HomeMy WebLinkAboutPermit Mechanical 1989-10-9
.. RESIDMlTIAL"
APPLICA~/PERMIT
225 North 5th Street
Springfield~ Oregon 9?4??
Building Division
726-3?53
tf8?~ 1'6;1 ',straY'
11" D2- - ~2- ,.. Lf.l Tax Lot # f)():J.87
--
Job Location:
Assessors Map #
Subdivision:
Ol.Jner:
f)lK:it_
4r1~
~i c. L
~" 5t I
Add:ress:
Ci ty :
I New
I Addition
I Remodel
I Nobile Home
Phone:
1J-fu -- Bot.,f
Zip:
Describe rl'ork:
'fVU--'~S~rv1.. ~
'CL u.TfTOd f I-rrzK:- t11 >eA.i-
> Rece:ipt fI.
/50'/0
v
Signed:
~- ,/
. I () "''1- () q
,
/0"'1- 70; ,
Value /{~
,
Bldrs Board Reg.
Date of Application
Contractors
General
Plumbing
IH~chanical
I E~e. ct. rical
StlP~rv2:'Si.ng }~~..ec t r ic ia n
Address
,Lise. 11
Date:
Expires P~one
It is the responsibility of the permit haUler to see that all inspections are made at the proper time, that'each ~ess is readabZe
f:zoom the street, and that the perrrrit card is located at the front of the property.
*Bui!ding Division approved plan shall remain on the Building Site at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state your City designated job number, job' add:Pess, type of inspection
requested ar.d when you wi! l be ready for inspection, Contractors or Owners name and phone number. Requests received before 7: 00 ar:I
:.ri ZZ be made the same day, requests made after 7: 00 am wi II be made the next working day.
I 'f~(li'!i,lldlll11 I
Reauir~d Tnsvecticns
D' SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
~ UNDERSLAB ?LUMBING. ELECTRICAL &
-.l ' MECHANICAL: To be made before any
, work is covered.
o
FOOTING & POUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concret.z.
o
UNDERGROUND PLUMBING. SEWER. W,1TER,
DRAINAGE: '1'0 be made prior to fiZ-
Ur.g trenc;!es.
0, UNDERFLOOR PLU!,fBING & MECHANICAL:
. , 'To be made prior to instaUation of
j100r insuZation 01' decking.
POST AND BEAM: To be made prior to
installation of j100r insulation 01'
decking.
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be covered
,until these inspections have beer.
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
D FRAl1ING: fmst be requested after
approval of rough plumbing, electri-
cal & mecJumicaL AU, roofing
bracing & chimneys, et~. nr~st be
,:'completed. No work is to be con-
.;'" ,:cealed un{~l this inspection has
:,~,been made and approved.
ID
D
D
'I"'"
,~'.- ~
Your City' Desigr.ated' Job Number 'Is': ,
, :
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after aU insulation and
required vapor barriers are in place
, "but before any lath, gypsum board or
waU covering is applied, and before
',any insulation is concealed.
D
DRYWALL INSPECTION: To be made
after a lZ d:Pywa U is in place,
but prior to any taping.
MASONRY: Steel location, bond
beams, grouting 01' verticals in
accordance with U.B.C. Section
2415.
f::9/l) 1 Lf
DEMOLITION OR MOVED l}UILDINGS
:J Sanitary se'.Jer ~apped at 'p~operty Ur.e
~ Septi~ tank pwnped and filled withgra:Jel
I,Final - r"hen above items are completed
~ and when demolition is complete 01' st1'U~-
ture moved and premises oleaned up.
,1
, Mobi le Homes I
=:J Biocking and Set-up
=:J Plumbing connections SeLJer and water
~ Electrical Connection - Blocking, set-up
~ and plumbing connections nr~st be approved
before requesting electrioal inspeation
:=J Acoessory Bui lding
I Final - After porches, skirting, decks,
~ etc. are completed.
o
All project conditions, such as the i,nstalZation of stl'eet trees, co.'71pletion of the
requil'ed landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
o FINAL PLUMBING
o FINAL ME(;HANICAL
o FINAL ELECTRICAL
o
o
D
WOODSTOVE:
acmpleted.
After installation is
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbing
Electrical, and Mechanical Inspections have been made and approved.
~, \,
. 'j
D
CURB & APPROACH APRON: After' forms
are ereoted but prior to pouring
{!oncrete.
\ ,
*A['[, MANHOLES AND CLEANOUTS MUST BE ACCESSIBLF:, ADJUSTNENT TO BE M.~DF: i1T NO rOST TO CITY P'1~7e J of 2
o
SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
pf-way, to be made after all exca-
vating complete & form work & Bub-
, base material in pla~e.
D 'PENCE: ~'hen complete :.- Provide'
gates or movable sections through
P.U.E.
o
\ .
REQ.-
L-COG~
Zone:
SOLARA~SS
Ocaupancy Gr"
LOT TYPE
Type/Const:
"
Bedrooms:
JOB NO.
Lot Sq. Ftg.
~ of lot CoveragG:
# of Stories
Total Height
Topography
. i
lITEM
I Main
I Ca:f'aae
I CarIJort,
I Accessorzi
SQ.FTG
Is.D.c.
TOTAL VAWE
(vatueJ
1.5 x
Building Permit
State Sur>chmoge
Total Charges
lITEM NO.
I Pi:z:tur>es
I Residential (.1 bath)
I Sanitar.lj Sewer
Water
Plumbing Permit
State Sur>cr.arge
Total Charoes
ITEM
I NO. 'FEE
Res. So; fto.
[New/Extend Circuits
I Tempormoy Se1'Vice
,J . \ I
I I
Electrical Permit
State Sur>chal'qe
Total Charges
lITEM
NO.
Furnace ETU' S
Exhaust Hood I
I Vent FCUl l I
I Woodstove I I
I I I
Permit IssuCUlce.
Mechanical Permit
'State Sur>charoe
Total Charaes
-- ENCROACHMENT --
Se~~rit~ DeIJosit
Storage
I Maintenanae
I Permit
Total Charaes
I CurbcUt
I Sidewa lk
I Fence
Electrical Label
Mobile Home
-fN~ ~ lA1~/2.f~,fj /JY1
TOTAL AMOUNT DUE: ~
'''',~
"
'\,..1
X r
I
I
I
FEE
I
I
FEE
Interior
Corner
Panhandle
Cul-de-saC]
Value,
I
CHARGE
I'
CHARGE
,I'
, I
I
I
I
CHARCE
I
I
I
I
/
I
I
1/5100
I '
I Lot Faces -
I Setbacks
I P.L. House Carage
North
East
South
IWest
Access.
I
I
I I
II
I J
Energy Sources
Heat
Water Heater
Range
Fireplace
Woods.tove
Tlme
Fees
BuildingVcllue & Permit
This permit is granted on the express condition that the sa,:d construction
shall, in all respects, conform to the Ordinance adopted by the City of,
Spr.ingfield, iricZuding the Zoning Ordinance, regulating'the construction
and use of buildings, and may be suspended or revoked at any time upon vio~
Zation of any provisions of said Ordinances. " '. '
.....
.I
~
I
I
I ~
IPlan Check Fee:
Date Paid:
Receipt #:
I Signed:
,f
I
Plumbing Permit
No person shaZZ,'construct, instdlZ, a~ter or change any nelJ Dr existing
p lwnbing or.' drainage sys te,71 in \Jho le or "in pai't, udes s such person is the
legal possessor of a valid,plumber's license, except that a person may do
plumbing work to property which is owned, leased or operatea by the appli-
cant.
I
I
I *
Electrical Permit
Where State Law requires tr.at the electrical work be done by an Electrical
Contractor, the electrical portion of this.permit shall not be valid until
the label has been signed by the Electrical Contractor.
I ~
Mechanical Permit
~
Plan Examiner
Uate
I HA VECAREFULLY EXAMINED the comp Zeted app lication for permi t, and do
hereby certify that all information hereon is true and correct, and i
further certify that any ar.d all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and th~ L~~s of the
~ State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contractors and enployees who are in
compliance with ORS ?Ol.055 will be used on this project
~
?r! fvo ,(\ ~J, 'A :i. ~;'l .
Signed ~
Date
I ~ - ,- 01