HomeMy WebLinkAboutNotes, Meeting PWE 5/18/2010 . .. MEMORANDUM City of Springfield DATE: May 18,2010 TO: Steve Hopkins, Urban Planner FROM: Eric Walter, Civil Engineer SUBJECT: ZON2010-000027 Larkin Partition DIM Public Works Engineering Comments The subje.ct application involves tax lot 170]. The applicant submitted plans to discuss partitioning one lot into three parcels for the construction of two duplexes. Public Works Engineering responses to the applicant's questions are as follows: Applicant's Questions: 1. What form of private road is requir!ld for the partition? Relative to SDC Section 3.2-220. Transportation and Planning Divisions will respond to this question. For clarification purposes, this will not be considered a private road but a driveway. 2. Will it be possible in tbe future to divide each of the three parcels into two parcels - one for each duplex after construction? Planning Department will respond to this question. 3. Are there any issues that would prevent construction of two duplexes on each lot after the partition is completed? Planning Department will respond to [his question. 4. After completion of the partition, will site plan review be required for the two duplexes on each parcel? If so, can the partition / site review applications run concurrently? Planning Department will respond to this question. Additional Staff Comments: a) To ensure afully functioning water quality system and meet objectives of Springfield's MS4 permit, the Springfield Development Code and the EDSPM, the proposed private vegetative water quality swale shall be shall be fully vegetated with all vegetation species established prior to approval of Final Plat. Alternatively, if this condition cannot be met, the applicant "\! sha~l provide and maintain additionalinterim erosion control/water quality measures . acceptable to the Public Works Depaflment that will suffice until such time as the swale vegetation becomesfully established Prior to approval of the partition plan, the applicant shall include a maintenance agreement document with provisions to ensure functionality of the proposed vegetative swale. b) The plans submitted does not appear to include a required sidewalkfronting 42nd St. The City Capital Project indicates this as a set-back sidewalk. Prior to approval of the partition, the applicant shall obtain a copy of the Capital Improvement Plans for 4~ St. improvements ,';ate Received: {l lJ ")-jc,s-l Planner: SH . . (P20457) and include on plans the proposed sidewalk with the required alignment matching the 4~ Sf. improvements. c) The tentative partition plan will need to include a 7' PUE along the street frontage S. 42nd Sf. for all public utilities. d) The plans will need to be completely detailed for required private utility easements for serving each lot including storm water and sanitary sewer and other utilities such as water. Separate sanitary service lines will requiredfor serving and extended to each residential lot. e) The proposed exterior trash enclosure must be roofed and hydraulically isolated. Also, the floor area shall drain to an approved sanitary sewer line. This information must be shown on plans. j) There is an existing 18" storm pipe and an existing 8" sanitary sewer pipe located in S. 4 ~ St. The applicant shall obtain necessary City encroachment permit in order to connect to the existing 8" pipe located at the westerly end of property within the 42nd St. right-ol-way. g) System Development Charges (SDC's) will be required and calculated at the time of Building Permit application submittal. \Jete Received: Planner: SH S-)~' )0 , , . .