Loading...
HomeMy WebLinkAboutMiscellaneous PLANNER 8/11/2010 ':::'" " .. '<i . . . ~-" . .~. COM M ERCIAL/IN DUSTRIAL SPRING":'IELD JOB NUMBER ?1,?a9~ ~$'t PERMIT APPLICATION I.NSPECTION LINE: 726.3769 225 Fifth Street, Springfield, Oregon 97477 OFFICE: 726-3759 LOCAT)ON OF PROPOSED WORK: rpBO r:;,.q~~/AH' ~P'E ASSESSORS MAP: /?-i':>'2 7/-/~/ TAX LOT: 6> 9'3= . .~ ;:;: ~~ - OWNER: PHONE: ADDRESS, ~~ CITY: STATE: ZIP: DESCRIPTION OF 'WORK.: NEW REMODEL ADDITION DEMOLISH OTHER VALUE: NAME ADDRESS PHONE ARCHITECT:' CaNST. CONTRACTOR'S NAME ADDRESS CONTRACTOR" EXPIRES PHONE GENEAAL: PLUMBING, ~ 6'""Yt.- ./ i ~-?/--~ 7><<7"62/ MECHANICAL~VF?:.,f~~ ~4~ ELECTRIC.AL: PLUMBING CHANICAl NO. FEE CHARGE Single Fixture Furnace/burner &. vent <100000 STUg ~~I~~I~~:~~BJ~~' / Furnace/burner & venl >100000 STUs Water Service Floor furnace and venl . ft. S~nltary Sewer Suspended wall or floor It. mounted unit healer Storm Sewer Appliance Vent ft. separate Stationary evap. Backflow Device cooler Vent Fan/Single duct Vent System apart from AC or htg. MechanJcalexhau$t hood and duct Permit Issuance $10.00 TOTAL PERMIT TOTAL PERMIT /1-,,,, /'>.- OFFICE USE - HANDICAP ACCESS: . . QUAD AREA: LAND USE: FLOOD PLAIN: " OF BlDGS; " OF UNITS: ZONING: OCCY GROUP: CONSTA. TYPE: LIGHTING POWER BUDGET: "OF STORIES: HEAT SOURCE: WATER HEATER: SQ. FT. S/SQ. FT. VALUE SQ. FTG MAl N X . SQ FTG ACCESS X = SQ. FTG OTH ER X . TOTAL VALUE OF PROJECT ~-==- -. PLAN CHECK FE!:: RCPT" DATE BY BUILDING PERMIT - PLUMBING DEMOLITION 5% Stale I:> ~~~c~~ar~ee S"CCh~ MECHA ~~ FENCE -- VALUE S 5% St:Le, .7:~ SIDEWALK SUBTOTAL . Surchar e FT. PERMITS PAVING / CURBCUT SYSTEMS' FT. DEVELOPMENT I ! TOTAL PERMIT FEES I I , -;?5:P- EXCLUDING ELECTRICAL ~ ..... IjJ ~:z: .- rn 2S \1);"; a:::Q) We _, c \O;'j..~ C~l Q. .1 t...;. . REQUIRED INSPECTIONS '" It is the responsibility of the permit holder to see that alllnspecllons are made at the proper lime. To request an inspection, call 726.3769 (recorder), state your City designated job number, Job address, type of inspection requested and when you will be ready for Inspection. Requests received belore 7:00 a.m. wilt be made the same working day, requests made after 7:00 a.m. wilt be made the following work day. SITE INSPECTION: To be made after excavatfon, but prior 10 setup of forms. UNOERSLAB PLUMBING, . ELECTRICAL & MECHANICAL: To be made before any work Is covered. FOOTINGS & FOUNDATIONS: To be made alter trenches are excavated and forms are erected, all steel In place, but prior 10 placing concrete. CONCRETE SLAB: To be made after all 1nslab building servIce equipment, conduit, piping, accessorIes and other ancillary equipment items are in place but before any concrete Is placed. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to coverJng or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prIor to Installation of floor Insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with use 2415. ROOF SHEATHING AND NAIL.ING: Prior to Installing any roof covering. ~ FINAL PLUMBING FINAL ELECTRICAL ----X--- FINAL. MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: ROUGH PlUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these Inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blockIng and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but belore any lath or gypsum board Interior wall covering Is applied. - FIRE & SEPARATION WALL: Located and constructed according to plans. LATH ANDIOR GYPSUM BOARD: To be made aHer all lathing and gypsum board, Interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and finished. SID.EWALK & DRIVEWAY: Required lor all concrete paving within street right of way, to be made alter all excavating complete and form work and sub.base material In place, CURB AND APPROACH APRONS: After forms are erected but prior to placIng concrete. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector sliall be employed by the Ownerl Contractor during construction 01 the following work. A copy of the special testing reports shall be furnished to the Building DivisIon. STRUCTURAL CONCRETE: In excess of 2500 P.S.!. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: Standards 43.8. U.B.C. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29} GW.LAM BEAMS: Inspeclion Certlflcate by an approved agency, furnished to the City's Building Division belore beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) , .In addition to the inspec- tions specifIed, the Building Official may make or require other InspecUons of any construction work to ensure compliance with the Building, City or Development Code. SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. FINAL. BUILDING: Requested after the Unat plumbing, .electrlcal, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certlflcale of Occupancy has been issued by the Building Division and posted on the premises. PLANS REVIEWED BY DATE By signature, I state and agree, that I have carefully examined the completed application and do hereby certlly that aJllnformaUon hereIn Is true and correct, and I further certify that any a.nd ali work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure wlthOut permission of the Building Safety Division. I further certIfy that only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times du"oO c stcuctlon~ (1 '" vfP~ 4 Signature d. ~ . Date h - '["'--$3 VALIDATION: .AMOUNT RECEIVED, -::?S;?f RECEIPT It:' 9~~ DATE PAID, .';:-/'5"q:y RECEIVED BY: -.; I --., ---. \ ~ ~J: "- en ~ Q)i..: o:::m me: _e: lIl..!!! f'.'~lo...