Loading...
HomeMy WebLinkAboutComments SUB 8/6/2010 08/06/2010 14:47 FAX 7477348 WSC FAX I4J 001/002 . . 5 P R I N G F r E r.'D UTI L1 T Y BOA R D WATF.R SF.RVICF. CENTER 202 South 18th Street Springfield, OR 97477.5240 Tel 541.726.2396 Fu 541.747.7348 www.5ubutit.com August 6, 2010 Steve Hopkins City of Springfield 225 N. 5th Street Springfield, OR 97477 Dear Steve: SUBJECf: PARTITION TENTATIVE #SUB2010-00010 LIBERTY BANK/HAYDEN HOMES Tax Map 17-02-32-00, Tax Lot 2200, Tract A ofWestwind Estates (4750 Daisy Street) Listed below are our comments for the above referenced development proposal: 1. The proposed development is within the Springfield city limits and will receive water service from the Springfield Utility Board (SUB). There is a 16" waterline along the length of the north property line that is accessible to Parcel I for service and a 16" waterline stub located at the southeast comer of property and is accessible to Parcel 2. 2. All new water system facilities and modifications to water system facilities both inside and adjacent to the proposed development shall be placed in street right-of-way at a location and depth of bury that meets the standards of the SUB Water Division. 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications. 4. All workn1anship shall be performed to meet or exceed SUB Water Division construction standards. 5. Size of waterline and other facilities, including water meters, must meet the needs of the SUB Water Division and the long-range needs of the City. These needs include, but are not limited to, meter location and access, sizes of water distribution and transmission lines, pumping facilities, and communication lines. 6. Please ask the developer to contact the SUB Water Division for detailed information on the materials and construction standards, detailed costs for installing SUB water facilities, and a schedule of construction. Construction expenses may be reduced with good planning of required water facilities, good timing of facilities installation. and joint tre~ch opportunities. 7. All water meters will be placed in public right-of-way at a location identified by the developer. Each lot or parcel must have its own water service. 8. Water service facilities will be installed upon collection of development charges. Development policies and charges identified in this letter are subject to change: Actual charges will be those in effect at the time water service is requested. S:\SITEPLAN\47S0 Daisy Street (WestWind Estates) partition tentative 8-5-1 O.docx =- .6zJl2 . "ed". D cate ?,ece\ \-\ Planner: S 08/06/2010 14:47 FAX 7477348 WSC FAX @002/002 . . 9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from wells. In every instance, care. shall be taken to prevent groundwater contamination. Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination. Special requirements may be necessary for groundwater protection at this development. Contact Amy Chinitz at Springfield Utility Board Water Division for details at (541) 726-2396. 10. Backflow prevention devices will be required for this service. Please contact Scott Higley at (541) 726-2396 prior to installing water service. Scott can help in the selection ofthe most economical device and location. Water service will not be provided until a backflow plan has been submitted to SUB Water Engineering and approved for installation. PLEASE NOTE: SUB development charges are paiddirectIy to SUB Water Division and SUB Electric Division. . Sincerely, ~L Rebecca Templin, P.E. Water Engineering Supervisor - Water Division RAT:mt cc: Saul Weinstein, Liberty Bank, 355 Goodpasture Island Road, Eugene, Oregon 97401 Hayden Homes, LLC. 2622 SW Glacier Place, Suite 110, Redmond, Oregon 97756 Michael Reeder, Arnold Gallagher Percell Roberts & Potter, 800 Willamette Street, Suite 800, Eugene, Oregon 97401 S:\SITEPLAN\4750 Dai>y Street (Westwind Estates) partition tentative 8-5-10.docx . . 'D '(p - / () Date ReceIVed. Planner: SH