HomeMy WebLinkAboutCorrespondence SUB 5/13/2009
.
.
Note To File:
McDougall R Repair & Service, 244 391 Street
Amy Chinitz, SUB Water Quality Protection Coordinator
By:
Date:
May 12, 2009
Subject:
Site Visit
Randy McDougall: 726-6645
I visited Randy McDougall's repair shop today to determine what kind of conditions will
need to be attached to his DWP exemption.
My observations:
. Many chemical product containers and boxes in very old and/or poor condition;
. Chlorinated Brakleen on shelves;
. Randy said he uses his chemicals inside only.
Randy's to-do items:
. Remove all chlorinated Brakleen;
. Provide MSDS for products used in shop and for retail sale so Amy can review and
,
determine if other DNAPLs (potential DNAPLs in carburetor cleaner);
. Obtain boom or other the equivalent to protect outside French drain in case of spill; .
. Obtain mats for covering the two new catch basins he plans to install as part of his
stormwater upgrade project;
. Place WHP sign at front of building;
. Provide secondary containment for all items on shelves; and
. Perform general cleanup to consolidate loose products scattered around and
improve storage conditions.
I told Randy I would send him a copy of the City of Springfield fish-friendly BMP list
(rrcinc1002@qwestoffice.net). .
Date Recei ed:
Planner: SH
0-1"7.ZCO~
I:\APPS\Site Revi.ew Final\R repair\2009-05-12_Site Visit McDougall Repair.doc