Loading...
HomeMy WebLinkAboutComments Miscellaneous 9/4/2008 Master Plan code revisiops . . Page I of1 KARP Gary From: Farrington, Phil [PFarrington@peacehealth.org] Sent: Thursday, September 04, 2008 12:23 PM To: KARP Gary Cc: MOTT Gregory; GRILE Bill; Werfelmann, Jim; Saydack, Roger; KNAPEL Carole Subject: Master Plan code revisions Attachments: MASTER PLAN AMENDMENT DRAFT 2 (2) wPF edits. doc Gary, Attached are my comments and suggested edits provided in legislative format regarding the City's proposed changes to the Master Plan section of the Springfield Development Code. Please enter these comments into the record. If you have any questions/comments, please contact me. Regards and thanks for the opportunity to comment, Philip Philip Farrington, AICP Director, Land Use Planning & Development PeaceHealth Oregon Region 123 International Way Springfield, OR 97477 (541) 686-3828 fax (541) 335-2595 mobile (541) 912-9281 I1farrinqton@I>eacehealth.orq <mailto: pfarrinqton@l1eacehealth.orq> <<MASTER PLAN AMENDMENT DRAFT 2 (2) wPF edits.doc>> TIlls message is intended solely for the use of the individual and entity to whom it is addressed, and may contain information that is privileged, confidential, and exempt from disclosure under applicable state and federal laws. If you are not the addressee, or are not authorized to receive for the intended addressee, you are hereby notified that you may not use, copy, distribute, or disclose to anyone this message or the information contained herein. If you have received this message in error, immediately advise the sender by reply email and destroy this message. Date Received: 01 04 (J ~ Planner: GK 11/20/2008 OVERVIEW Draft 07131108 eF;tf42//VQp;('v ~ co;tIM (;;;Illi] . The proposed amendment of Section 5.13-100 Master Plans arises from issues occunring during and after the review of the Marcola Meadows, RiverSend and MountainGate Master Plan applications. The proposed amendment is based upon the current Master Plan process, which will not substantially change. The proposed amendment 1. Addresses application completeness by requiring the same Pre-Submittal Meeting review process that currently applies to Site Plan, Subdivision and Partition applications to also apply to Master Plan applications (see Sections 5.13-115 and 5.13-132). 2. The reference to "basic underlying assumptions" found in the current Master Plan regulations is deleted because they were found to be redundant when the Master Plan submittal requirements (see Section 5.13-120) and modification processes were amended (see Section 5.13-135). 3. Establishes separate Preliminary Master Plan application review (see Sections 5.13-115 through 5.13-130) and Final Master Plan application review (see Sections 5.13-131 through 5.13-134) processes. The Preliminary Master Plan application is reduced from a Type III/IV procedure to a Type II/III procedure. The Final Master Plan application is specified as a Type 1/11 procedure. 4. Establishes a Neighborhood Meeting public involvement process prior to Preliminary Master Plan submittal, which would be the applicant's responsibimy (see Section 5.13- 117). 5. Establishes clearer Preliminary Master Plan submittal requirements and approval criteria sections to allow both staff and the applicant to better address them (see Sections 5.13- 120 and 5.13-125). 6. Continues to ensure the applicant protection from most new development standards for the 7 year Final Master Plan approval time line to include extensions for up to 10 years, but does not apply this protection for extensions over 10 years up to 15 years (see Section 5.13-140). 7. Establishes the following Master Plan review process: a. Pre-Application Report application - the applicant asks questions of staff; staff responds in writing and explains the review process (applicant submits/staff reviews); b. Neighborhood Meeting (applicant's responsibility, including notice): c. Pre-Submittal Meeting application for the Preliminary Master Plan application - completeness review (applicant submits/staff reviews); d. Preliminary Master Plan application formal submittal and acceptance (applicant submits/staff reviews); e. Preliminary Master Plan approval/denial (staff or Planning Commission decision). f. Pre-Submittal Meeting application for Final Master Plan - completeness review applicant submits/staff reviews); g. Final Master Plan application formal submittal and acceptance (applicant submits/staff reviews). h. Final Master Plan approval/denial (staff) - The Final Master Plan application must be submitted within one year of Preliminary Master Plan approval. If the Final Master Plan is not in substantial compliance with the approved Preliminary Master Plan, the Final Master Plan will require Type II procedure; i. Recordation of a Memorandum of Final Master Plan approval and any additional conditioned documents (applicant); j. Final Master Plan approval granted effective on date of recordation (staff); and k. Submittal of the Subdivision and Site Plan Review applications to initiate the various phases (applicant submits/staff reviews). Date Received' 070:; 0 <2. Planner: GK . - . . Commentary. Current Section 5.13-100 is deleted in its entirety to make room for the proposed amendments. However, the term "Master Plan" is currently mentioned tn SDC Sections 3.4-215 through 3.4-225 (the Glenwood Riverfront Plan District). This current version will be placed in SDC Appendix until such time as the Glenwood Refinement Plan and the Glenwood Riverfront Plan District are updated. Text proposed to be deleted is shown as: [sIRke through). Language proposed to be added is shown as: lanauaae added. [Sestion 6.13 100 Master Plans 1&.1310& P"",ese A. .^. Maeler PlaA is a sem~r..heAeive ~laA Ihat allowe ~hasiA~ of a e~eeifis se'Jele~menl ar..a ever several yoa,. fer ~lIelis, semmeffiial, iAsllelRal or residential development. .'\ Maelor PlaA, iA Ihis seAlex!, is s~eeifis Ie this Cese ans is AOt oonsider<lsle be a ",finement plan or any other eimilar slleset ef Ihe Melre PlaA. By ass",esiA9 ~lIelis eel\'iGo impacts aAs de'Jele~meAt reqllir..menls al Iho lime ef ap~",val ef Maeler PlaA, Iheee im~acts ans mqllirements Aeos not ee reass",ssed at elleeequeAt phaees aAslhe se'Jeloper may rely on the Master PlaA appro'lal iA implemenliA~ Iho se'Jelo~menl. B. The pll'llose of a Macter Plan is to: 1. Pro'.'ide ~fOlimiAary ap~reval fer the entir.. de'Jelopment ar..a in ",lotion te laAs IIses, a raA~e ef minimllm to maximllm potontial inlonEitios and sonEitieE, aFf8A~emenl of uses, aAs the leGatioA of puelic faeil~ioE and ImAEperlatieA EyclomG when a se'JelOpmoAt ama is ~r..poses to eo sevolopos in ph aces; 2. Aesure that insi.:isual ~hases of a sevelop",eAt will eo GOefS/Aates with eaGh other; 3. Pr"'.'ise tho ap~lisanl aA aGellrancs of the City's expectatieA for Ihe e':erall sO'Jelopment as a basis fer setailes ~laAAiA~ and in\-eslmont by the develo~er. C. The PlaAAiA~ CemmiseieA shall a~~"'vo the '1acter PlaA pRor to City ap~"'''al of a ",Iatos SIIMi.JiEioA or Site PlaA a~~lisalioA; hO>\'e'.'ef, Ihe Master Plan may ee f8\'iewes ceneufHlAtly with a Zonin~ Map ameAs",enl, DisGretienary Use, 'laRa Ace aAslor aAY ethor a~plicatioA or app"".'al sell~ht ey Ihe a~~lisaAt ",Ialeslo tho Maeler Plan. g. SII9jesl Ie ~Ror a~~""'al of a Maeter Plan, a soparate Suesi'JisieA er Sito PlaA application shall ee a~~",ves fer each phaee. The Maeler PlaA shall eo the easis fer Ihe evalllatien of all ~hases of de'Jolopment on any issues that it assfesses. Phases may be Gemeines fer censiaemtioA. E. Apwo'Jal of a Maeter PlaA is effecti"e fer lip 10 7 yea,.; howover the a~p"'\'es Master Plan time limit may ee extendod ~1I,.uant Ie Sectien 5.1 J 1 J5, AferJi/i{la!;ons to /tIo Master P!an anrJ Scherill/e. 1&.13110 Alllllieaeility Tho Master PlaA proceSG a~plies '....Ron iAitiatoa ey aA applicaAt "heA Iho fellowin~ GrileRa are me\; 2 Date Received: 0''1 0' q. 0 'ti Planner; GK The de'Jelapmant area is ~nder aRB awne~hip; ar If th.e de'/alapment araa has m~ltiple a""'e~ th wRtln9 Ie the Master Plan Feview pres~~s' 'd en all aw"e~ af ",serd ha,,,,, sansented in The ae\'Slel'lmeRt 8AJ3 is a 3~m& er great~~.A ~Jetwithstandin9 the "lra9aing the D' Gt . . ' IFe armardete . th IS InappropRate as a Maeter Plan and the ap I" ti ,:",'ne atthe prepesed develapment p Isa an 11111 net be asooptad. 16.13116 Re"ie'" . n . . . "0 B. c. D. . "0 Master Plans ara F8'/iewed ~Rder T' e III the applisatian ehauld be re'.e'''ed li. a T ~ra~~/d~F8: ~nless the Direstar eete""ineG that oomplexity af the applisatia~. .. ~pe deslelan by the City Ca~nGiI d~e te the B. A Maeter Plan shall sontain all ef the ele . te eemanslrate that the pra'JiGians af thism;:~s PF8P~~d In a slear and le9ible manner Resessa'v "mlted ta the fellawing: e are eln9 ful~lIed and shall inslude b~t Rat be I . r.o The existing Met", Plan desi9natien and zene slassi~satien. ^ 'JiciRfty m3p dr~wn te EGale SA a Elms! b3E9 map. A le9al desoRptian af the pF8pertv ta9ather '''ith a m ba~neaRes af tAe s~bjeGt f'r.gpa,Jv. .. ap dm",,, to scale dopislin9 tha le9al 1'. topa9Faphy map and narrative depiGtin FeS streets, si9"i~sant "egetatia" "'ellands j p. ent ~ses af the land, existin9 st,"slums man made feat~Fes. ' , lalnage 'I'ays aRd ather rele'/ant natural and' f. s~e plan shawi"9 lacatiaR a"etypa ef all land ~ses . appraxlmate R~mber af ~"its ar sq~ar f t f praposed. approximate aGreage aRd rele'/ant featuros. e aa age a ~Ges, adjaoe"t property ~ses aRd B. C. D. E. F. The EfeA&ity er iRter-lEity sf I3mpeced blEeE. Th . . e maXlm~m hel9ht aRd size af propased struct~res. ^' p~b'io faGilities plan shewin9 existin and . . . "alu",1 ane pipee sla"" e"'inage s . t9 ..,prepased streets, ~tl"tlas, sanitary sewer trans.it lec3tioRE. ~E em, ..ater SeF\'lSB, l3ike and peEloEtri3n ways. 3~d Maps and narrative sha"'in9 alf sita bl"' develapmeRt aRd/ar ta ';'iti9ate impa'::s t~ ~~pre'/etments necessary la serve the prepased peeR prepert',,' er puolis fucilities. G. H. I. 3 Dale Received: 0 9 oq 06 Planner: GK ~:e~;::~t~:~I~:~~~~Il::::~e,~~~~~::.':~o;SReoossa~ to e'Jal~ate IRe proposed oaR ita,,!, Iree preoeIValioR Ristorisal arsha I EElaRa~s's, geology, oo,ls, slom1'/Jater, e_cl~ding viciRi\>' aRd dela'il maps shallll o~l:g,sa, aR lrallis 'mpast. ,1\11 relaled maps, ~ I e 8. ~-e &3me 6Gale. Pr<l\'ioions if aRY fOF reseR'ali d d' r ll'" Rellimiled 10:' ligRls of ~ayO~ao:~':R~OR, o;:se of laRd fur p~lllis P"'llosos, iRSI~diRg, , s, pa s, opeR spases, aRd sSRool s,les. ^R o"orall sSRod~lo or doscription of phasiRg; aRd IRe de"olopmeRt 10 OGG r' pRase. If pRaslRg anomali'/os aro cORlomplated, !Rese altemalives oRallll~ ~::~~~d. '^II1ere off site or olRer inffaslrust . " . the limiRg aRd metRod of sec~liR~~~ Impr<l'~,meRls are raq."lfed, IRa applisaRI sRall specify deposil or other sesurro' satisfaster" ~~":.~,:"..emeRI, IRsl"d,ng 1l0nd,.loller at sredij, jaiRI I I I IFRf3Fe'lsment oonEtrudl9R. N. Dosignalion of r<:lspoRsillility ler pro'/idiRg iRffestrust"rG and san'ises. O. A geRaral sSRod"le of aRne_aliaR oonsislenl witR IRa pRasiRg plaR, if applisellla. 16.13126Crileria . . J. K. l. M. .^. Masler PlaR may lle appre"od if Iho Planni G .. alloflhe fullowiRg approval crilelia IR IRe o":~t ~mm'ss~eA fiAds IRat IRe prepesal SORIe""S wilR S~llsestioR, IRe mar.. specific req"lr<:lmeRts ;PPlye a SOR ,st VJijR appreval srilelia iA IRis A. ~:li:~I~g Ref~Re prepelly sRall be sORsisteRt "'ilR Ihe Melm PlaA diagram aAdler PlaR; e AomeRI PlaR diagram, PlaR DiolRst map, and CORcept~al De'JolopmeRt B. ~;~~'::::~~~:~~d~:::ep~I~~:~, ::::~oR~~~i~~::ASb~~~::I:~e~~::.,m~Rllcoda e<e opmeRI PlaR pollaes. ,p ~a ~~~::~::a~:~eaR: o:s~~e i~:'<l"em,~Rts, 1l0lR pulllis aRd pR'/ale, are EullicieAI to facilities plaRs; aR: P':ViSiOR: ar~e~::, ~lopmeAt aRd aAY sapasijy requir..meRts of pulllis oonjuRclioR 'NiIR a sCRod"le of tRe PRas~R:. asoure sOAslrust'OR of off s,le ,mpro'/emeRls iR =uest sRall pra','ide adequate guidaRse ler tRe desigR and coordiRalion of M"re C. D. E. Physical lealures, iRcI"diRg 1l"1 Rot limited te stee sl " . . cORdilioRS, areas witR susceptillility 10 flood' . P 'fi apes .A1R uRolallle sail or goologis v.'3teFC9b1r:t9s SRS,uA SA tl=le 'AI \A, lAg, EI.gRI C3R.t ChJEtSr-t 9ftr:est JAg thrub& ",.k o"t.,. iR .. d .. QL. r1ap aRd thelf asoos,ated lipaliaR areas, wollaRd~ Eignifis3 flJ3 gE ~R spaR .Ep3~9E anGt 8m3€: af hitteFis 3nGler :lrch3eelegiC31 I r=ace :at m3) be EJ;lBcl'fie9 IR ~8Gti9A J J QOO G JOO.2J5 249 cRalllle pr<ltected as specified i~ IRis cO;de ~~i~7S;~~ :;~e~~~.;.~;.~55 :Rd I an ~~::~:::I~~~e~~:~:::aRs aRd local slr<:lel plaAs oRall Rsllle ad'.'ereely impacted lly lhe F. 4 Date Received: 09 Oif OlO Planner: GK . . I 5.13130 COf1llilioAS The ^~f'Jr:e'/31.^.l:Itt-l9m}' may attacR reaE:9Aalaly ReeSE-Eary G9r:uiitisAE. fa miAim~9 negati'''B impactc as spasified iA Ihis Code te eAsuro Ihalthe proposed de\-elepmeAI san fully meetlha sRleRa ef SeGliaA 5.13 125, aAd may feq"ir.. guamnlees te enEur.. semplianse. ^ddijieAally, the approval may GOAtaiA aAY GOAdilioAS Aesessary Ie implemeAtlhe pro'/isieAs 01 SeGliaA 5.13 120 iASludiAg a sshedule 01 feos aAd sha'!les, a sshedule 01 sampliaAce ro'-ia'" aAd Ihe e><laAlla 'Ntllsh the Masler PlaA is assigAable. I 5.13135 Medifisalions to the Master Plan and Sshedule ApplisatiaAs fer phaEe medificalioA appro'-al"'hish are iA substanlial soAfeffflily 'Nilh aA appreved Master PlaA shall not be deemed a medifisalieA ellhe plaA. '1edifiGaliaAs te the Masler PlaA shall be processed uAder Ihe applisable p",sedur.,s dessRbod bolew te ameAd Ihe PlaA: ,... '1edifisetieAslhat de AeI alleGllhe basis unde~yiAg assumptioAs 01 the adoptod Maslor Plan aAd whish af8 Aol de!elmiAed Ie be similar 10 SubsaGliaA B. or C., below shall ba prosessed as a miAisteRal desisien by Ihe Dif8G1a'. B. Madifisalions thaI af8 SigAifiseAI, bul do Aat alleGllhe basis uAde~yiAg assumptiens af Ihe appr"'.-ed Masler PlaA, shall be p",sassed uAder Typa " proGOdure. These medifisa!iaAs iAsluda a request: 1. By the applisaAt fer a shaAge 01 deAsity alloGalian wilh in the deAsity raAge allowed iA Iha appliseble zOAing dislrisl; 2. By tha applicaAt fer a shange Ie Ihe alignmenl ef right 01 'Nay f8qui,ements ef 10031 sIfeeI&; 3. By Ihe applisaAI or City fer a shaAge 10 the sizes or laGalieA ef publis Iasilijies; 1. By Ihe applisaAI fer a shange 01 ssheduled phasiAg beyoAd tha apP",\-od lime limit fer Ihe phased develapmanl whan Ihe prapasod shange alleds Ihe sonslNGlion of sshedulod p"blis improvements; 5. By tha City based on Ihe roq"irement to implomaAI newly adepted State or ~edeml fSgulaliens; 6. By the applisaAI fer a one lime ellteAsieA of Ihe appra\-ed time limil fer up 10 threo ye3rE. The time line extencien willes gl:zmted provided the app-lis3At f::Ias made f8asonable prog,ess iA the implementalioA ollha Mastor PlaA aAd publis se,vices and Iasilities remain a'.-ailablo; 7. By Ihe applicaAI to aUar signifisant nal",al roso"FGes, "",llands, open spase a",as, a'Ehaeologis aAd hisloris loatur.,s beyond IRe ssope af Iha app",'/ed Masler PlaA; Of 8. By Iha applicant for olhor modifisalioAs 10 the app",'/ed Master Plan Ihat Ihe Dirm:tor detalmiAes to ba similar 10 tha medifisatiaAs spesified in Ihis SubseGlioA. 5 Uate ~ecejved: Q<1 Oil- 00 Planner: GK . . c. '4eaifisatieAs."'.1,isA ~lfeGlIAe uAae~yiAg basis assumplieAs eftAe appm'/ea Master PlaA er IAat pr"Alb~, ,..,stAGI er sigAifisaAlly alleGl ~s implemeAlalieA sAall be pmsessea uAaer IAe Type III proseaure, aAa iAcluae: 1. .\ Z~RiRg ~13f} 3m9RomeAt er Qissr:etisRarj Ute appliQatieR iRitiated by tAe applisanl; A .,..,quest fur IAe re aligAmeAI er re aesigAalieA sf alteR31 er selleGler slreets '"'t,alea by IAe applieaAI; 2. 3. The iAability sf tAe City er IAe appliGaAI te pr..viae essential publiG iAfraElRJGlur..' A request by the City basea eA tAe requiremenl tG implemeAt ne,lAy aaeplea State er Feaeral regula,,"ns; .. 6. s. . ... ^ppro"al ef tAe Masler PlaA sAall assure IAe applisaAt IAe rigAt Ie pmGeea "'itA the aevele~meAt In s,~belaAllal oonfe""ity with Ihe '4aster Plan, subject Ie any meaifisatieAs as ma, be appre .ea as speslfiea IA SectleA 5.13 135. Changes Ie OraiAaAces pelieies aAa StaAaamS aaeplea after tAe aate ef approval ef IAe Masler PlaA shall Ael a~ply te IAe ae'lelepmeAI. B. ~haee apprevals sAall eGGur through Ihe laAa aivisieA review pmcess, as speGifiea iA eGlleA 5.12100, e"he Sile PlaA review presess, as spesifiea iA Seelien 5.17100 as applicable. ' c. The Master PlaA sAall be the basis fur IAe evalualieA ef all pAases ef aevelepmeAt eA :AYAlCsues WAIGA ~ aaamsses. Appro'/al ef ae'/elepment phases '.'AII be granlea subjeGl e I e le""s ana seAaitieAS ef IAe Maeler PlaA, but subject Ie Ihe applisable DevelepmeAI Ceae pre'/isieAs aAa City Ominanses eA issues '."hiGA lAG Maeler PlaA eees Ret 3ggreS&. D. Nelv"~~stanaing Ihe preseaiAg pm"isien, IAe City shall Ael be ebligalea Ie proviae public Impro.emeAIs affeGllng ImplemenlalieA ef IAe '4asler Pia A if publis fuAas are Ael a'.'a,lable. E. The City shall nel be requir..a Ie appm'.'e ae'/elepmenl el aAY phase aessRbea iA Ihe :::,:,er Plan ,llhe appro'/al vielates applisable Feaeral er Stale stalues er aaminielrative F. The appmvea Master Plan sAall be reoomea al Lane Ceun~J Deeas aAa ReGeras aAa IAe e~glAal retumea Ie tAe City.] 6 _,;'lc .-,,,Ct;llieu. 0 '1 0'-1 0 Cd Planner: GK . . Commentary. The proposed subsections are listed below. Section 5.13-100 Master Plans Subsections: 5.13-105 Pumose 5.13-110 Applicability 5.13-115 Preliminary Master Plan - Review 5.13-116 Preliminary Master Plan -Application Concurrencv 5.13-117 Preliminary Master Plan - Neiahborl1ood Meetina 5.13-120 Preliminary Master Plan - Submittal Reauirements 5.13-125 Preliminary Master Plan - Criteria 5.13-130 Preliminary Master Plan - Conditions 5.13-131 Final Master Plan - Review 5.13-132 Final Master Plan - Submittal Reauirements 5.13-133 Final Master Plan - Criteria. Recordation and Effective Date 5.13-134 Final Master Plan - Phasina Implementation 5.13-135 Final Master Plan - Modifications 5.13-140 Final Master Plan - Assurance to the Applicant and City Disclaimers I 5.13-105 Pumose Commentary. The 'definition' of a Master Plan is clearer- the specific purpose is to allow phasing of development over lime. A. A Master Plan allows phasin~ the development of a specific proaertv over several vears. Commentary. The current purpose statements are revised to give them more substance. B. The purpose of a Master Plan is to: 1. Facilitate the review of laroe-scale. multi-phased developments and ensure that individual phases will be coordinated wijh each other over the duration of the Final Master Plan: 2. Ensure that a full ranoe of public facilities and services are available or will be provided for the proposed phased development and to plan the extension of necessarv public infrastructure in a timelv and efficient manner. 3. Establish specific land uses. a range of minimum to maximum potential intensijies and densities. the arrangement of uses. and the location of public facilities and transoortation systems; 4. Identify the incremental and cumulative impacts associated with the proposed development and consider alternatives for mitigating these impacts to affected properties and public facilities: 5. Provide the propertv owner an opportunity for the concurrent review of discretionarv land use decisions: and 7 Jate Received: 0 9 0 if 0 g Planner; GK . . 6. Provide the oroeertv owner with the assurance needed over the lone term to olan for and execute the ro osed develo ment. 5.13-110 A licabili Commentary. The current SDC Master Plan review process implies there is a two-step process, but is not specinc. The proposed review process is formalized into two distinct steps - the Preliminary Master Plan and the Final Master Plan. A. Aooroval of a Master Plan is a two-steo orocess that includes Preliminary Master Plan Aooroval and Final Master Plan Aooroval. This orocess aoolies when the followino criteria are met: 1. The oroeertv is under sinole ownershio: or if the oroeertv has multiole owners. all owners of record consent in writina to the Master Plan review orocess: and Commentary. There is no change to the current 5 acre minimum, except that there may be situations where a person owns less than 5 acres and desires more time to develop than is currently allowed by the Site Plan Review process, which is 2 years, with up to a one year extension. There is no change to the current maximum allowable time line of 7 years, unless an extension is requested and granted as discussed in Section 5. 13-135. 2 The oroeertv is 5 acres or oreater and the aoolicant desires develooment to be phased over a eeried not to exceed 7 vears. EXCEPTION: The Director mav allow an exceotion to the 5 acre minimum. if the aoolicant reQuests ohasino for more than 3 vears. Commentary. Originally, the Master Plan process was adopted in the 1980's to apply to MountainGate, a residential development. Most recent Master Plan applications have involved either commercial or commercial/residential mixed use. Subsection B. lists proposed development options that may occur in a number of zones or mix of zones. B. A Master Plan mav include oublic, commercial. industrial or residential develooment. or any combination thereof. I 5.13-115 Preliminarv Master Plan - Review Commentary. There is a change proposed for the level of review for a Preliminary Master ptan. Currently, a Type //I procedure (Planning Commission review) is required for all Master Plan applications. A Type tI procedure is proposed because the intent of the Master Plan process is similar to a Site plan application, which is a Type tI review. The difference between the two applications is that Site Plan approval is good for 2 years and the Master Plan approval is good for 7 years. A. The Preliminary Master Plan shall be reviewed under lvoe II orocedure. EXCEPTIONS: The Preliminary Master Plan shall be reviewed under Tvee III orocedure it 1. The Director determines that the OroDOsed develooment mav have DOtential imoacts on oublic facilities andlor other oroeerties: andlor 8 Uate Received' 09' oq 0<;3 Planner: GK . . . 2. The aoolicant chooses to submit concurrent Tvee 111 orocedure aoolications as may be eermitted in SDC 5.13-116.8. B. Prior to the submittal of a Preliminary Master Plan aoolication: Commentary. The "Pre-Application Report" process is currently used to allow the applicant to ask staff an unlimited number of questIons regarding the proposed development. No change is proposed regarding the use of this process. 1. A Pre-Aoolication Reoo" aoolication, as seecified in Section 5.1-120.8.. is reauired orior to the formal submittal of the Preliminary Master Plan aoolication. Commentary. A Master Plan is a complex application. Requiring the Pre-Submittal Meeting application will allow staff to evaluate the Preliminary Master Plan application for completeness, prior to fonnal submittal by the applicant and the start of the State-mandated 120-day review time line. 2. A Pre-Submittal MeetinQ aoolication, as soecified in Section 5.1-120.C.. is reauired orior to the formal submittal of the Preliminary Master Plan aoolication. I 5.13-116 Preliminary Master Plan - Aoolication Concurrency Commentary. Currently, there is no prohibition on concurrent Metro Plan diagram and/or text amendment applications, but past City practice has been that the any required Metro Plan diagram and/or text amendment application was approved prior to the submittal of the Preliminary Master Plan application. The text in Subsection A., below continues this past practice. A. If the aoolicant reQuires or oroooses to chanQe the Metro Plan diaaram and/or text, the aoolicant shall aoolv for and obtain aooroval of a Metro Plan diaaram and/or text amendment orior to the submittal of the Preliminary Master Plan aoolication. The Metro Plan diaaram and/or text amendment may also reauire amendment of an aoolicable refinement olan diaaram or Plan District MaD. B. The Preliminary Master Plan may be reviewed concurrentlv with other Tvee 111 aoolications indudina a Zonina MaD amendment. Discretionary Use, Maior Variance. or a Willamelte Greenwav develooment aoolication. Commentary. Currently. SDC Section 5. 13-105C. states: "The Planning Commission shall approve the Master Plan prior to City approval of a related Subdivision or Site Plan application...." This language now specifically refers to the "Final" Master Plan. There is no change to the intent of this requirement. C. Subdivision and/or Site Plan aoolications that initiate the various ohases of orooosed develoDment shall not be submitted concurrentlv with the Preliminary Master Plan. These aoolications shall not be submilted until Final Master Plan aooroval is aranted. as soecified in Section 5.13-133. 9 LJate Received: oct oil 0''13 Planner; GK 1----- -----. , . . I 5.13-117 Preliminary Master Plan - Neiahborhood Meetina Commentary. During the Marcola Meadows Metro Plan diagram and Zoning Map amendmenl process, the applicant voluntarily provided notice and held a neighborhood meeting to explain the proposed development. This undertaking helped educate neighbors to the intent of the proposal prior to the public hearing process. This is now a requirement for Master ptan applications because it allows the public to be involved in a maior development while still in its early stages and complies with/utilizes State-wide planning Goal I, Citizen Involvement. Farrinoton commentary: I suooest vou clarify that this applies ONLY to the preliminary Master Plan and not to amendments/modifications. Suooest also that City staff clarify reoardina reouired notice: is it reauired that the applicant send out a postcard notice of the meetina to all residents within a aiven neiahborhood? Onlv within a specified distance - e,a., 300' - from the Master Plan boundaries? What about areas in the City where there is no established neiahborhood association? Also, what form/format should the minutes be in that are submitted to the City? And how muchlwhat information is reouired of the applicant to share with the neiohbors? Does the location matter? Must it be in a place that is ADA accessible or otherwise a publiclv owned meetina space? Need it be within the neiohborhoodlarea of the Master Plan proposal? Other communities have reauirements for such meetinas with neiohbors: I suaaest those Codes le.a.. Albanv) be researched and/or staff contacted to see what lessons mav be learned. To provide the opportunity for earlv citizen involvement in the Master Plan review process, the applicant shall provide notice and invite citizen participation bv initiatina a Neiohborhood Meetino after receipt of staffs response to the Pre-Application Report application required in Subsection 5.13-1178.1.. and prior to the formal submittal of a Preliminary Master Plan application. The applicant shall be responsible for schedulina and notice costs. The applicant shall provide information reoardina the application at the meetina. The applicant shall submit minutes of this meetina with the Preliminary Master Plan application as reauired in Subsection 5.13-120N. I 5.13-120 Preliminary Master Plan - Submittal Reauirements Commentary. The submittal requirements Section is updated to incorporate certain aspects of the Site Plan Review application in order to provide more specificity to the applicant. The Preliminary and Final Master Plan applications shall be prepared bva desion team comprised, at a minimum, of a proiect architect, enaineer, and landscape architect. A project coordinator shall be assianed. All related maps. excludina vicinity and detail maps, shall be at the same scale. A Preliminary Master Plan shall contain all of the elements necessary to demonstrate compliance with the applicable provisions of this Code and shall include, but not be limited to: A. General Submittal Reauirements. The applicant shall submit a narrative aenerallv describino the pUrPose, operational characteristics and potential impacts of the proposed development on adiacent properties. The narrative shall include: 1. The existina Metro Plan desianation and zonina. Where the proposed Master Plan sile is within an overlav district, Plan District or Refinement Plan the applicable additional standards shall also be addressed: 2. The location and tvee of land uses proposed: 10 .-'C.,i; l~Gceiveo. 09 Cif og Planner: GK . . 3. The orocosed number of residential units and/or sauare footaae of commercial. industrial and/or oublic uses; 4. The densilv or intensilv of orocosed uses, includino aoolicable Floor-Area Ratios (FARs): and { Deleted: 5. A discussion of how any ootential imoacts of the orooosed develooment on adiacent orooerties may be mitiaated. 6. The aoolicant shall attach: a. A maD deoictina existina zonina and land uses within 250 feet rFarrinaton: Suaaest that the distance roouired here be consistent with notice roouirement for neiahborhood meetina and other Code notice roouirements.! of the orocosed Master Plan boundary: b. A maD deoictina the orocosed Master Plan boundary toaether with existina 10tJoarcellines; c. A Vicinity MaD drawn to scale deoictina existina bus stoos. streets. driveways. Dadestrian connections. fire hydrants and other transcortationlfire access issues within 250 feet rFarrinaton: Same comment as above.! of the orocosed Master Plan site: and d. A looal desGriotion of the orooertv within the orocosed Master Plan boundary. B. A Site Assessment of the entire orooosed Master Plan site that oreciselv maDs and delineates the areas described below. Prooosed modifications to ohvsical features shall be c1earlv indicated. Information reauired for adjacent orooerties may be aeneralized to show the connections to ohvsical features. A Site Assessment shall contain the followina information. as aoolicable: 1. The 10o-vear floodolain and floodwav boundaries on the orocosed Master Plan site. as soecified in the latest adooted FEMA Flood Insurance Rate MaDs or FEMA aooroved Letter of MaD Amendment or Letter of MaD Revision: 2. The Time of Travel Zones. as soecified in Section 3.3-200 and delineated on the Wellhead Protection Areas MaD on file in the Develooment Services Deoartment: 3. Phvsical features includina. but not limited to sianificant clusters of trees and shrubs. wetlands as soecified in Section 4.3-117. rock outcroooinas and watercourses shown on the Water Quality Limited Watercourse CWLQW) MaD and their rioarian areas on file in the Develooment Services Deoartment In the latter case. the name. location. dimensions. direction of flow and too of bank shall be deoicted. If the orooosed Master Plan site is located within 150 feet of the too of bank of any WQLW or within 100 feet of the too of bank of any WQLW direct tributary. a Rioarian Area Protection Reoort is reauired: and II Date Received: 09 O<-f 06 Planner: GK . . 4. Soil tyDes and water table information as maDDed and sDecffied in the Soils Survey of Lane CounlY. A Geotechnical reDort DreDared bv a licensed Geotechnical Enaineer shall be submitted concurrentlv ifthe Soils Survev indicates the DroDosed Master Plan site has unstable soils andlor a hiah water table. C. A Gradina Plan which includes: existina and Drocosed elevations and where extensive aradina 12 or more feet of fill) is anticiDated for cortions of or the entire Drocosed Master Plan site. On hillsides. the Dlan shall show Dad sites and their relationshiD to the Dublic riaht-of-wav with existina contours at 1-foot intervals and Dereent of slaDe. In areas where the Dereent of slaDe is 10 Dereent or more. contours mav be shown at 5-foot intervals. D. A Stormwater Manaaement Plan diaaram which includes the storrnwater manaaement svstem for the entire DroDosed Master Plan site and anv imDacts on adiacent DroDerties. The Dlan shall include the followina comconents: 1. Roof drainaae Dattems and discharae locations: 2. Pervious and imoervious area drainaae oatterns: 3. The size and location of storrnwater manaaement svstems comconents. includina but not lim~ed to: drain lines. catch basins. drv wells andlor detention Donds: stormwater auality measures: and natural drainaaewavs to be retained: 4. Existina and Drocosed elevations. site arades and contours: and 5. A stormwater manaaement svstem Dlan with SUDDortina calculations and documentation as required in Section 4.3-110 shall be submitted SUDDortina the DroDosed svstem. The Dlan. calculations and documentation shall be consistent with the EnGineerinG DesiGn Sfandards and Procedures Manual. E. A Wastewater Manaaement Plan with maDS and a narrative deDictina the location and size of existina and oroposed wastewater facilities with SUDDortina calculations and documentation consistent with the EnGineerinG DesiGn Sfandards and Procedures Manual. F. A Utilities Plan with maDS and a narrative deDictina the location and size of existina and DroDosed water. electrical. aas and teleDhone service: and the location of existina and reauired traffic control devices. fire hvdrants. street liahts with the DroDosed desian oDtion. cower Doles. transformers. neiahborhood mailbox units and similar Dublic facilities. G. A ConeeDtual Landscaoe Plan with maDS and a narrative iIIustratina DroDosed landscaDina for the entire DroDosed Master Plan site. includina. but not lim~ed to: where existina veaetation is proposed for oreservation. esoeciallv rioarian and wetland areas and trees: installation of veaetative bufferina: street trees: aenerallandscaoina: and a 12 Date Received: 0'10i{ 0<;;; Planner; GK . . oercentaae ranae for the total amount of reauired ooen soace. broken down bv the tvoe of ooen soace. oublic and orivate. as aoolicable. H. An IFarrinQlon: Suaaest the word "Conceotual" be added here. Given the scale of a Master Plan submittal. both the conceotuallandscaoe olan reauired above and this conceotual architectural alan should be reauired to show massina. scale. and aeneral areas of imoact - NOT that it be reauired to show soecificijv as areat as that reauired for a Site Plan.1 Architectural Plan with maos. illustrative examoles indudina buildina elevations utilizina aoolicable SDC desian standards. and a narrative orovidina sufficient information to describe orooosed architectural stvles. buildina heiahts and buildina materials. I. A Parkina Plan and Parkina Study. 1. A IFarrinQlon: Suaaest addinQ "Conceotual"l Parkina Plan shall be submitted for all orooosed develooment and shall contain the followina information: a. The location. dimensions and number of orooosed oarkina soaces: includina aisles. landscaoed areas. wheel bumoers rFarrinaton: suaaest addina ". as may be necessarY' here. or delete this reference entirelv. Code orovides standards for oarkina area desian and wheel bumoers, and a Master Plan isn't the aoorooriate level to reauire this kind of detail. Likewise. a oarkina study and alan should not have to dimension off everv stall at the Master Plan level - these are details best determined at Site Plan Review. not at a Master Plan level. Simolv reauire that the aoolicant orovide a study and sufficient detail to demonstrate that they can accommodate oarkina in a conceotuallavout that meets Code reauirements for number of oarkina stalls consistent with dimensional standards orovided in Code. as well as oarkina area landscaoina. etc.1. directional sians and strioina: b. On-site vehicular and oedestrian circulation: c. Access to streets. allevs and orooerties to be served. indudina the location and dimensions of existina and proposed driveways and any existina driveways orooosed to be dosed: d. ,IFamnaton: Suaaest deletina this entlrelv. The Master Plan level is too early and not at the orooer scale to reauire a liahtina 01an.1 ."1 Deleted: ~e~hlino: soecifled in Subsection J below e. The location of orooosed bicvcle soaces: IFarrinaton: similar to oarkina above the aoolicant should simolv be reauired to identify how many bike oarkina soaces will be reauired. bv tyoe. and show conceotuallv where they'd be located. Greater detail can be shown at SPR.1 f. The amount of aross floor area aoolicable to the oarkina reauirements for the oroDOsed use: and 13 jate Received; 0 r c>q. og Planner: GK . . a. The location and dimensions of off-street loadina areas. ~ anv. 2. A Parldna Studv. for other than sinale familv developments. with maps and a narrative deoictina oroiected oar1c::ina impacts. indudina. but not limited to: proiected peak parkina demand: an analvsis of peak demand compared to proposed on-site and off-site supplv; potential impacts to rFarrinaton: Suaaest addina the words here "or use of the on-street parkina svstem and adiacent land uses; and proposed mitiaation measures rFarrinaton: Suaaest addina here ": if needed.1. L......... rFarrinaton: SU9aest this section be deleted entirelv. Detail can/should be provided at SPR level. If liahtina is a concern relative to neiahborina properly, then the Master Plan approval can be conditioned to assure that the issue be properlv addressed at the appropriate level of review - at Site Plan.l K. A Public Riaht-of-WavlEasemenUPublic Place Map depictina the reservation. dedication. or use of the ProDOSed Master Plan s~e for public pUlDOses. includina. but not lim~ed to: riahts-of-wav showina the name and location of all existina and ProDOsed public and private streets within or on the boundarv of the proDOsed Master Plan s~e. the riaht-of-wav and pavina dimensions. and the ownership and maintenance status. if applicable. and the location. width and construction material of all existina and proDOsed sidewalks: pedestrian access ways and trails: Drooosed easements: existina easements: Darks: ooen soaces. includina plazas: transit facilities: and school s~es. L. A Traffic Impact Studv. as specified in Section 4.2-105.A.4. the detailed scope of which mav be established bv the Public Works Director. The Traffic Impact Studv shall contain maps and a narrative depictina projected transportation impacts. includina. but not limited to: the expected number of vehicle trips (peak, .IFarrinaton: Suaaest deletina "events" - how could one plan for this appropriatelv unless there were some definition as to "events" or how this could be assessed. Is more propertv dealt with at the SPR level anvwav.], and dailv): an analvsis of the impact of vehicle trips on the adjacent street system: and oroposed mitiaation measures to limit any oroiected neaative imoacts. Mitiaation measures may include improvements to the street system itself or soecific proarams and strateaies to reduce traffic impacts such as encouraaina the use of public transit. carpools. vanpools. and other alternatives to sinale occupant vehicles. M. A Phasina Plan. Phasina shall proaress in a seauence that provides street connectivity between the various phases and accommodates other reauired public improvements such as wastewater facilities, stormwater manaaement. electricity and water. The Phasina Plan shall consist of maps and a narrative with an overall schedule or description of on- loff-site phasina includina. but not lim~ed to: the type. location and timina of proDOsed uses. includina buildina pads/envelopes: ProDOsed public facil~ies jncludina on-Ioff-site streets and traffic sianals or other traffic control devices and utilities with the desianation of construction and maintenance resDOnsibilitv. estimated starVcompletion dates with a oroposed financial auarantee to ensure olanned infrastructure imorovements will occur with each phase or when reauired bv the City. affected local aaencv or the State~ fFarrinaton: Suaaest this be eliminated: not sure what d~erence ~ would make. sav if a multi-familv structure were leased or sold as condos. It would have no real bearina to the phasina of the proiect. or if it did result in a chanae in the time duration of Master Deleted: An Dn-site Liahtina Plan deoictina the location orientation and maximum heiaht of all orooosed exterior Iiaht fixtures both free s1andina and attached The liahtina oIan shall also detail the tvoe and extent of shieldina { DeI"ed:~ Deleted: a statement of the aoolieanfs intentions with reoard to the future sellina or Ieasina of all or oortions of the orooosed develooment (where a residential subc::livision is orooosed the statement shan also include the aoolieant's intentions whether the aoo/leant or others will cons1ruct the homesl 14 o.Jat" Received: 0 cr 04-- CiS' Planner; GK . . Plan imolementation. then that could be covered elsewhere in Code bv chanaina the out- date of the Master Plan.l: and the relationshio of oedestrian and bicvcle connectivity and ooen soace reauirements to the orooosed ohasina. N. Neiahborhood Meetina Minutes. The aoolicant shall submit minutes of the Neiahborhood Meetina soecffied in Section 5.13-117. O. A coov of all orooosed and anv existina covenants. condijions. and restrictions that mav control develooment. if aoolicable. P. Annexation. A aeneral schedule of orooosed annexation consistent with the ohasina olan. if aoolicable. Q. The Director may reauire addijional information necessary to evaluate the orooosed develooment [Farrinaton: Suaaest that there be some criteria as to when the Director can reauire an ESEE analvsis. There is a rather dear basis to reeuire a wetland delineation or historicaVarchaeoloaical study. but these too oerhaos should be darified that they are reauired due to the oresence of iurisdictional wetlands on-site and a Goal 5 historical resource. or oerhaos as defined in 5.13-125 G below. The aoolicant should have some idea when and under what basis the Director may reauire an exoensive. time-consumina study such as an ESEE analvsis.], indudina. but not limited to a: 1. ESEE analvsis: 2. Wetland delineation aooroved bv the Oreeon Deoartment of State lands shall be submitted concurrentlv with the Preliminary Master Plan aoolication. where there is a wetland on the orooosed Master Plan site: and 3. Historical and/or archaeoloaical studies. R. Anv concurrent land use aoolications as soecified in Subsections 5.13-1168. I 5.13-125 Preliminary Master Plan - Criteria Commentary. The Preliminary Master Plan approval criteria are clearer. For example. criterion 5.13-1258. currently states: "The request, as conditioned, shall conform to applicable Springfield Development Code requirements." This is too broad because it refers to any SDC requirement. The following Subsections now connect specific aspects of the proposed Preliminary Master Plan criteria to the applicable SDC Chapter and/or Sections. The SDC defines "Approval Authority" as the Director, Hearings Official, Planning Commission or the City Council. A Preliminary Master Plan shall be aooroved. or aooroved with conditions. if the Aooroval Authority finds that the orooosal conforms with all of the aoolicable aooroval criteria. Commentary. The current "Metro Plan diagram" reference is deleted because either the applicant has recently applied for and obtained a Metro Plan diagram and/or text amendment, and/or the "correct" designation is already in place. Therefore. there should be no need to revisit Metro Plan policy as part of the Master Plan review process. A. PlanlZone consistency. The existina or orooosed zonina shall be consistent with the Metro Plan diaaram and/or aoolicable text. In addition. the Preliminary Master Plan shall be in 15 Date Received: oct oq- 09 Planner: GK . . comoliance with aoolicable City Refinement Plan, Conceotual Develooment Plan or Plan District standards, policies andlor diaQram and maos. Commentary. This criterion specifically refers to "all applicable standards of the zoning district" which include building height, setbacks, specific design standards, etc. B. ZoninQ district standards. The Preliminarv Master Plan shall be in como/iance with aoolicable standards of the specific zoninQ district andlor overlav district. Commentary. This criterion specifically refers to the required Traffic Impact Analysis from a transportation system capacity aspect in relation to proposed phases. in addition to the transportation standards contained in SDC Chapter 4. C. Transportation svstem caoacitv. Wrth the add~ion of traffic from the oropOsed develooment. there is e~her sufficient caoacitv in the City's existinQ transportation svstem to accommodate the develooment oropOsed in all future phases or there will be adeQuate caoacitv bv the time each phase of develooment is comoleted. Adooted State andlor local mobilitv standards, as aoolicable. shall be used to detennine transoorlation svstem caoacitv. The Preliminarv Master Plan shall also comolv with any cond~ions of aooroval from a Metro Plan diaQram andlor text amendment reQardinQ transportation and all aoolicable transportation standards specified in SDC Chaoter 4. Commentary. This criterion refers to cUfTent parking standards in SDC Chapter 4 Development Standards that apply to speCific transportation issues. D. ParkinQ. ParkinQ areas have been desiQned to: facil~ate traffic safety and avoid conQestion; provide biCYcle and pedestrian connectiv~ within the oroperty and to nearby transit stoos and public areas. The Preliminarv Master Plan shall also comoly with all aoolicable vehicular and bicyde oarkinQ standards specified in SDC Chaoter 4. Commentary. This criterion refers to cUfTent ingress-egress standards in SDC Chapter 4 Developmenl Standards Ihat apply to specific transportation issues. E. I"aress-scrass. Inaress-eoress ooints have been desianed to: facilitate traffic safety and avoid conQestion; orovide biCYcle and pedestrian connectiv~ within the oroperty and to adiacent residential areas, trans~ stoos. neiQhborhood activity centers, and commercial. industrial and oublic areas; and minimize driveways on arlerial and collector streets as specified in this Code or other aoolicable C~ and State reQulations. The Preliminarv Master Plan shall also comoly with all aoolicable inQressleQress standards specified in SDC Chaoter 4. Commentary. This criterion refers to current standards in SDC Chapters 4 and 5 that apply to specific utility issues. F. Availability of public utilities. Existina Dublic utilities. indudina but not limited to. water. electricitv. wastewater facil~ies, and stonnwater manaQement facilities either have sufficient caoacitv to suoport the oroposed develooment in all future phases adeQuately. or there will be adeQuate caoacitv available by the time each ohase of develooment is comoleted. The Public Works Director or aoorooriate utilitv orovider shall detennine caoacitv issues. The Preliminarv Master Plan shall also comoly w~h aoolicable utilitv standards soecified in SDC Chaoters 4 and 5. 16 Date Received: Ocr 01' 00 Planner: GK . . Commentary. This criterion refers to cUmJnt standards in SDC Chapter 4 Development Standards that appty to specific physical feature issues. G. Protection of ohvsical features. Phvsical features. indudina but not limited to slooes 15 oercent or areater with unstable soil or aeoloaie conditions. areas with susceotibilitv to floodina. sianificant dusters of trees and shrubs. watercourses shown on the Water Quality Limijed Watercourses (WQLW) Mao and their associated rioarian areas. wetlands. rock outcroooinas and ooen spaces and areas of historic and/or archaeoloaical sianificance as may be soecified in Section 3.3-900 or ORS 97.740-760.358.905-955 and 390.235-240 shall be orotected as soecified in this Code or in State or Federal law. The Preliminarv Master Plan shall also comolv with aoolicable ohvsical feature orotection standards soecified in SDC Chaoter 4. Commentary. This criterion addresses a specific phasing issue that arose during the Marcola Meadows Master Plan review process. H. Phasina Plan. The Phasina Plan shall: demonstrate that the construction of reouired oublie facilities will eijher occur in conjunction wijh. or orior to each ohase. or there are aporopriate financial auarantees to ensure public improvements necessary to suPPOrt the orocosed.construction will occur fFarrinaton: Suaaest revisina this lanauaae as the. aoolicant can not. and should nat. be reauired to oost a financial auarantee that all the develooment orocosed within a Master Plan area will definijelv occur and within the orosmbed time within the ohasina olan. The intent should be to ensure that the develooer orovides oublie infrastructure as needed to suocort each and every ohase of develooment orior to that aiven ohase - NOT that there be a costed security assurina that construction will occur. That is somethina that most develooers do not have the financial caoacitv to do. nor are they reouired to do so in any other subdivision. ete.l: and exolain the timina of construction and maintenance. and identify the oarty resconsible for financina and constructina and maintainina each ohase. Commentary. Compatibility and mitigation criteria are specificatly addressed. I. Adjacent use orotection. The orocosed Preliminarv Master Plan contains desian. landscaoinalscreenina. oarkinaltraffie manaaement and multi-modal transcortation elements thatlimij and/or mijiaate identified conflicts between the orooertv and adjacent uses. Mitiaation of off-site imoacts. Potential off-site imoacts indudina. but not limited to noise.. utility caoacitv and traffic. have been identified and mitiaated. fFarrinaton: There are some obiective standards that can be linked to noise and utilitvltraffie caoacitv. but "shadina" and "alare" are subjective and should not be aooroval emeria - at least at the Master Plan level. These can and should be relevant to a soeeifie develooment oroco881 made throuah SPR. not Master Plan.l I 5.13-130 Preliminary Master Plan - Conditions J. The Aooroval Authomv may attach reasonable conditions to .ensure that the orocosed develooment.meets the crijeria of Section 5.13-125. rFarrinaton: Suaaest deletina the above lanauaae since as oroPOsed. one could "identify" an issue. have it be deemed an "imoact" and therefore lead to a soecifie condition of aooroval. Decision-makina should be based ucon - { Deleted: the ohased { Deleted: shadinc clare Deleted: minimize identified on-site conflicts and imoads on surroundina orooerties raised dunna the DUblie hearina orocess as idefltffied by staff or 'hi!!. Code to Deleted: .!6!D...!Y..!!x 17 Date Received: CXJ Olf 06 Planner: GK . . established Code standards and criteria. not uoon an "issue...raised durina the Dublie hearina Drocess." Such an "issue" could be simDlv a NIMBY eXDression of oDoosijion to a Drooosal and not based uoon any aiven Code standard.lCertain conditions may reauire an adeauate financial auarantee in a form acceDtable to the Cijv to ensure comDliance. 1 5.13-131 Final Master Plan - Review .j Deleted, Commentary. Currently. there is no formalized "Final" Master Plan process; it's implied by past practice. This Section establishes the "Final" Master Plan review process. A Final Master Plan aDDlication shall be reviewed under Tvce I Drocedure. However, if the Director determines the aDDlication is not in substantial comDliance with the Preliminary Master Plan aDDroval as seecified in Sections 5.n-125 and 5.n-130, the Final Master Plan shall be reviewed under Tvee II Drocedure. [Farrinaton: I remain Duzzled bv this section. While I understand and aDDrove of the Tvee I Drocedure as the default. and aaree that there should be some abilijy for bumDina ij UD to a Tvee II when needed. I don't see the rationale for takina ij to Tvee II when the aDDlication is not in comDliance with the Preliminary Master Plan aDDroval. Seems like there should be some different lanauaae that instead aives the Director the ability to review ij as a Tvee 11.1 15.13-132 Final Master Plan -Submittal Reauirements Commentary. Currently there is no time line for Final Master Plan submittal. The one year time line is the same as the current Partition Plat submittal time line. Additionally, there is a time line extension similar to the current Partition Plat submittal process because of the complexity of most Master Plan applications. The Final Master Plan submittal packet is also described. A. Within one year of Preliminary Master Plan ADDroval. the aDDlicant shall submij the Final Master Plan. The Final Master Plan shall incoroorate all ADDroval Authority condijions of aDDroval. The Final Master Plan aDDlication shall indude: 1. A narrative that lists the condijions of aDDroval. eXDlains how each condition is met and references the aDPlicable Preliminary Master Plan maps. diaarams or Dlan sheets that reauire revision: 2. The seecifie maDS. diaarams. Dlan sheets or other documents that reauire revision or demonstrate conformance with the Preliminary Master Plan aDDroval: and 3. Anv other information that may be reauired bv the Director. EXCEPTION: The aDPlicant may reauest an extension of the Final Master Plan submittal for UD to one additional year. The aoolicant shall submit the reauest for extension in writina to the Director no later than 30 days prior to the exoiration of the Preliminary Master Plan AODroval. The aoplicant shall exolain why the reauest is necessary and demonstrate how the Final Master Plan application will be submitted within the requested extension time line. The Director may ara"! or amend the extension request uoon determinina that the aoolicant is makina proaress on the Final Master Plan aDDlication. Commentary. Requiring the Pre-Submittal Meeting application will allow stalfto evaluate the Final Masler Plan application for completeness, prior to formal submittal by the applicant. 18 Date Received: 0 I 0'1 06 Planner: GK . . B. A Pre-Submittal Meetina applicatipn. as soecified in Section 5.1-120.C.. is reQuired prior to the fonnal submittal of the Final Master Plan application. 15.13-133 Final Master Plan -Criteria. Recordation and Effective Date Commentary. There are two criteria for Final Master Plan approval. A. Criteria. The Approval Authority shall arant Final Master Plan approval ucon findina that: 1. The Final Master Plan substantiallv confonns to the provisions of the Preliminarv Master Plan approval: and 2. All approval conditions have been met or can be auaranteed to be met. Commentary. Staff is aware of the casl and difficulty of recording the Final Master Plan as the regulations are currently written. The recordation of a Memorandum of Final Master Plan approval will reduce costs to the applicant. B. Recordation. The applicant shall record a Memorandum of Final Master Plan approval in a fonnat approved bv the City Attornev and any other required documents at Lane County Deeds and Records and retum a recorded copv of Jhe Memorandum of Final Master Plan approval IFarrinaton: Suaaest deletina "all applicable documents" since the intent is to return a recorded copv of the reauired Memorandum. and not to record the entire record of the Master Plan. which one could interepret is what is reauired to suffice as "all applicable documents.1 to the Development Services Department. ( Deleted: all aoolicable documents C. Effective Date. 1. Final Master Plan approval is effective on the date of recordation for not more than 7 years. unless modified as soecified in Section 5.13-135. Commentary. Currently. there is no language regarding an "end time" for Final Master Plan approval. 2. The Final Master Plan remains in effect until the pennitted development has been constructed or the plan is modified. superseded or expires. D. Once the Final Master Plan is approved. all persons and parties. and their successors. heirs or assians. who have or will have any interest in the real property within the Final Master Plan boundarv. shall be bound bv the tenns and conditions of approval of the Final Master Plan and the provisions of this Section. I 5.13-134 Final Master Plan - Phasina Implementation Commentary. Subsection A. is from current Section 5.13-140. A. The Final Master Plan shall be the basis for the evaluation of all phases of proposed development. indudina Subdivision or Site Plan Review applications. Commentary. A Pre-Submittal Meeting application is currently required for atl Subdivision and Site Plan Review app#cations. This is not another layer of staff review. However, it is necessary 19 Date Received: OC( Olf 0 G Planner: GK . . to determine Master Plan compliance and which Master Plan conditions of approval apply to a particular development phase. Not all approval conditions may apply to a particular phase. B. Each Subdivision or Srte Plan Review aoolication that imolements any ohase of the aooroved Final Master Plan shall be reviewed for comoliance with the followino criteria durino the Pre-Submittal Meetino aoolication Drocess as soecified in Section 5.1-120.C.: 1. Final Master Plan aooroval and: 2. The soecific Final Master Plan conditions of aODroval that aooly to the Drooosed aDDlication. I 5.13-135 Final Master Plan - Modifications Commentary. This Section specifically states that modifications are made to the -Final" Master ptan. The three current review categories remain. However, Subsection D. is added to tist those modifications for which no planning review ;s required. A Drooosed Final Master Plan modification shall be orocessed under the aoolicable orocedures described below: A. The followinQ modifications to a Final Master Plan shall be orocessed under Tyoe I orocedure. These modifications indude a reouest: 1. By the aoolicant for a chanQe of scheduled ohasinQ beyond the aooroved time limit for the ohased develooment when the orooosed chanoe affects the construction of scheduled oublic imorovements: IFarrinoton: If an aoolicant oroooses a chanoe of ohasinQ WITHIN the aooroved time Iimrts. rather than "beyond" - then I'd suooest that rt NOT be reouired to 00 throuoh a Tyoe I aooroval. if the orooosed chanoe does NOT affect the construction of scheduled oublie imorovements. lanouaoe such as this should be added to Subsection D below.l 2. By the City based on the reouirement to imolement newly adooted State or Federal reaulatlons: 3. By the aoolicant for a one time extension of the aooroved time Iimrt for uo to 3 years. An extension reouest shall be filed in writino with the Director at least 60 days orior to the exoiration of the initial 7 year cariod. If the aoolicant has made reasonable orooress in the imolementation of the Final Master Plan and oublie services and oublie facilities remain available. the time line extension will be oranted: or 4. By the aoolicant for other modifications to the aooroved Final Master Plan that the Director determines to be similar in scoca to the modifications soecified in this Subsection and/or those modifications listed in Subsection B. _ TFamnaton: Suaaest that the numerical threshold be deleted. and instead retain existino lanouaoe in 5.13-135A. B.8 and C.6.1 j Deleted: ~k>w~ s="," the I 10 oercent threshok:ls snedfiM Commentary. This Subsection is based upon current text and adds specific thresholds in certain situations. The level of review is reduced to a Type /I or Type 11/ procedure to be consistent with the level of review for the Preliminary Master Plan application. 20 ot? Oa oc Date Received: 7 7 u Planner: GK . . B. The followino modifications to the Final Master Plan shall be processed under Type II procedurefFarrinoton: Suooest deletino this phrase since there is no definijion for 'potential impacts' or 'other properties" Suooest that existino Code lanouaoe be retained essentially intact.l. .These modifications include a re~uest: 1. By the applicant for a chanoe of density allocation within'tfle density ranoe fFarrinoton: I know this phrase 'density allocation.... is in the existino Code. but I'm not certain what ij means. Please clarify here andlor define in Code.] allowed in the applicable zonino district: 2. By the applicant or Cijy for a chanoe to the size, location or capacity of public facilities: 3. By the applicant to aller sionificant natural resources, wetlands, riparian area, open space areas. archaeolooic and historic features beyond the scope of the approved Final Master Plan: IFarrinoton: As noted above. suooest retainino existino Code lanouaoe rather than a strict numerical standard.l u 6. By the applicant for a Zonino Map amendment or Discretionary Use application: 7. By the applicant toJFarrinoton: Suooest deletino the word 're-alion' as there could be beneficial reasons to aller a road alionment that should not require a Master Plan amendment.1 chanoe the tunclional classification of arterial. collector or local streets: . [Farrinoton: As elsewhere. suooestthat existino Code lanouaoe be retained. rather than developinQ a new numerical threshold.l 9. By the City or the apPlicant when essential public infrastructure cannot be provide<J: ': 10. By the applicant for extension of the Final Master Plan time limit beyond the maximum approved time limit of 7 years or the extension pennilted in Subsection 6.3.. above. In no case shall the extension exceed 15 years from the date of Final Master Plan approval as specified in Subsection 5.13-133.C. An extension reouest shall be filed in writino with the Director at least 60 days prior to the expiration of the initial 7 year period or any subsequently approved extensions. The time line extension will be oranted provided the applicant has made reasonable prooress in the implementation of the Final Master Plan and public services and facilities remain available: 11. By the applicant for a chanoe to the approved Final Master Plan boundary; . [Farrinoton: Specific buildino footprints may vary. and should be allowed to be allered throuah a Tvoe I orocedure - at most.l: or 13. By the applicant for other modifications to the approved Final Master Plan that the Director detennines to be similar in scope to the modifications specified in this Subsection. Commentary. A possible limitation on the number of modifications is proposed. 21 Deleted: . unless the Director detennines that the crooosed modif.::ation may have ootential imoacts on DUblie: facilities and/or other orooerties Deleted: In this case the Director shall raise the review level to a T .,.De III orocedure Deleted: .. 8v the aoDlicam for 10 oercent or oreater increases in thA overall commertial industrial or DUblic floor area or the number of dwelIinounits"'11 , 5. _ Bv the Booliesnt for increases or decreases in the amount 0( 800mvM or recuired oarkino bv a factor of 10 oercent or creater The aoolicant shall orovide a new oarlUna analvsis related to the orooosal; Deloted: , Deleted: ~ Deleted: 8 Bv the aoolicant for orooosals that would increase the number of PM oeak-hour vehicular trios by 10 oercent or more eXCE!!otin cases where a trio cao has been imoosed on develooment oflMe orooertv Where such a trio cao is in effect a modifICation of the land use decision that imoosed the trio can shall be reauired In all cases the aoolicant shall orovide a TraffIc Imoact AnalYsis suooortina the ~ Deloted: ~ 1 Deleted: ~~~. a:,:eantfO< a I chanae In location of a DnmaN - Date Received: or:; 0'( 0'0 Planner: GK . . 14. Uoon the submittal of any modification within this cateQOry. ilthe Director determines that previous modifications and the prooosed modification sianificantlv impact the approved Final Master Plan. the applicant may be reQuired to subm~ a new Master Plan aoolication. Commentary. Criteria are established for modifications. C. For all Final Master Plan modification applications submitted in Subsections A and B. above. the applicant shall demonstrate that the prooosed modification complies with the followina: 1. Anv applicable Preliminary Master Plan criteria of approval specified in Section 5.13-125: and 2. Anv other applicable standard of this Code that may be reQuired to iustify the prooosed modification. Commentary. This Subsection adds specific situations where additional Planning review of Final Master Plan modifications is not necessary. D. The followina modifications to the Final Master Plan do not reauire subseauent land use review and are allowed uoon issuance of a buildina permit. if reQuired: 1. Buildina interior imorovements: 2. Exterior improvements associated with existina buildinas that do not involve an expansion of floor area. subiect to all applicable base zone development and desian standards and relevant conditions of approval as approved in the Final Master Plan: 3. Installation of new mechanical or electrical eQuipment. or modification of existina eQuipment. subiect to all applicable base zone development and desian standards and relevant conditions of approval as approved in the Final Master Plan: 4. Routine maintenance of existina buildinas. facilities and landscapina: and/or 5. Bv the applicant for other modifications to the approved Final Master Plan that the Director determines to be similar in scope to the modifications specified in this Subsection. 15.13-140 Final Master Plan -Assurance to the Applicant and City Disclaimers Commentary. The specific intent of this assurance is to protect the applicant from "new" development standards for the first 7 year time line granted upon Final Master Plan approval and one 3 year extension for a total of 10 years. Final MasterPlan time line extensions that are more than 10 years, and up to /he 15 year maximum would be under regulations in effect at the time of submittal of this additional time line extension. A. Assurances to the applicant: 22 udll:: RCCCIVeU: o'1'Ot.fotfJ Planner: GK -~ . . 1. The aoolicant is entitled to relv on land use reaulations in effect on the date the Master Plan aoolication was submitted. in accordance with ORS 227.178(3) for the 7 vear aoproval time limit. with a sino Ie 3 vear extension. or as otherwise previouslv approved. [Farrinoton: the applicants of orior approved Master Plans should be assured that their aoorovals are vested for the timelines established as aooroved.l. EXCEPTION: Anv time line extension ProDOsed for more than a combined total of 10 vears shall complvwith land use reoulations in effect at the time of the time line extension aoplication submittal soecified in Subsection 5.13-135.C.10. 2. The apolicant shall have the rioht to proceed with development as lone as it is in substantial comoliance with the Final Master Plan and other required aoorovals and oermits. subiect to anv modifications as mav be aoproved as specified in Section 5.13-135. Commentary. These Subsections appear in other Sections of the current SOC. B. City Disciaimers: 1. The City shall not be re~uired to approve develooment of anv ohase described in the Final Master Plan if the approval violates aoolicable Federal or State statues or administrative rules. 2. The City shall not be oblioated to provide public imorovements affectino imolementation of the Final Master Plan if public funds are not available. 23 Uate Received: O'<:?' Of oa Planner: GK