DAILY REPORT OF STRUCTURAL STEEL AND HIGH STRENGTH BOLT SPECIAL INSPECTION
Project East Side BaNist Church
Address & Jurisdiction 4045 Commercial, Springfield, OR
Inspector Rick Hernandez
Permit # 81 I -SPR20 I 0-409
Date 2-24-1]
Inspection Type(s) I Coverage
high strength 'bolts, pre-installation verification
o Continuous
~eriodic; frequency twice
Inspections made, i~'cluding locations InspeCted for snug tight condition at haunch and ridge ioints of main frames
at frame lines \-5. '"
"
.;.:..' "\l
'.
Tests perfonned ,Tension calibratioh ofliigh strength bolts'
j; ~.
. ,I"
. '~,'
Items requiring 1) correction, 2) correction of previously listed items, and 3) previously listed uncorrected items
. I
Comments All bolts were installed to snug tight condition and erector proceeded to match mark. After match
marking was complete. inspection was made of a sample of bolts to verify matchl mark placement. Inspection was
concluded at this point. Also, observed pre-installation verification of pre-terJsioned high strength bolts
using tum-of-the-nut method with match-marking. Bolts tested were A325 size 'j," x 2 y,". Three bolts.
were installed and tightened in a Skidmore-Wilhelm model MZ. All bolts I were turned 1/3 nominal turn
and all met minimum tension requirements per AISC specifications. Gen~ral contractor provided us
with a new erection drawing set dated I 13/]1 which he stated was to super~ede the previous set dated
III2/10. He pointed out that several of the bolt sizes at the ioints requirin~ special inspection had
changed. As we had previouslv done a pre-installation verification on all sizes except the 'j," x 2 \1,",
this size was verified today. It was also noted that the 7/8" A325 bolts welhad previously verified (see
BEl report of 2- 16-] I) were actually 3" long -- not 2 'j," long as stated in that report. Erector was asked
to notify our office for additional inspection after turn-of-the-nut has been 'completed,
" ~ "
Io the.best of my Knowledge,hvoik.inspectedabove waslri accordance with the Duilding department approved
plans, specifications, and applicable workmanship provisions of the controlling bLilding code.
,~
lnspcctor SignatureC-
'J, '.'-
I ~ . -
lD/Certificate Number
I <'C if.- &:18'1342-
Copies to
City of Springfield
Cascade View Construction! Matt Knights