Loading...
HomeMy WebLinkAboutCorrespondence ENG 9/3/2010 ... ...:... ,4 " . . @ Branch Engilleering, Inc. Corporate- Headquarters' (541) 746-0637 3:1.b 5~b Street Spnngfield, OR 97477 Salem ,_Engine'ering' Office (503i 7.79-25U 4319. Ch.err)i i\venueNE I,eizer, OR 97303 Principah. . M..Lane Branch. PE Damian 'Gilbe'rt. PE Renee Clough, PE, pLs, 'AICP Rene' Fabricant: PE, SE Ronald J. Demek, PE WWW.BranchEriglrieering.com September 2, 2010 Pacific Cascade Federal Credit Union, Inc, 1075 Oak St Eugene OR 97401 RE: 1507 Centennial Blvd., Springfield OR Rain Garden Operations and Maintenance Plan To Whom It May Concern: Attached is the Operations and Maintenance Plan for the rain garden that has been designed for your property. Once the rain garden is constructed it is important that you follow the procedures outlined in tlus plan to ensure the rain garden continues to provide the designed cleansing and conveyance functions, This plan needs to be distributed to all tenants on the property and included with any sales of a portion or all of the property. If there are any questions now or in the future, feel free to contact me, Sincerely, ~ Renee Clough, PE, PLS, AICP Principal Surveyor Branch Engineering, Inc. Date Received: r - '3;' It) Planner: MM CIVIL STRUCTURES TRANSPORTATION GEOTECHNICAL SURVEYING , ~ ....... . . Simplified Operations and Maintenance Specifications BASINS What To Look For What To Do Structural Components, including inlets and outlets/overflows, shall freely convey stormwater. ;.. Clogged inlets or outlets ~ Remove sediment and debris from catch basins, trench drains, curb inlets, and pipes to maintain at least 50% conveyance capacity at all times. ~ Cracked drain pipes or grates ~ Repair/sea] cracks. Replace when repair is insufficient. ;.. Check dams ~ Maintain 4- to IO-inch-deep rock check dams at ]2- to 20-foot intervals. Vegetation shall cover 90% of the facility. ;.. Dead or strained vegetation ~ Replant per original planting plan, or substitute from SWMM Appendix FA plant list. ~ Irrigate as needed. Mulch banks annually. DO NOT apply fertilizers, herbicides, or pesticides. ;.. Tall grass and vegetation ;.. Cut back grass and prune overgrowth 1-2 times a year. ~ Weeds ~ Manuallv remove weeds. Remove all Dlant debris. GrowingIFilter Medium, including soil and gravels, shall sustain healthy plant cover and infiltrate within 48 hours. ~ Gullies ;.. Fill, lightly compact, and install plant vegetation to disperse flow. ~ Erosion ;.. Replace splash blocks or inlet gravel/rock. ;.. Slope slippage ;.. Stabilize 3:] slopeslbanks with plantings from SWMM Appendix FA. ;.. Pondin~ ;.. Rake, till, or amend to restore infiltration rate. Maintenance Schedule: Slimmer. Make any structural repairs. Improve filter medium as needed. Clear drain. Irrigate as needed. Fall. Replant exposed soil and replace dead plants. Remove sediment and plant debris. Winler. Monitor infiltration/flow-through rates. Clear inlets and outlets/overflows to maintain conveyance. Spring. Remove sediment and plant debris. Replant exposed soil and replace dead plants. Mulch. A Ii seasons. Weed as necessary. Maintenance Records: Record date, description, and contractor (if applicable) for all stmctural repairs, landscape maintenance, and facility cleanout activities. Keep work orders and invoices on file and make avai]able upon rcquest ofthe City inspector. Access: Maintain ingress/egress, including access roads, to design standards. InnltrationlFlow Control: All facilities shall drain within 48 hours. Record time/date, weather, and site conditions when ponding occurs. Pollution Prevention: All sites shall implement best management practices to prevent hazardous or solid wastes or excessive oil and sediment from contaminating stormwater. Contact Spill Prevention & Citizen Response at 503-823- 7180 for immediate assistance responding to spills. Record time/date, weather, and site conditions if site activities contaminate stormwater. Vectors (Mosquitoes & Rodents): Stonnwater facilities shall not harbor mosquito larvae or rats that pose a threat to public health or that undermine the facility structure. Monitor standing water for small wiggling sticks perpendicular to the water's surface. Note holes/burrows in and around facilities. Call Multnomah County Vector Control at 503- 988-3464 for immediate assistance to eradicate vectors. Record time/date, weather, and site conditiolllS when vector activity observed. Chapter 3: Operations and Maintenance Portland Stormwater Management Manua/- August 1, 2008 1,,~~!D