HomeMy WebLinkAboutComments SUB 3/30/2009
aQIJ
.
.
SPRINGFIELD UTILITY BOARD
I
WATER SERVICE CENTER 202 South 18th Street Springfield, OR 97477-5240 Tel 541.726.2396 Fax 541.747.7348 www.subuti1.com
March 30, 2009
Lissa Davis
City of Springfield
225 N. 5th Street
Springfield, OR 97477
Dear Lissa:
SUBJECT:
SITE PLAN TENT A TNE #DRC2009-00008 McDOUGALD / R REPAIR & SERVICE
Tax Map 17-02-31-41, Tax Lot 2000, 244 39th Street
This development calls for no change in the water service. If it is decided later a change in service is
needed, then listed below are our comments for the above referenced developIhent proposal:
I. The proposed development is within the Springfield city limits and clentlY receives water
service from the Springfield Utility Board (SUB). I
2. All new water system facilities and modifications to water system facjlities both.inside;and.
adjacent to the proposed development shall be placed in stre~t right-of,way.ata'location and"
depth ofh,~ry that :neetscthe st~ndards ofth~ SUB Water Division. I .
3. All water facility materials shall be to a standard that must meet SUB Water Division
specifications.
4.
All workmanship shall be performed to meet or exceed SUB Water Division construction
standards. . I
Size of waterline and other facilities, including water meters, must meet the needs of the SUB
Water Division and the long-range needs of the City. These needs indlude, but are not limited to,
meter location and access, sizes of water distribution and transmissiori lines, pumping facilities,
and communication lines.
5.
Please ask the developer to contact the SUB Water Division for detailed information on the
,
materials and construction standards, detailed costs for installing SUB water facilities, and a
,
schedule of construction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities installation, and joint trench bpportunities.
All water meters w!ll be placed In public nght-of-way at a location idlnlIfied by the developer.
Each lot ~r parcel must have its own water servIce. . I .
Water servIce fac!lllIes will be installed upon colleclIon of development charges:: Development
. ,
policies and charges identified in this letter are subject to change. Actual charges.will be those in
effect at the time water service is requested., I. . . \" ~
S:\SITEPLAN\244 39th Streel sile plan lentative 3-30-09.docx Dat~ ,ReceiVed; '3 ~ 09
Planner: lJ) ~ ~
l 00 '2.-
6.
7.
8.
/
.
.
9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water
comes from wells. In every instance, care shall betaken to prevent groundwater contamination.
Contractors/developers/owners shall be responsible for the safe handlihg and storage of
chemicals, petroleum products, fertilizers, and the prevention of grouridwater and storm water
runoff contamination. I
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396.
PLEASE NOTE: SUB development charges are paid directly t1 SUB Water Division and
SUB Electric Division. .
Sincerely,
Rebecca Templin, P.E.
Water Engineering Supervisor - Water Division
RAT:mt
cc: Randy McDougall, R. Repair & Service, 244 39th Street, Springfield, Oregon 97478
,
Scott Morris, P.E., Olson & Morris, 380 Q Street, Suite 200, Springfield, Oregon 97477
Matt Koehler, L.A., 1554 Larkspur Loop, Eugene, Oregon 97401
Date ~ecejved: "3 \ 3D I cPI .
Planner: (J) ~ ~
~7.,