HomeMy WebLinkAboutPermit Building 1985-1-14
--.';; RESlnAlTIAl..
"0 .' APPLIC~ipERMIT ' ,
225 North 5th Street
,Springfield~ Oregon 97477,'
Building Division
726-3753
Job Location: -5 1/5 ;C ij ~
ASlJessors Map # 17..i?2. ~3.. ~2
Subdivision:
T= Lot #t:::'/t::R::7t::J
~er: ~M-cfl ~
Address: 'c2/SS ~ J 1-:'
City: Eu-~..
u
I N~'
~ditien
3L(~ - y}D I
Phone: ~ ~ 7- Of) L/ '3
zip: q 7 '10 I
Describe Il'0rk:
Rece-:.pt II
fotf//a'
(jcl
;'dofw1-'. ~~vf/~~tU~ /,
AA~; .. f~~J~, ~1/
, ~.'. ,'oA'
;2,770,
Remodel
Nobile Home
Date of Applicatien
Contractors
_.~-
General
Plumbing ,
Electrical
MechanicaZ
Construction Lender ' ,
~-"-5
~
'Value
Add:r>ess
oFf / I -
) /1'-1/ irS
Signed:
Date:
"
Lisc.!!
Expires
Phone
~ \'jJ.~tJ [u,r, ";ti~><</q(){)
Your city' Desigr4ted Job Number Is:
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ar~
, ',.' required vapor barriers are in place
, ' "but beforecmy lath, gypsum beard or
wall covering is applied, and before
cmy insulation is concealed.
~
DRYWALL INSPECTION: Te' be made
after all d:r>ywall is in place,
but prior to any taping.
8/Z7.-Ig5
It is the responsibility of the permit hoLdeI' to see that all inspections are made at the propel' time, that each ~ess is readabLe
f1'011l the .street, and that, the permi tcard is Zocated at the front of the property.
*Bui!ding Division approved plan ~hall remain on the Building Site at all times.
PROCEDURE FOR INSPECTION REQUEST:.CALL 726-3769 (recorder) state your City designated job number,
requested ar.d when you will be ready for inspection, Contractors or Owners =me and phone number.
..>ill be made the same day, requests made after 7:00 am will 'be made the next :,Jorking day.
D MASONRY: Steel location, bond
. beams, grouting or verticals in
accordance with U.B.C. Section
2415.
0, ; UNDERFLOOR PLUMBING & MECHANICAL:, " ! '0' . WOODSTOVE: After installation is
To be made prior to installation of" cempleted.
floor insulation or decking. ' ~,""
\\","\
O POST AND BEAM: To be made prior to' D
installatien of floor insulation or .
rking. .
I. A ROUGH PLUMBIlIG. ELECTRICAL & MECH-
~ ANICAL: No work is ~o be covered
until these inspections hqve been
made and approved. '
D FIREPLACE:. - Prior to placir.g facing'
~m~~~~ials and,before framing ~nspec~
FRAMING: Must be requested after D
approval of rough plwnbing, electri-
,aal & mechanical. All roofing
bracing & chimneys, etc. Trr.lst be
,'comp leted. !lo work is to be con-
,.-,.",'cealed until this inspection has
,~been made and approved. ' .
Reouiped TnsD~cticnR
SITE INSPECTION: To be made
excavation, but prior to set
, forms.
o
o
after'
up of
UNDERSLAB PLUMBING. ELECTRICAL &
'MECHANICAL: To be made before any ,
work is covered.
//
I .A FOO. TING& FOUNDATION: To be made
~ after trenches are excavated and
, forms are erected, '.,but prior to .
pouring cencrete.
D- UNDERGROUND PLUMBING, SEWER. WATER.
! - DRAINAGE: To be mad~ prior- to fil-
ling trenches.
lo FINAL PLUMBIllG
1 ".
Ii ""'" FINAL ME::HANICAL
I~LJ...
I .
1 FINAL ELECTRICAL
i
j
!D!
"
!
CURB & APPROACH APRON: After forms
are erected but prior to. pouring
concrete.
o
SIDEWALK & DRn'EWAY: For all con-
crete paving within street right-
of-way, to be made after all exca-
,vating complete & form work & sub-
base material in place,.,
job address, type of inspection
Requests received before 7:00 ~
g</o 90 g
DEMOLITION OR MOVED BUILDINGS
~ Sani tary se'uJer capped at p:..opert-d lir.e
~ Septic tank pumped and filled with gra~el
I Final - I{hen above items are completed
~ and when demolition is complete or struc-
ture moved and premises cleaned up.
I Mobi le Hemes
~ Blocking and Set-up
~ Plumbing connections sewer and water
~ Electrical Connection - Blocking, set-up
~ and plwnbing connections nT.lst be approved
before requesting electrical inspection
:=J Accessory Bui lding
~ Final - After porches, skirting, decks,
~ etc. are completed.
o
All project conditions, such as the instailation of street trees, cO"pletion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
. FV PINAL BUILDING: The Pinal Building Inspection must be requested after the Final Plwnbing
~. Electrical, and Mechar.ical Inspections have been made and approved.
PENCE: ...'hen complete -- Provide',
gates or movable sections through
P.U.E. .
o
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTNENT TO BE ftL1DE AT NO COST TO CITY I Page 1 of 2
I JOB NO. ?5409&X
Zone:
Lot. Sq" Ftg.
Z of lot Coverag~
# of Stories
TotaL Height
Topography
I
lITEM
I Main
I Garac;e
I Carport
I Accessorl./
I
I
Is.D.c.
I SQ. FTG
I
I
1+34-
I
I
TOTAL VALUE
(vatueJ
1.5 x
Building Pe!'l7'lit
State Su:t'cha:1'ge
Total Charges
lITEM NO.
I Futures
\1 Residential (1 batnJ
'~S~itary Sewer
I Water
Plwnbing Perrr:i t
State Su:t'cr.a:1'ge
Total Charaes
ITEM Nd.
Res. Sa. fta.
I N8W/Extend Circui ts I I
I Tempora:1'Y Service I
I
ELeotrical Permit
State Su:t'oha:t:>qe
Total Cha:t>qes
lITEM'
I Furnace ETU' S
I Exhaust Hood
rvent Fan
Woodstove
Pe!'l7'lit Issuance
Meohanioal Pe!'l7'lit
State '.Su:t'oharac
Total Charaes
I -- ENCROACHMENT --
ISe~dritl./ Deposit
I Storage
I Maintenarwe
I Permit
Total Charqes
Cla'bcu t
Sidewalk
Fen:.:e
I Eleotrioal Label
Mobile Home
TOTAL AMOUNT DUE: *
I NO.
I
I
I
I
I
SOLAR SESS
Oocupanol./ Gr
LOTTYFE
Interior
Corner
Panhandle
Cul-de-sao
x Value
,
I S~ ..z. ;$ ~
I
I
*
24!i
/;/P
2.1- 9(, *
FEE CHARGE
FEE
I
I
I
I
I
I
I'
CHARGE
10 ~O
10 ~()
,.fO
FEE
CHARGE ' i
It) ~ I
I
I
I
I
/000
.1-0
I
I
I
I
I
I
I
I
I
I
JI~
r(1ge ;;
REQ.-
L- CO G~
.
Type/Const:
Bedrooms:
Enera}< Sources
Heat
Water Heater
Range
, Fireplace
Woodstove
TUDe
I Lot Faces -
I Setbacks
I P. L. House Garage
INorth
East
South
IWest
.:.- Fees
I
I
Aooess. I I
I
I
. I
1.1
.' I
Building Value ~,.& -Perin i.t.
This pe!'l7'lit is granted on the express oondition that the said,oonstruction
shall, in all respeots, oonform to the Ordinanoe adopted by the City of
Springfield, in07.uding the Zoning Ordinanoe, regulating the oonstruetion
and use,of buildings, and may be suspended or revoked at any time upon vio-
~tion of any provisions of said Ordinanoes.
#.,.,. .
" "
Plan Cheok Fee: .;t; J;).. (fQ
Date Paid: 12..' Z ~ - 'ij'-'
Reodpt #: r36l./os(o
I Signed: ,J-<:-,
Plumbing Permit
I
I
I
I
I
I
, *
I
I
I
I
I
I
I
I *
No person shall oonstruct, install, alter or ohange any new or existing
plwnbing or drainage system in whole or in part, unless suoh person is the
legal possessor of a valid plwnber's lioense, exoept that a person may do
plwnbing work to property whioh is owned, leased or operated by the appli-
cant.
..;~.\: It
+-
Electrical Permi t
.Where State Law requires tr~t the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the ~bel has been signed by the Electrical Contractor.
Mechanical Permit
I
I *
I
I
I
"
I
t
I
~~_4-"~j ':'
'L:?-ar
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d all work performed shall be done in aceor-
dance with the Ordinances of the City of Springfield, and thz L~~s of the
* State of Oregan pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only eontractors ~ad e~ployees who are in
compliance with DRS 701.055 will be used on this project
I
I
I /i:J~~~
rlh *11 -1:;::; j/ I
I-/'I-~~-
Date