Loading...
HomeMy WebLinkAboutComments ENG 10/18/2010 _, _,~J - - '..~ KEATING ENGINEERING L L C 159 E. SIXTEE~JH_...VE EUGJ~f, OREG.oN 2.7.101 YOIc;E (541)X42-0613 FAX__(541) ?42-0614 EMAIL: keennQeng@msn.com . . 18 October 2010 Liz Miller City of Springfield 22S S'h Street Springfield, Oregon 97477 ocl' 18 l010 RECEIVED Case Number: Project Name: Project Location: Map and Tax Lot: OCT 1 SLUlO DRC201O-00021 Frank Lot Improvements 1415 Mississippi Ave., Eugene, OR 1703344309300 By: Condition 1: A Public Works lock must be obtoined ot Heymon's Safe, Lack, and Security for the manual swinging gate fronting Mississippi Ave. so that the Fire and Life Safety Department has access ta the buildings. This has been noted on the plans. Condition 2: The property owner must notify the City af Springfield if this new building changes uses from the proposed "Storage Only" use. Any change in use may trigger additional Minimum Development Standards Review, building code requirements and Systems Development Charges. This will be addressed on the future Building Permit. Condition 3: Shaw the actual proposed lacatian of the south gate. If this does differ from the tentative plan, the sauth most street tree shall be relacated north af the gate. This has been addressed on the plans. The southern gate begins 9'-3" from the southern point, as shown on the tentative plans. No revisions are necessary to the landscape plan. Condition 4: Show the location of the trash receptacles on the Final Plot Plan. This has been address. 1.5 Cubic Yard max trash cans will be placed in the lean-to as no significant amount of trash is generated by the car sales. Condition S: Prior to approval of the Final Site Plan, the applicant shall submit an analysis of the infiltratian swales using the Simplified approach from the Portland Stormwater Management Manual prepared ond stamped by a licensed engineer. No drainage study beyond this is necessary for development. This is addressed in the stormwater analysis submitted with tho e Final Plot Plan. . nl.,{ f "\ 03te Received:~ Planner: LM . ..;J --.~~ . . ( ~Q\,6~ -;; S~ Condition 6: The infiltration basins shall be designed in accordance with the details provided in the Portland stormwater Manual for either and Infiltration planter or Vegetated Infiltration Swale, This is addressed in the stormwater analysis submitted with the Final Plot Plan, Condition 7: To promote plant health and for the infiltration basins to work praperly, the soil must be suitable for infiltration and pratected from compaction during construction, This is addressed in the stormwater analysis submitted with the Final Plot Plan, Condition 8: The attached deed restriction entitled "Covenant" must be completed and returned with the Final Plat Plan and Building Permit Submittal. This is will be attached with the Final Plot Plan, Condition 9: A Building Permit must be obtained for the structure, This will be addressed on the future Building Permit. This concludes the response, Please call if you have any questions, Sincerely, oj. '!" Date Recelved:_ID-\ \(-ID Planner: