Case Number:
Project Name:
Project Location:
Map and Tax Lot:
OCT 1 SLUlO
DRC201O-00021
Frank Lot Improvements
1415 Mississippi Ave., Eugene, OR
1703344309300
By:
Condition 1: A Public Works lock must be obtoined ot Heymon's Safe, Lack, and
Security for the manual swinging gate fronting Mississippi Ave. so that the Fire and
Life Safety Department has access ta the buildings.
This has been noted on the plans.
Condition 2: The property owner must notify the City af Springfield if this new
building changes uses from the proposed "Storage Only" use. Any change in use
may trigger additional Minimum Development Standards Review, building code
requirements and Systems Development Charges.
This will be addressed on the future Building Permit.
Condition 3: Shaw the actual proposed lacatian of the south gate. If this does differ
from the tentative plan, the sauth most street tree shall be relacated north af the
gate.
This has been addressed on the plans. The southern gate begins 9'-3" from the
southern point, as shown on the tentative plans. No revisions are necessary to the
landscape plan.
Condition 4: Show the location of the trash receptacles on the Final Plot Plan.
This has been address. 1.5 Cubic Yard max trash cans will be placed in the lean-to as
no significant amount of trash is generated by the car sales.
Condition S: Prior to approval of the Final Site Plan, the applicant shall submit an
analysis of the infiltratian swales using the Simplified approach from the Portland
Stormwater Management Manual prepared ond stamped by a licensed engineer.
No drainage study beyond this is necessary for development.
This is addressed in the stormwater analysis submitted with tho e Final Plot Plan. . nl.,{ f "\
03te Received:~
Planner: LM
.
..;J --.~~
.
. ( ~Q\,6~
-;; S~
Condition 6: The infiltration basins shall be designed in accordance with the details provided in the
Portland stormwater Manual for either and Infiltration planter or Vegetated Infiltration Swale,
This is addressed in the stormwater analysis submitted with the Final Plot Plan,
Condition 7: To promote plant health and for the infiltration basins to work praperly, the soil must be
suitable for infiltration and pratected from compaction during construction,
This is addressed in the stormwater analysis submitted with the Final Plot Plan,
Condition 8: The attached deed restriction entitled "Covenant" must be completed and returned with
the Final Plat Plan and Building Permit Submittal.
This is will be attached with the Final Plot Plan,
Condition 9: A Building Permit must be obtained for the structure,
This will be addressed on the future Building Permit.
This concludes the response, Please call if you have any questions,