Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2011-3-2 1@1 Branch Engineering, Inc. Branch Engineering, Inc Report # 09-077-03 Head~uaners 310 51 Street Springfield, OR 97477 (541) 746 0637 www.branchenginccnng.com Salem/Keizer Office 4310 ChefT)' Avenue, NE Salem, OR 97303 (503) 779 2577 DAILY REPORT OF STRUCTURAL STEEL AND HIGH STRENGTH BOLT SPECIAL INSPECTION Project East Side Baptist Church Address & Jurisdiction 4045 Commercial, Springfield, OR Inspcctor Rick Hernandez Permit # 811-SPR201O-409 Date 3-02-11 Inspection Type(s) I Coverage high strength bolts o Continuous llYPeriodic; frequency once Inspections made, including locations Tests performed Items requiring I) correction, 2) correction of previously listed items, and 3) previously listed uncorrected items Comments Spoke by telephone with metal building engineer (Ronald Bennett) regarding gaps between plates at some bolt locations previously inspected. Although during our inspection all bolts appeared to be installed to snug tight condition based on the full effort of the erector, the engineer stated that the gaps should be shimmed and provided a dctail for such shimming (drawing SD821, no author, date, or seal). Alternately, the plates must be drawn together by increased tightening effort. At that point (the snug-tight condition with plates in firm contact at bolt locations), the additional turn-of-the-nut pre-tensioning shall occur. To the best of my knowledge, work inspected above was in accordance with the building department approved plans, specifications, and applicable workm nship provisions of the controlling building code. Inspector Signat lD/Certificate Number ,a-<t (J:JfJ'134z... Copies to City of Springfield Cascade View Construction / Matt Knights East Side Baptist Church I Len Arney . ":J'