Jim: Attached is the Floodplain Overlay decision issued for the Liberty Professional Center. According to the staff
findings, the Base Flood Elevation for lot 4 is between 429.0 - 429.4 feet. The base flood elevation information should
be stated on the final plat sheet and a monument should be installed somewhere on the property.
Two quick reminder items as the project heads to Site Plan Review:
1. Stormwater infiltration facilities (eg. bioswales) will require additional depth of planting medium to address
groundwater quality issues. For this site, 18-24" of planting medium will be required.
2. Floodproofing of public and private utilities installed to serve the development site will be required in
accordance with Conditions 2 & 3 ofthe Floodplain Overlay permit. I apologize for not mentioning this during
the meeting.
Please let me know if you have any questions, and all the best as we head into 2011.
Andy Limbird