hall and Panel Drawings - including Elevator #3, 4,10,11, 12, 14,15,18,19,20,21,24,25,26,27- Approved w/ Notes to Inspector Deferred Submittal - 0386-14210-DFO - Electric Elevator Power Requirements - Elevators 3, 4,5,6, 10-12, 14-14, 18-19,20-21, 24-25, and 26-27. (Traction Elevator Power Form) - Approved Deferred Submittal - 0459-15000-DFl - Fire Protection Hospital and OHVI Standpipe Submittal (WSFP) - including Shop Drawings (Sheets FP-OO, 0.0, 0.1, FP _1-SPN, FP _1-SPS, FP _ISO-SP, FP _ROOF-SP, FP _SUPPLY) Hydraulic Calculations (Class #3, CSP #1, #2, #3, and #4), Standpipe Seismic Bracing Calculations, and responses to CLAIR's 1st plan review - Approved w/ Conditions APP AC APP AC APP AC APP AC APP AC APP AC APP AC Pal.!:e 12 of 27 CITY OF SPRINGl'lELD . Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01/11/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 10/01/2006 10/0212006 APP AC Deferred Submittal - 0655-15000-DFl - Fire Protection - Hospital Levell - including Seismic Bracing - Shop drawings, Hydraulic Calculations, Structural Calculations for Seismic Bracing (WSFP) - Approved w/ Conditions Structural Review 10/01/2006 10/03/2006 APP AC Deferred Submittal- 853-08810-DFO - Window Systems Shop Drawings and Calculations (Eugene Mirror and Glass) - Shop drawings and calculations - Approved w/ Conditions Structural Review 10/01/2006 10/0912006 APP AC ASI 71 - Approved w/ Notes to Inspector Structural Review 10/01/2006 10/0912006 APP AC ASI 144 - Approved Structural Review 10/01/2006 10/0912006 APP AC ASI 149 - Approved Structural Review 10/01/2006 10/09/2006 APP AC CCD 91 - Approved Structural Review 10/01/2006 10/09/2006 APP AC CCD 32 - Approved w/ Conditions Structural Review 10/01/2006 10/09/2006 APP AC CCD 74Rl - Approved Structural Review 10/01/2006 10/0912006 APP AC PR 93 and 93Al - Approved Structural Review 10/01/2006 10/02/2006 APP AC CCD 31Rl - Approved Structural Review 10/01/2006 10/02/2006 APP AC CCD 35 - Approved Structural Review 10/01/2006 10/0212006 APP AC CCD 36 - Approved Structural Review 10/01/2006 10/02/2006 APP AC CCD 77 - Approved Structural Review 10/01/2006 10/02/2006 APP AC CCD 4 - Approved Structural Review 10/01/2006 10/0212006 APP AC CCD 79 - Approved Structural Review 10/01/2006 10/02/2006 APP AC CCD 14 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI 162 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI 125 - Approved Structural Review 10/01/2006 10/1612006 APP AC ASI 160 - Approved Structural Review 10/01/2006 10/1612006 APP AC ASI 163 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI 146 - Approved Structural Review 10/01/2006 10/16/2006 APP AC ASI 166 - Approved Structural Review 10/01/2006 10/16/2006 APP AC CCD 60 - Approved w/ Notes to Inspector Structural Review 1 % 1/2006 10/1612006 APP AC CCD 47 - Approved Structural Review 10/01/2006 10/1612006 APP AC CCD 50 - Approved Structural Review 10/01/2006 10/16/2006 APP AC CCD 96 - Approved w/ Notes to Inspector Structural Review 10/01/2006 10/1612006 APP AC CCD 8Rl - Approved Structural Review 10/01/2006 10/1612006 APP AC Proposal Request 94 - Approved Structural Review 10/01/2006 10/16/2006 APP AC Deferred Submittal 0872-15000-DFO - OHVI 1st floor HV AC Seismic Layout - Shop drawings (FM Sheet Metal) - Approved w/ Conditions Pal.!:e 13 of 27 CITY OF SPRINGFIELD. Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01/11/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 10/0112006 10/16/2006 APP AC Deferred Submittal 0811-03450-DFO - Level 2 Parapets (north elevation at stair #1) - Hospital- Layout and reinforcing drawings (APS) - Approved w/ Notes to Inspector Structural Review 10/0112006 10/1612006 APP AC Deferred Submittal 0908-15730-DFO - Seismic Structural Analysis Report for Fabricated Custom Air Handlin~ Units by 9/5/06 Turner Logistics - Approved w/ Conditions Structural Review 10/0112006 10/23/2006 APP AC Proposal Request 26 - Approved w/ Notes to Inspector Structural Review 10/0112006 10/16/2006 APP AC Deferred Submittal - 1st Back Ched - 0399-16000-DFl - Resubmittal for Seismic Restraint of Suspended Electrical Conduit and Cable Tray - including responses to CLAIR's first plan review with copies of ISA T Technical Bulletin, ISA T QA Plan, EC QA Pian, and letter of Responsibility from EC - Approved w/ Notes to Inspector Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0513-16000-DFl - Resubmittal for Seismic Restraint of Fixed Electrical Equipment - including responses to CLAIR's first plan review with copies of ISA T Technicai Bulletin, ISA T QA Plan, EC QA Plan, and letter of Responsibility from EC - Approved w/ Conditions Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal - 0666-15000-DFl - Fire Protection Systems - Level 2 (WSFP) - including shop drawings, Hydraulic Calculations (RA 1, 2, 3, 4; CSP 1,2, 3, 4). Also includes cover sheet to seismic calculations, however, see submittal 655 for actual calculations - Approved w/ Conditions Pal.!:e 14 of 27 CITY OF SPRINGFIELD' Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01111/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal - 0756-15000-DFO - Fire Protection Level 3 (WSFP) - including Shop Drawings (sheets FP-OO, 0,0, 0.14, SPRINK, 03-A, 03-B, 03-C, 03-D, 03-E, 03-F, 03-G, 03-H, 03-J, 03-K, 03-N, 0-3-P, 03-Q, 03-R, 03-S, 03- T) hydraulic calculations including Standpipe Supply CSP 1, 2, 3, 4 and Level 3RA 1,2,3,4 and Fire Protection Seismic Bracing Levels 3-9 - Approved w/ Conditions Structural Review 10/01/2006 10/23/2006 APP AC Deferred Submittal 0777-0881O-DFO - received electronic copy of responses to 1st plan review - Approved w/ Notes to Inspector Structural Review 10/01/2006 10/23/2006 APP AC Deferred Submittal 0812-03450-DFO - Level 4 Parapet - Hospital - Layoul and reinforcing drawings (APS) - Approved w/ Notes to Inspector Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0813-03450-1 - Level 5 Parapet - Hospital (APS). (see submittal#955 for calcs) - Approved w/ Conditions Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0836-03450-DFO - Received structural calculations (submittal no. 0643-03450-0) in reference to our plan review comment #168 for above referenced submittal (Hospital - Bay column, windows, and sills reinforcing - shop drawings - Approved w/ Notes to Inspector Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0877-03450-DFO - OHVI Project Bay Panels - Sheet OB5 missing from original submittal (APS) - Approved Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0955-03450-DFO - Hospital/OHVI Parapet Panel Calculations, Bay Window Connection Calculations (APS/Bright) - Approved w/ Conditions Structural Review 10/0112006 10/23/2006 APP AC Deferred Submittal 0969-03450-DFl - Hosp - DE18 and DE18A Precast Connections - Top of Bay Windows (APS) - Approved w/ Notes to Inspector Pal.!:e 15 of 27 CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01/11/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 10/01/2006 10/23/2006 APP AC Deferred Submittal 0987-15000-DFO - Seismic Bracing (JHK) - Level 3 (Key Plan Areas C, G, K, Q and T) - Approved w/ Conditions Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 0989-15000-DFO - Seismic Bracing- Level 4 (Complete) (JHK) - Shop drawings - Approved with Notes to Inspector Structural Review 12/01/2006 12/01/2006 APP AC Submittal Package No. 1040-03450-DFO - Hospital Precast- Soffit panels and connections (DE-24) - details/calcs (APS/Bright) - Approved with Conditions Structural Review 12/01/2006 12/01/2006 APP AC Submittal Package No. 0918-15000-DFO - OHVI - Seismic for Ductwork - Shop drawings (FM Sheet Metal) - Approved with Notes to Inspector Structural Review 12/01/2006 12/0112006 APP AC 11/20/06 - Submittal Package No. 0884-03450-DFO - Revised DE-16 Connection (Bracket Panels - 3rd floor, west elev., bottom connection) (APS/Bright) - Approved with Conditions Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 1062-14580-DFO - Pneumatic Tube Systems Seismic Restraint Level 3 - shop drawings (SwissLog) - Approved with Notes to Inspector Structural Review 12/01/2006 12/0112006 APP AC 11/20/06 - Submittal Package No. 0853-08810-DFOl - Hospital- Window Systems - Splice Joint details for QI-Q9 Curtain Walls - Shop Drawings - Approved with Notes to Inspector Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 1072-15000-DFl - Hosp. - Structural Calcs for Shaft Support (Superior / AZH) - Approved with Notes to Inspector Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 0845-15000-DFO - Responses to 1st plan review for Hospital - Seismic Bracing - Level 3 (Less Keyplan Areas C, G, K & Q) (JH Kelly) - Approved with Notes to Inspector Pal.!:e 16 of27 CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01111/2008 541-726~3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 0376-15000-DFl - response to CLAIR's 1st back check for submittal Seismic Product Data Only - Medical Gas Systems (Twin Rivers) - Approved with Conditions Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No. 0792-14210-DFO - response to CLAIR's 1st plan review for submittal Final Drawings for Elevators 5-6 and 18-19 - including responses, copy of ASI #134, emaiJ from TKE, and letter from Lerch, Bates & Associates - Approved with Notes to Inspector Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - Submittal Package No, 0853-08810-DFl - Response to CLAIR's 1st plan review of submittal Window Systems Shop Drawings w/ Calculations (Eugene Mirror and Glass) - Approved with Notes to Inspector Structural Review 12/01/2006 12/01/2006 APP AC 11/27/06 - Submittal Package No. 0987-15000-DFl - 1st Back check fOI Seismic Bracing (JHK) - Level 3 (key plan areas C, G, K, Q & T) - Notes to Inspector StructuraJ Review 12/04/2006 12/04/2006 APP AC Submittal Package No. 0379-15000-DFl - Seismic Producat Data Only - HV AC Dry Side - response to CLAIR's 2nd review including responses, review/approval transmittals from A+A, KPFF, and AEI, ISAT Tech. Bulletin, cover page w/ Oregon stamp, QA Plan, and product data - Approved with Notes Structural Review 12/04/2006 12/04/2006 APP AC Submittal Package No, 0684-15000-DFl - Seismic Anchorage and Restraint - Superior Air - response to CLAIR's 1st review including responses, review/approval transmittals from A+A, KPFF and AEI, ISA T Tech, Bulletin, cover page w/ Oregon stamp, QA Plan, and product data - Approved with Notes Pal.!:e 17 of27 CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01111/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 12/04/2006 12/04/2006 APP AC Submittal Package No. 0795-15000-DFO - Hospital Fire Protection - Level 4 (WSFP) - including shop drawings, seismic bracing calculations (levels 3-9 dated 8/16/06) , hydraulic CSP calculatiom 1, 2, 4, and hydraulic calculations Level 4 RA #1, 2, 3 - Approved with Conditions Structural Review 12/04/2006 12/04/2006 APP AC Submittal Package No. 0902-15000-DF02 - responses to 1st plan review for Hosp - HV AC Ductwork Seismic Bracing - SMACNA - IBC Comparison. Including responses, review transmittals from KPFF, A+A, and AEI, letter w/ stamp from Miller Engineers dated 9/11/06, and stamped copy of the SMACNA comparison - Approved with Conditions Structural Review 12/04/2006 12/04/2006 APP AC Submittal Package No. 1011-15400-DFO - OHVI - Seismic Plumbing Coordination - Shop drawings including 1st floor/2nd floor slab, 2nd floor/3rd floor slab, 3rd floor/4th floor slab (Twin Rivers) - Approved with Conditions Structural Review 12/04/2006 12/04/2006 APP AC Submittal Package No. 1092-15510-DFO - Cryovent Seismic and Thermal Expansion Joints - Shop drawings and calculations (JHKelly/Mason) - Approved with Notes Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 179 - Approved with notes Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 181 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 170 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 157 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 158 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 124revised - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 187 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 175Rl - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - ASI 171 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - CCD 104 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - CCD 040 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - CCD 099 - Approved with notes Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - CCD 103 - Approved Pal.!:e 18 of 27 CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01/11/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - CCD 141 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/20/06 - CCD 143 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/27/06 - ASI 161 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/27/06 - ASI 184 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/27/06 - ASI 190 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/27/06 - CCD 101 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/27/06 - CCD 088R2 - Approved with notes Structural Review 12/01/2006 12/01/2006 APP AC 11/27/06 - CCD 111 - Approved Structural Review 12/01/2006 12/01/2006 APP AC 11/27/06 - PR 25R2 - Approved with notes Structural Review 12/01/2006 12/11/2006 APP AC ASI 123R2 - Approved with Notes to Inspector Structural Review 12/01/2006 12/11/2006 APP AC ASI 126Rl - Approved with Notes to inspector Structural Review 12/01/2006 12/11/2006 APP AC ASI 180 - Approved with conditions Structural Review 12/01/2006 12/11/2006 APP AC ASI 174R2 - Approved with conditions Structural Review 12/01/2006 12/11/2006 APP AC ASI 187Rl - Approved Structural Review 12/01/2006 12/11/2006 APP AC CCD 127 - Approved wtih Notes to Inspector Structural Review 12/01/2006 12/11/2006 APP AC CCD 132 - Approved with Notes to inspector Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No, 0373-15000-DF3 - Fire Protection - Victaulic V38 Concealed OR Sprinkler -product data/cut sheets - Approved with Conditions Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No. 0373-15000-DF4 - Fire Protection - TYCO Model PRV-l Pressure Reducing Vaive - product data - Approved with Conditions Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No. 0565-09510-DFOOl - Accoustical Ceilings and Grid Systems - including product data/cut sheets and structural calculations and letter from Armour Undsderfer Eng dated 10/12/06. - Approved with Conditions Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No. 1042-15300-DFO - Fire Supression System FM-200 - Hospital MDF Room (RFI) - including shop drawings, structural and seismic calculations, and product data/cut sheets - Approved with Conditions Pal.!:e 19 of 27 CITY OF SPRINGFIELD' Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 0111112008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No. 0505-15000-DFl - Responses to CLAIR's review of Hospital - Seismic for Vacuum Equipment- including responses, Mason certificate of compliance, QA Plan, and details/calculations - Approved with Conditions Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No. 1073-16000-DFO - Seismic Restraint of Suspended Electrical Conduit and Cable Tray (Levels 3 and 4) (EC) - Shop drawings - Approved with Conditions Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No. 0509-07810-DF03 - Sprayed On Fireproofing Thickness Schedule / Shop Drawings for the Stair Towers (PCS) - including product data (Tremco 300) and shop drawings - Approved with Conditions Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No. 0814-08600-DFO - Responses to CLAIR's 1st review of Skylights - Lobby Atrium and Entry Vestibule- including responses, letter dated 10/27/06 from Evergreen House, letter dated 10/5/06 from ENW, and 1 sketch - Approved with Conditions Structural Review 12/01/2006 12/11/2006 APP AC Deferred Submittal Package No. 1083-15000-DFO - OHVI - Riser Supports for Insulated Piping (Twin Rivers) - Product data/cut sheets - Aproved with Notes to Inspector Structural Review 12/01/2006 12/18/2006 APP AC Deferred Submittal Package No. 1064-16000-DFO - Seismic Restraint of Suspended Electrical Conduit and Cable Tray (Levels Parking, 1, and 2) (EC) - Shop drawings - Approved with COnditions of Approval Structural Review 12/01/2006 12/11/2006 APP AC ASI 141RI - Approved with Notes to Inspector Structural Review 12/01/2006 12/18/2006 APP AC ASI 188 - Approved with Notes to Inspector Structural Review 01/01/2007 01/08/2007 APP AC ASI 187R2 - Approved Structural Review 01/01/2007 01/0812007 APP AC ASI 131 - Approved with Conditions Structural Review 01/01/2007 01/08/2007 APP AC CCD 192 - Approved Structural Review 01/01/2007 01/08/2007 APP AC CCD 183R2 - Approved Structural Review 01/01/2007 01/0812007 APP AC PR 102 - Approved with Conditions Pal.!:e 20 of 27 CITY OF SPRINGFIELD Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/0612004 541-726-3676 Fax EXPIRES: 01/1112008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No. 0339-14210-DFO - Response to submittal Electric Elevators 3, 4, 10, 11, 12, Car, Machine Room and Hoistway plans with IBC Calculations - including comments from 1st plan review, revised shop drawings, shop drawings for elevators 24, 25, 26, and 27, and copies of CCD 50 and CCD 53. Approved with Conditions Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No. 0373-15000-DF5 - (response to CLAIR's review of 0373-15000-DF2) Parking Level Fire Sprinkler Seismic Bracing - including comments, transmittals sheet from WSFP addressing KPFF comments, and calculations dated 10/27/06, Approved with Notes to Inspector Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No. 0655-15000-DF2 - Responses to Fire Protection Systems Seismic Bracing - Levell (WSFP), Including responses to CLAIR's 1st review, responses to KPFF comments, and calculations. Approved with Conditions Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No. 0459-15000-DF2 - 2nd response to Fire Protection Hospital and OHVI Standpipe Submittal (WSFP) - including responses to 1st back check, response to KPFF's comments dated 8/19/06, standpipe seismic calculations, and product data. Approved with Conditions Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No. 0833-16000-DFO - Response to 1st review of Single Anchorage of Electrical Seismic Bracing (EC) (ISA T) - including responses. Approved with Notes to Inspector Pal.!:e 21 of27 CITY OF SPRINGFIELD' Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/0612004 541-726-3676 Fax EXPIRES: 01111/2008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 01/01/2007 01/0812007 APP AC Submittal Package No. 0677-15000-DFO/DFl - Response to 1st review of OHVI - HV AC Seismic Bracing for Suspended Equipment - Product Data Only (FM Sheet Metal) (ISA T) - including responses, memorandums/review comments from KPFF, AEI. Approved with Conditions Structural Review 01/01/2007 01/08/2007 APP AC Submittal Package No. 1037-15000-DFl - Hospital- Fabrication Support Shoe (JH Kelly / EISI) - including calculations, and product data/cut sheets. (review/approval transmittals from KPFF, AEI and A+A) Approved with Notes to Inspector Structural Review 01/01/2007 01/15/2007 APP AC CCD 94Rl - Approved with Conditions Structural Review 01/01/2007 01/15/2007 APP AC CCD 105 - Approved Structural Review 01/01/2007 01/1512007 APP AC CCD 121 - Approved Structural Review 01/01/2007 01/15/2007 APP AC CCD 190 - Approved Structural Review 01/01/2007 01/15/2007 APP AC CCD 193 - Approved Structural Review 01/01/2007 01/15/2007 APP AC CCD 13Rl - Approved Structural Review 01/01/2007 01/15/2007 APP AC CCD 184 - Approved Structural Review 01/01/2007 01/1512007 APP AC Submittal Package No. 1120-15000-DFO - Fire Protection Systems - Level 5 (WSFP) - including Hydraulic calcs (Standpipe Supply CSP 1,3,4, and RA #1,2, 3), cover sheet for seismic cales for levels 1, 2 and 5-9) and shop drawings. Approved with Conditions Structural Review 01/01/2007 01/15/2007 APP AC Submittal Package No. 0756-15000-DFO/DFl - Response to Fire Protection Level 3 (WSFP) - including responses, revised calculations, and product data. Approved with Conditions Structural Review 01/01/2007 01/15/2007 APP AC Submittal Package No. 0884-03450-DFO - Response to submittal Revised DE-16 Connection (Bracket Panels - 3rd floor, west elev., bottom connection) (APS/Bright) - including responses, sketch. Approved with Notes to Inspector Pal.!:e 22 of 27 CITY OF SPRINGFIELD' Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 0111112008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 0110112007 01115/2007 APP AC Submittal Package No. 0666-15000-DF1(DF1) - Response to 1st review of Fire Protection Systems - Level 2 (WSFP) - including responses, cover sheet of cales, memorandum/comments from A+A, KPFF, and AEI. Approved with Conditions Structural Review 0110112007 0111512007 APP AC Submittal Package No. 0795-15000-DFO(DF1) - Response to 1st review of Hospital Fire Protection - Level 4 (WSFP) - Including responses, copy of cover 01 calcs, and memorandum/comments from A+A, KPFF, and AEI. Approved with Conditions Structural Review 0110112007 01115/2007 APP AC Submittal Package No. 1011-15400-DFO(DF1) - Responses to 1st review of OHVI - Seismic Plumbing Coordination Shop drawings (Twin Rivers) - Including responses, ISA T Manual. Approved with Notes to Inspector Structural Review 0110112007 01115/2007 APP AC Submittal Package No. 0373-15000-DF6 - Fire Protection Data and Garage Level Drawings and Calculations - Product data onl) Aurora Fire Pumps. Approved with Conditions Structural Review 0110112007 01115/2007 APP AC Submittal Package No. 0781-14240-DFl - Response to submittal Hosp - Hydraulic Roped Elevators #8 and #9 IBC Hoist, Car and Machine Room - including final shop drawings incorporating clarifications based on 1st review/KPFF comments, and RFI 2046 w/ sketches addressing hoist beam requirements. Approved with Notest to Inspector Structural Review 02/08/2007 02/08/2007 APP AC Submittal Package No. 1117-16740-DFO - Seismic Support of Telecom Racks (AZH) - Approved with Conditions Structural Review 02/0812007 02108/2007 APP AC Submittal Package No. 1103-15000-DFO - Seismic Bracing- Level 6, all areas (JHK) - including shop drawings, seismic calculations, and product data - Approved with Conditions Pal.!:e 23 of 27 CITY OF SPRINGFIELD' Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01/1112008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 02/08/2007 02/08/2007 APP AC Submittal Package No. 1123-15000-DFO - Fire Protection Systems - Level 6 (WSFP) - including shop drawings, calculations cover sheet, supply calcs level 6 zones 1, 2, 3, and standpipe supply calcs level 6, CPS 1,3,4 - Approved with Conditons Structural Review 02/08/2007 02/08/2007 APP AC Submittal Package No. 1130-15000-DFO - Fire Protection Systems - Level 8 (WSFP) - including shop drawings, hydraulic calcs (standpipe supply CSP 1,3,3 and level 8 RA #1, 2,3), and cover sheet to seismic calculations - Approved with notes to inspector Structural Review 02/08/2007 02/0812007 APP AC Submittal Package No. 1081-15000-DFO - OHVI MDF Room - Fire Supression System FM-200 (RFI) - including product data/cut sheets and shop drawings. (piping over 1" and supply tank seismic will be submitted seperately) - Approved with Conditions Structural Review 02/08/2007 02/08/2007 APP AC Submittal Package No. 0509-07810-DF2 - Response to submittal Sprayed On Fireproofing Thickness Schedule/Shop Drawings. including responses only (PCS) - Approved with Conditions Structural Review 02/08/2007 02/08/2007 APP AC Submittai Package No. 1102-16000-DFO - Seismic Restraint of Level 4 Suspended Electrical Systems - including shop drawings (EC). (anchorage detail Dl.lTZ to be forwarded seperately) - Approved with Conditions Structural Review 02/08/2007 02/08/2007 APP AC Submittal Package No. 1098-16000-DFO - OHVI - Seismic Restraint of Level 2 Suspended Electrical Conduit and Cable Tray - including shop drawings (EC). (Anchorage Detail Dl.l TZ to be submitted seperately) - Approved with Conditions Structural Review 02/08/2007 02/08/2007 APP AC CCD 224 - Alpproved with Conditions Structural Review 02/08/2007 02/08/2007 APP AC CCD 154 - Approved Structural Review 02/0812007 02/08/2007 APP AC CCD 161 - Approved Pal.!:e 24 of 27 CITY OF SPRINGFIELD - Building/Combination Permit Status Issued PERMIT NO: COM2004-01488 225 Fifth Street, Springfield, OR ISSUED: 05/18/2006 541-726-3753 Phone APPLIED: 12/06/2004 541-726-3676 Fax EXPIRES: 01/1112008 541-726-3769 Inspection Line VALUE: $ 212,434,907.00 Structural Review 02/08/2007 02/08/2007 APP AC CCD 56 - Approed with notes to inspector Structural Review 02/08/2007 02/08/2007 APP AC CCD 152 - Approved with notes to inspector Structural Review 02/0812007 02/08/2007 APP AC CCD 203 - Approved Structural Review 02/08/2007 02/08/2007 APP AC CCD 216 - Approved with conditions Structural Review 02/08/2007 02/08/2007 APP AC CCD 182 - Approved with Notes to inspector Structural Review 06/02/2005 06/03/2005 10 LLH Forwarded revised structural fill drawings to Clair Structural Review 06/03/2005 06/08/2005 APP AC Approved for Structural fill Only Structural Review 06/30/2005 06/30/2005 APP AC Approved for foundation, shell and core only, See attached documents for plan review comments and or conditions Structural Review 06/12/2006 06/12/2006 APP AC ASI 87 plan review - approved 6/12/06 Structural Review 06/1212006 06/12/2006 APP AC ASI 100 plan review - approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC ASI 60R.4 plan review - approved. Structural Review 06/12/2006 06/12/2006 APP AC ASI 97 plan review - approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC ASI 109 plan review - approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC ASI 099R.l plan review - approved 6/12/06 Structural Review 06/11/2006 06/12/2006 APP AC ASI 104 plan review - approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC Proposal Request #24 plan review - approved 6/12/06 Structural Review 06/1212006 06/12/2006 APP AC Proposal Request #22 plan review - approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC Proposal Request #32 plan review - approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC Proposal Request #67 plan review approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC Proposal Request #90 plan review approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC Proposal Request #36 plan review approved 6/12/06 Structural Review 06/12/2006 06/12/2006 APP AC Proposal Request #77 plan review approved 6/12/06 Structural Review 06/12/2006 06/1212006 APP AC Deferred Submittal #0623-15900-DFO - Levell and 2 Reheat Control Valves - plan review - approved 6/12/06 Pal.!:e 25 of 27 CITY OF SPRINGFIELD - Building/Combination Permit PERMIT NO: COM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 01/11/2008 VALUE: $ 212,434,907.00 Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Structural Review 06/12/2006 06/12/2006 APP AC Structural Review 06/12/2006 06/12/2006 APP AC Structural Review 06/19/2006 06/19/2006 WE AC Structural Review 06/1912006 06/19/2006 APP AC Structural Review 06/19/2006 06/19/2006 DEN AC Structural Review 06/19/2006 06/19/2006 APP AC Deferred Submittal 0536-15000-DFO - Tremco Firestopping (Lane-Douglas) - plan review - approved 6/12/06 Deferred Submittal 0645-03450-DFO - Connection Detail DE-ll - plan review - approved with notes to inspector 6/12/06 Deferred Submittal 0581-15000-DFO - Seismic Bracing - Parking Level (JH Kelly) - 1st plan review - Conditions of Approval Deferred Submittal 0598-15000-DFO - Seismic Bracing Parking Level Rev. #2 (JH Kelly) - 1st plan review - conditions of approval Deferred Submittal 0632-15000-DFO - Seismic Bracing Level 2 (JH Kelly) - 1st plan review - NOT APPROVED ASI 108 - Approved To Request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. ~eouireCUnSDections . Water Line: Prior to filling trench and including required testing. Storm Sewer Line: Prior to filling trench. Backflow Device: Prior to covering and provide a copy of the test report on site at the time of inspection. Special: See Plan Review and/or Inspector Notes. Footing: After trenches are excavated. Foundation: After forms are erected but prior to concrete placement. Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in place but prior to concrete. Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to City Building Inspector. Structural Concrete: In excess of 2500 psi. To be done during construction by a State Certified Inspector. Provide results to City Buiding Inspector High Strength Bolting: To be done during construction by a State Certified Special Inspector. Provide inspection results to City Building Inspector. Special Inspection: Weld Inspection: To be done during construction by a State Certified Special Inspector with approval from the City of Springfield. Copies of inspection results shall be provided to the City of Springfield. Pal!:e 26 of 27 CITY OF SPRINGFIELD - Status Iss u ed Building/Combination Permit PERMIT NO: COM2004-01488 ISSUED: 05/18/2006 APPLIED: 12/06/2004 EXPIRES: 01/11/2008 VALUE: $ 212,434,907.00 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Special Inspection: Reinforcing Steel Mill Certificate Inspection: To be done during construction by a State Certified Special Inspector with approval from the City of Springfield. Copies of inspection results shall be provided to the City of Springfield. Special Inspection: Masonry, Mortar, Grout, and Reinforcing Steel Certificates Inspection: To be done during construction by a State Certified Special Inspector with approval from the City of Springfield. Copies of inspection results shall be provided to the City of Springfield. Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test results to City Building Inspector. Epoxy Anchors: To be done by Certified Spcial Inspector. Provide Inspection results to City Building Inspector. Low Voltage: Prior to cover. Low Voltage: Prior to cover. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Owner or Contractors Signature Date Pal!:e 27 of 27 ,City of Springfield Electrical Authorization To Begin Work E-mailedTo:RMARTIN@RFI.COM Receipt # EC514594 7/26/20072:29:29 PM Check on status of permit By Phone: (541)726-3753 or Email: permitcenter@ci.springfield.or.us TYPE OF WORK [X] New construction D Addition/alteration/replacement . CATEGORY OF. CO.NSTRUCTION D 1 or 2 family dwelling D Multi-family [X] Commercial/Industrial JOB SITE INFORMATION AND LOCATION Job no.: 305970054 1 Job address: 3333 GAME FARM RD 1 City/State/ZIP: SPRINGFIELD, OR 97477-7521 Suite/bldg./apt.no.: Project name: PeaceHealth Security Cross street/directions to job site: Subdivision: !Lot no.: Tax map/parcel no.: 1703220001000 DESCRIPTION OF WORK Install security system SITE CONTACT Name: Jon Thompson I Phone: (503) 682-9900 Ext: 3038 Email: rmartin@rfi.com 1 Fax: (503) 682-9500 CONTRA91"0R. I EI. lie. no.: 34-174CLE I CCB lie. no.: 67147 1 Business Name: RFI ENTERPRISES INC OREGON I Contact: Jon Thompson !Address: 6195 SW \12TH AVE I City/State/ZIP: BEA VERTON OR 97008 I Phone: (503)6266387 1 Fax: None I Email: RMARTlN@RFLCOM I Metro lie. no.: 4551 1 City lie. no.: I Supervising electrician's lie. no.: I Supervising ~I~trician'~ name: 8TH DAY AUDIO ~_ VIDEO INC Upon review and approval by your local jurisdiction, your permit will be e-mailed or faxed within one business day, with instructions on how to schedule your inspection. NOTE: This Authorization To Begin Work expires within 180 days if a permit is not obtained. The local building department may determine that an Authorization To Begin Work is null and void if it does not meet applicable land use laws and local ordinances. II I Description R at 1,000 sq. ft. or less Ea. addl 500 sq. ft. or portion I. - Limited energy, residential (with above Sq. ft) I-Limited energy, multifamily residential (with above sq. ft.) . 1~~_~ic~s'~R feeders. il!sta"lltiol!,alteratiorj,,;AND/~R.~elocation 1200 amps or less I 20 I amps to 400 amps 40 I amps to 599 amps T ~ ' "; I /- '1'" Ea. Total I 200 amps or less 1201 amps to 400 amps 1401 amps to 599 amps I' Branch circ~~ts, - NEW, alteration, OR extension, per panel A Fee for branch circuits with above service or feeder fee, each branch circuit B. Fee for branch circuits without service or feeder fee, first branch circuit: I each addl branch circuit I Miscel~lIeous,,;; .. . I Service reconnect only I Each manufactured or modular dwell ing, service and/or feeder I Pump or irrigation circle V I I Sign or outline lighting ~ ~}. I Signal circuit(s) or Iimited- \! J \5 1 energy panel, alteration, or extension. I I I I I · City Of Springfield rO~qJ6V . .I.~ Subtotal $55~~U State Surcharge (8% of permit fee) $4.40 I s1) City Of Springfield fees · $8.25 J.. , TOTAL PERMIT FEE $67ftS" 1 ,.." I 0% Local Admin Fee: 5% Local Technology I;:ee \V' $55.00 . .' ELECTRICAL PERMIT FEES J This Authorization To Begin Work must be posted at the job site until replaced by a Permit. 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone Job/Journal Number COM2004-01488 COM2004-01488 COM2004-01488 COM2004-01488 Payments: Type of Payment ONLINE CHGS cReceintl RECEIPT #: 2200700000000001194 Description Low Voltage - Commercial Indus + 5% Technology Fee + 8% State Surcharge + 10% Administrative Fee City of Springfield Official Receipt Development Services Department Public Works Department Date: 07/27/2007 Item Total: Check Number Authorization Received By Batch Number Number How Received Paid By ONLINE PERMIT CHGS ddk Page 1 of 1 ONLINE RFI Online Enterprises Payment Total: 9:17:42AM Amount Due 50.00 2.50 4.00 5.00 $61.50 Amount Paid $61.50 $61.50 7/27/2007