Loading...
HomeMy WebLinkAboutPermit Building 2000-4-10 ~,~ .,. ~ 225 North Fifth Street Springfield, OR 97477 . . I Job# 00-00115-01 I Page 1 of 3 TRANS#:01-0001187 DATE:APR 10 2000 AMT RECD:1 $ 40.00 CHANGE:$ 12.50 CASHIER: 003 CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-00115-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 2048 Firth Ave Spr Assessors Map#: 17032512 Lot: Block: Addition: Owner: Address: Tax Lot #: 05500 Subdivision: Rich and Diane Hickam Phone Number: 541-726-0760 2048 Firth City/State/Zip: Addition Springfield, OR 97477 Value: $29,248 Scope Of Work: Family Room HICKMAN DINING/FAMIL Y ROOM ADDITION Contractor Mor Than Homes Inc 2278 10th Street, Springfield, OR 97477 Reynolds Electric Inc 2175 W 2nd Ave, Eugene, OR 97402-7103 Mechanical Contr Marshalls Heating 4110 Olympic Street, Springfield, OR 97478 Contractor Type General Contr Electrical Contr Registration # Expiration Oate Phone 17252 2/8/2001 541-343-7297 541-747-7445 Office Use Land Use: Zoning Code: Bedrooms: Range: Quad Area: # Of Units: Constr. Type: (V) Wood Frame Water Heater: # Of Buildings: 1 Occupancy Group: Dwelling Heat Source: Sq. Footage: 420 To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Footing Foundation Post and Beam Floor Insulation Ceiling Insulation Shear Wall Nailing Framing Wall Insulation Orywall Required Inspections I Buildinfl -After trenches are. excavated. -After forms are erected but prior to concrete placement. - Prior to floor insulation or decking. - Prior to decking. - Prior to cover. -Before covering sheathing with finish materials. - Prior to cover. - Prior to Cover - Prior to taping. ~ . I Job# 00-00115-01 I . Page 2 of 3 Required Inspections I Building I - When all required inspections have been approved and the building is complete. Electrical - Prior to cover. -When all electrical work is complete. I Plumbing -Prior to filling trench. r - Mechanical Final Building Rough Electrical Final Electrical Storm Sewer Line Rough Mechanical Final Mechanical -I - Prior to cover. -When all mechanical work is complete. Zoning: FloodPlain? 0 Wetlands? 0 Journal numbers 1: 2: Comments: Overlay District: # of Street Trees: 3: Additional Requirements: Glenwood Area? 0 Required Attachments: Source Locn: Material: Planner: Urban Growth Boundary?O Quantity Of Fill: Supplier: Orainage: Floodway FEMA: Construction Types:(V) Wood Frame Occupancy Groups:Owelling # Of Buildings: 1 # Of Bedrooms: Handicap Access? D rArea (Sq. r "t) Main: 420 Accessory: Fee Residential Plan Check Total Plan Check Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building Branch Circuits W/O Feeder or Service State Surcharge For Electrical Permit State Surcharge For Electrical Permit Electric Administrative Fee Flood Plain FEMA: # Of Stories: 1 Current Units: Census Code: Does not apply Land Use: Pave Oriveway? D Height (feet): Proposed Units: Total:420 Paid On Receipt# Plan Check 02/15/2000 606 Buildinfl 02/15/2000 606 02/15/2000 606 02/15/2000 606 Electrical 02/15/2000 606 02/15/2000 606 04/03/2000 1126 02/15/2000 606 Value/Quantity 29,249 29,248 3 Fee Amount $125.45 $125.45 $193.00 $13.51 $5.79 $212.30 $39.00 $2.73 $.00 $1.17 -- , ~ . Fee Electric Administrative Fee Total Electrical Minimum Plumbing Permit Fee State Surcharge For Plumbing Permit Storm Sewer Footage Plumbing Administrative Fee Total Plumbing Minimum Mechanical Permit Mechanical Administrative Fee Mechanical Issuance State Surcharge For Mechanical Permit Total Mechanical Residential - Single Family - Storm SDC Administrative Fee Total System Development Grand Total Plan Check Type Initial Review-Res Engineering-Res Struct s Checked By Bob Barnhart Steve Templin Wendy Stanley Job# 00-00115-01 Paid On Receipt# Electrical 04/03/2000 1126 Plumbing 04/10/2000 04/10/2000 04/10/2000 04/10/2000 Mechanical 04/03/2000 1126 04/03/2000 1126 04/03/2000 1126 04/03/2000 1126 System Development 02/15/2000 606 02/15/2000 606 Date Completed 01/27/2000 02/03/2000 02/15/2000 . Page 3 of 3 Value/Quantity Fee Amount I $.00 $42.90 30 $.00 $1.75 $25.00 $.75 $27.50 1 $15.00 $.45 $10.00 $1.05 $26.50 334 $77.49 $3.87 $81.36 $516.01 #