Loading...
HomeMy WebLinkAboutBuilding Correspondence 1996-5-30 ... .. ~/::J.' 225 FIFTH STREET SPRINGFIELD. OR 97477 PUBLIC WORKS DEPARTMENT ADMINISTRATION TRANSPORTATION DIVISION ENGINEEFlING MAINTENANCE DIVISION , May 30, 1996 Attention: Tim Woodley, Program Manager Springfield Public School - Maintenance Center 1890 42nd Street Springfield, OR 97477-5602 SUBJECT: FOLLOW UP INFORMATION NEEDED FOR THREE NEW SCHOOL SITES Dear Mr. Woodley, From my request letter dated April 22, 1996, I have only received the drainage calculations for the 935 Filbert Lane site. Please provide me with the following items as soon as possible to continue the review of the three new school building permits: 1) Drainage studies and capacity evaluations for the on and off site drainage systems. 2) Sanitary sewer studies and capacity evaluations for the on and off site sanitary systems. 3) Construction plans for off site public infrastructure improvements. 4) Construction schedules and timing of both on and off site improvements. 5) Confirm that the drainage plans comply with the site plan approvals [Journal #96-02-19 (need over flow to public system), 96-02- 36 and 96-02-21]. Submit revisions as needed. 6) New and existing area of impervious surfaces for each site. If you have additional questions or need clarification, please call me at 726-3688. Sincerely, ~~ 41lc..~ Troy McAllister Civil Engineer c: Files: Job #960509, 320 51st Street, Journal #96-02-36 .geb.fu~@06a~~ 935 Filbert Lane, Journal #96-02-19 Job #960599, 900 South 32nd Street, Journal #96-02-21 ADMINISTRATlON/ENGINEEFlING/TRANSPORTATlON (503) 726'3753 FAX (503) 726,3689 MAINTENANCE (503) 726,3761 FAX (503) 726,3621