Loading...
HomeMy WebLinkAboutPermit Correspondence 1993-7-13 " .' / @ Branch Engineering "\ 13 July 93 310 North 5th Street Springfield, Oregon 97477 (5031 746-0637 FAX(503)746~389 City of Springfield Planning and Development 225 North Fifth Springfield, OR 97477 Re: City permit #930456 "17'1 F~LI1 Our design for the above project included a pier replacement, based on the conservative assumption that the existing piers may not be adequate. This was done because the existing piers were concealed beneath the floor slab and could not be physically inspected. The owner asked us to re-evaluate this position, and we inspected the site on 8 July 1993 when a column had been removed to reveal the top of its pier. We saw no evidence of settlement, and the base of the column showed very little deterioration due to contact with the concrete, We can assume that the barn 10ft had been loaded significantly during its lifetime, and the existing piers have been pre-loaded with more weight than they will presently be carrying, and that settlement will not be experienced, While the column bases are in contact with concrete, and no underslab vapor retarder is present, the CABO code does not specifically prohibit this. Any future moisture-related deterioration of the column bases due to the concrete contact may be addressed when it becomes a problem. We therefore conclude that the pier replacement is not required, and the present assembly will substantially conform to the CABO code, cc: Mike Ditlefsen " TRANSPORTATION CIVIL SURVEYING /'