Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2011-2-24 (@) Branch Engineering, Inc. ~ Branch Engineering, Inc Report # 09-077-02 Headquarters 310 5th Street Springfield, OR 97477 (541)7460637 www.branchcngineering.com SalemfKejzer Office 4310 Cherry Avenue, NE Salem. OR 97303 (503) 779 2577 DAILY REPORT OF STRUCTURAL STEEL AND HIGH STRENGTH BOLT SPECIAL INSPECTION Project East Side BaNist Church Address & Jurisdiction 4045 Commercial, Springfield, OR Inspector Rick Hernandez Permit # 81 I -SPR20 I 0-409 Date 2-24-1] Inspection Type(s) I Coverage high strength 'bolts, pre-installation verification o Continuous ~eriodic; frequency twice Inspections made, i~'cluding locations InspeCted for snug tight condition at haunch and ridge ioints of main frames at frame lines \-5. '" " .;.:..' "\l '. Tests perfonned ,Tension calibratioh ofliigh strength bolts' j; ~. . ,I" . '~,' Items requiring 1) correction, 2) correction of previously listed items, and 3) previously listed uncorrected items . I Comments All bolts were installed to snug tight condition and erector proceeded to match mark. After match marking was complete. inspection was made of a sample of bolts to verify matchl mark placement. Inspection was concluded at this point. Also, observed pre-installation verification of pre-terJsioned high strength bolts using tum-of-the-nut method with match-marking. Bolts tested were A325 size 'j," x 2 y,". Three bolts. were installed and tightened in a Skidmore-Wilhelm model MZ. All bolts I were turned 1/3 nominal turn and all met minimum tension requirements per AISC specifications. Gen~ral contractor provided us with a new erection drawing set dated I 13/]1 which he stated was to super~ede the previous set dated III2/10. He pointed out that several of the bolt sizes at the ioints requirin~ special inspection had changed. As we had previouslv done a pre-installation verification on all sizes except the 'j," x 2 \1,", this size was verified today. It was also noted that the 7/8" A325 bolts welhad previously verified (see BEl report of 2- 16-] I) were actually 3" long -- not 2 'j," long as stated in that report. Erector was asked to notify our office for additional inspection after turn-of-the-nut has been 'completed, " ~ " Io the.best of my Knowledge,hvoik.inspectedabove waslri accordance with the Duilding department approved plans, specifications, and applicable workmanship provisions of the controlling bLilding code. ,~ lnspcctor SignatureC- 'J, '.'- I ~ . - lD/Certificate Number I <'C if.- &:18'1342- Copies to City of Springfield Cascade View Construction! Matt Knights