SPRINGFIELD UTILITY BOARD
WATE R S ERVICF. CEI\'TE R 202 South 18th Street Springfield, OR 97477-5240 Tel 541.726.2396 Fax '541.747.7348 www.subutil.com
Andy Limbird
City of Springfield
225 N. 5'th Street
Springfield, OR 97477
Dear Andy:
SUBJECT:
SITE REVIEW TENTATIVE #DRC2008-00025 EAST & WEST COAST AUra
Tax Map 17-02-32-32, Tax lot 300, 42"d Street & Smith Way / Commercial Avenue
Listed below are our comments for the above referenced development proposal:
I. There is a waterline located in a waterline easement along 42"d Street right-of-way. The plans
show a vegetated swale over our waterline. As long as a minimum of 30" of cover is maintained
over our water line, we have no issue with the swale being located on top of our line.
2. The proposed development is within the Springfield city limits and will receive water service
from the Spri~gfield Utility Bo'aid (SUB):" ." .'i- ",. . . . . .
3. All'~ew'~~t~r syst~m facilitie~ and modifications to water system facilities both-inside and
adjacent to the proposed development shall be placed in street right-of-way at a location and
depth of bury that meets the standards of the SUB Water Division.
4. All water facility materials shall be to a standard that must meet SUB Water Division
specifications.
5. All workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
6. Size of waterline and other facilities, including water meters, must meet the needs ofthe SUB
Water Division and the long-range needs of the City. These needs include, but are not limited to,
meter location and access, sizes of water distribution and transmission lines, pumping facilities,
and communication lines.
7. Please ask the developer to contact the SUB Water Division for detailed information on the
materials and construction standards, detailed costs for installing SUB water facilities, and a
schedule of construction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities installation, and joint trench opportunities.
. I' .
8. All water meters will be placed in public right-of-way at a location identified by the developer.
Each lot or parcel must have its own water service.
S:\SITEPLAN\42nd & Smith Way site review tentative 5-5-08.docx
gate Received' S/:~"Of
Planner: AL . /
.
,
.
.
'"
9. Water service facilities will be installed upon collection of development charges. Development
policies and charges identified in this letter are subject to change. Actual charges will be those in
effect at the time water service is requested.
I O. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water
comes from wells. In every instance, care shall be taken to prevent groundwater contamination.
Contractors/developers/owners shall be responsible for the safe handling and storage of
chemicals, petroleum products, fertilizers, and the prevention of groundwater and stonn water
runoff contamination.
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396.
II. Backflow prevention' devices will be required for this service. Please contact Chuck Davis at
726-2396 prior to installing water service. Chuck can.help in the selection of the most
econ01111.cahlevlce and-location. lNater service will not be provided tmtil a backflow pl'!-n has
been submitted to SUB Water Engineering and approved for installation.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division and
SUB Electric Division.
Si"'~L
Rebecca Templin, P.E.
Water Engineering Supervisor - Water Division
RAT:mk
cc: East & West Coast Auto, 1710 West 7th Avenue, Eugene, Oregon 97402
David Nichols, Pacific West Engineering, Inc., 3610 Goodpasture Loop, Eugene, Oregon 97401
S:\SITEPLAN\42nd & Smith Way site review tentative 5.5.0S.docx
Date Received: s/~PlXlf
Planner: AL