HomeMy WebLinkAboutPermit Building 1996-6-21
SPRINGFIELD
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 960511
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
Page 1
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 935 FILBERT LN
Assessors Map #: 18020522
Tax Lot #: 00800
OWner: SPRINGFIELD SCHOOLS
Address: 525 MILL STREET
Phone #: 744-6375
City/State/Zip: SPRINGFIELD, OREGON 97477
Description Of Work: ELEMENTARY SCHOOL
NEW
Value:
0.00
Name
Architect: DULL OLSON WEEK
Address
Phone
503-226-6950
--- PLUMBING ---
No.
122
Fee
Charge
1,220.00
325.00
295.00
505,00
Single Fixture
Sanitary Sewer
Water Service
Storm Sewer
2005
1840
3200
ft.
ft.
ft.
TOTAL PERMIT
2,345.00
-- - MECHANICAL ---
No.
Fee
Charge
45.00
4.50
33.00
45.00
222,00
10.00
8
Furnace/burner & vent < 1000,000 BTUs
Mechanical exhaust hood and duct
Vent Fan/Single Duct
BOILERS 1. 3MBH
37 VVB
Permit Issuance
TOTAL PERMIT
362.50
HANDICAP ACCESS: Y
-- OFFICE USE
QUAD AREA: 3CSC
LAND USE: 6800
Item
Sq. Ftg Main
Square Feet
58000
x
$/Square Feet
Value
5.396,100.00
TOTAL VALUE OF PROJECT
5,396,100.00
Plan Check Fee:
5,829.20 Rec #: 21125 Date: 04/16/96 Rec By:
SPRINOFIELD
Job Number: 960511
Page 2
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PLUMBING
Surcharge/Admin
REFUND PLAN REVIEW
8,677.00
694.16
362.50
28.21
2,345.00
187.60
-189.10
SUBTOTAL PERMITS
SYSTEMS DEVELOPMENT
12,105.37
22,614.50
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
34,719.87
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following "*" work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
SITB - To be made after excavation but prior to setting forms.
TEMPORARY POWER
GRADING/EXCAVATING/FILLING - To be done during constr by Special State
Certified Inspector. Provide reports/tests to City Building Inspector
WATER LINE - Prior to filling trench.
SANITARY SEWER LINE - Prior to filling trench.
STORM SEWER LINE - Prior to filling trench.
UNDERGROUND ELECTRICAL - Prior to Cover.
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement.
UNDERFLOOR DRAIN - Prior to cover or placement of concrete.
GAS SERVICE - After line is installed and line has been connected to a
minimum of one appliance. Pressure test done at this point.
CONC SLAB/SUB: PRIOR TO/FOLLOWING POUR
SLAB - To be made after all inslab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
GLU-LAM BEAMS - Inspection Certificate by an approved agency to be
provided to City Building Inspector prior to placement
ROOF SHEATING/NAILING - Before covering sheathing with finish material
ROUGH PLUMBING - Prior to cover.
ROUGH GAS - after line is installed and capped if not attached to an
appliance
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
BOLTS INSTALLED IN CONCRETE - To be done by State Certified Special
Inspector. Provide inspection/test reports to City Building Inspector
SHEAR WALL NAILING - Before covering sheathing with finish materials.
Job Number: 960511
Page 3
FRAMING - Prior to cover.
INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
DRYWALL - Prior to taping.
CEILING GRID/SUB:
CEILING GRID
SPECIAL
SPECIAL
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
-- - ADDITIONAL COMMENTS ---
DRC 96-02-18/19 PLANNER IS LYDIA NEILL
MISSING SEISMIC EVALUATION REPORT NO. 09-115-1648
COMPLY WITH LAND USE DECISION 96-02-19
Plans Reviewed By: DUANE HUSSEY
Building Site Reviewed By: LISA HOPPER
Date: 06/17/96
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
i-,9"","~ I. \..: IA )
OlJ.)l~ (J
Date
--- VALIDATION
Receipt Number: <:9 &. )417
Date Paid: '~i\ ,q~
_=, ""'V'd'~~~.= I05~~J,--;lH~IQIld)
Received By: 0-/"- t))W,
~aD?O
LD. \ ~ . q l.P
~ ~1{P 14. 5/ (~ct\ooL~ ')
.
#,
Page 1
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: SPRINGFIELD SCHOOLS
Location: 935 FILBERT LN
Developement Type: C Building Size:
Job No.: 960511
Lot Size:
Sq Ft
1. STORM DRAINAGE
Impervious Sq Ft 1.0 X 0
X
0.210
Per Sq Ft =
$0.00
2. SANITARY SEWER
Number Of PFUs
(see Page 2)
- CITY
1. 0 X 311
x
43.43
Per PFU
$13,506.73
3. TRANSPORTATION
Number Of Units
1. 0 X 500 X
X Trip Rate
0.010 X
X
Cost Per Trip
437.93 =
$2,189.65
Transportation Total
$2,189.65
4. SANITARY SEWER - MWMC
Number Of PFUs
311
X
X
Per PFU +
18.750 +
MWMC Admin Fee
10,00
$5,841.25
MWMC CREDIT If Applicable (see Page 2)
$0.00
TOTAL - MWMC SDC
$5,841. 25
SUBTOTAL - (Add Items 1, 2, 3 & 4)
$21,537.63
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
$1,076.88
TOTAL SDC
$22,614.51
Reviewed By: TROY MCALLISTER
Date:
, tl ~""
OS/24/96 ~ \o.\U.
~ ~~~
SPRINGFIELD
Job Number: 960511
Page 2
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
Number of
New Fixture
Unit
Equivalent
Fixture
Units
o
5
21
1
o
1
o
1
1
1
o
7
9
51
25
5
o
2
1
2
3
6
2
6
1
3
2
o
5
42
3
o
2
o
1
3
2
o
14
18
51
150
20
o
2
2
1
6
4
TOTAL FIXTURE UNITS 311
CREDIT CALCULATION TABLE: Based on assessed value, If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed:
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
88,730
X
0.00
0.00
o
x
0.00
0.00
CREDIT TOTAL =
$0.00
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)