HomeMy WebLinkAboutPermit Building 2002-3-20
,!
.
I Job# 01-01058-01 I
.
Page 1 of 4
TRANS#:Ol-Q008358
DATE:MAR 20 2002
AMT RECD:2 $ 6837.99
CHANGE:
CASHIER:061
~.
SPRINGFIELD
~
CITY OF SPRINGFIELD, OREGON
RESIDENTIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 01-01058-01
225 Fifth Street
Springfield, OR 97477
Office: 726-3759
. Inspection Line: 726-3769
Location Of Proposed Site: 797 Filbert Ln Spr
Assessors Map#: 18020522
Lot: Block: Addition:
Tax Lot #: 00600
Subdivision:
Owner:
Roger Sutherland
798 Filbert Lane
Phone Number: 541-746-2090
City/State/Zip: Springfield, OR 97477
New Value: $298,948
Address:
Scope Of Work: Single Family Residence
Verify Ground Rod
Footing
Foundation
Slab
Post and Beam
Floor Insulation
Ceiling Insulation
Shear Wall Nailing
New Construction of Single Family Residence reql/Y~.s ne~ address assignment for this
"lrllr.lmp.. Prior AnnrP."" WA" 7!lA F,lhp.rt Ln.- Ih8b>>,"nfli~'r.'" to hp. np.moh"hp.n. Nolp.: NEW
Contractor Type Contractor .1\~tr.:ttio'lj)#:'QExpiration Date Phone
II] [)~ ';f1f1. .,ti'S ~ "tfkn
General Contr David Smith OoJli11lu.~~Ce. Q'O.ollS~~/~~2 541-343-5620
2768 Martinique Ave, Eugene, OR 9740lb.... . ""'o::<-oo/'Iel; .,!!bylJo req1Jili.
,,//1. .."" .00 ''1~'/eO 6,s
Designer John Mitchell ?/JI116;fllle 'ilYOblllJOU,fOu, 'li/e:egOI]~~1-747-9414
x, x, X c:O"fll~'ciel;(~CO.oI:llo",::e8ef:'lily
Electrical Contr Roger Sutherland 'l//er i.9 1 '/'egOI] ~,!: u'e 0, file 9$,:>-0%5'41-746-2090
798 Filbert Lane, Springfield, OR 97477 -800. VI/Ii". f%,. 'li1e.sb'.
33.?, 'YoVo "/1101] ~
Plumbing Contr Barnes High Tech Plumbing Inc 83311 2/~J!~c.,fIo~ 541-726-9854
2787 Olympic St Ste 27, Springfield, OR
97477 A.
IVJ"\~
-"- -",..
Otfil:,lhUse.C'o
Quad Area: 3RNC Land u~6(J.;;~rig~~ Family Dwelling # Of Buildings: 2
# Of Units: 2 zon~{iI0~~:I)'K>J@g SIy"ll.(, Occupancy Group: Dwelling
Constr. Type: (VN) Wood Frame Bedro"o~ ~tVcSi UtVQ ~..r,ol. Heat Source: Wall Heat
Water Heater: Electric Range: I VD"IP~f1rt.7.~~lyl'lit.~~~l;::h._Sq. Footage: 2552
'-'IT/, 'O'''II1J. '~~.. ~ 1110
To request an inspection call the 24 hour recording at 726-376()JlAlI ins~~.~I(-WlYl:l{(i'~ before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.no.,~I1fgCil]ade the following
working day. 'IT
Required Inspections
I Buildin!l
-Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation i
- After trenches are excavated.
- After forms are erected but prior to concrete placement.
- To be made after all inslab building service equipment, conduit piping, and other equipment iter
- Prior to floor insulation or decking.
-Prior to decking.
- Prior to cover.
- Before covering sheathing with finish materials.
I.
Zoning: MDR
FloodPlain? D Wetlands? D
Journal numbers
1: 2001-11-0220 2:
Comments:Future ,Development Plan
~.
Framing
Wall Insulation
Drywall
Final Building
Underfloor Plumbing
Underfloor Drain
Rough Plumbing
Water Line
Sanitary Sewer Line
Storm Sewer Line
Drywell I
Final Plumbing
Underfloor Mechanical
Rough Mechanical
Wood Stove
Final Mechanical
.
.
Page 2 of4
I Job# 01-01058-01 I
Required Inspections
Buildinll
.Prior to cover.
- Prior to Cover
.Prior to taping.
-When all required inspections have been approved and the building is complete.
I Plumbinll
- Prior to insulation or decking.
- Prior to cover or placement of concrete.
. Prior to cover.
- Prior to filling trench.
- Prior to filling trench.
o Prior to filling trench.
o Engineered Drywell is required.
- When all plumbing work is complete.
Mechanical
- Prior to insulation or decking.
- Prior to cover.
-After installation.
- When all mechanical work is complete.
Overlay District: Urban Fringe
# of Street Trees:
Land Use: Single Family Dwelling
Pave Driveway? D
3:
Additional Requirements:
Glenwood Area? D Required Attachments:
Source Locn:
Material:
Planner: Liz Miller
Urban Growth Boundary?0
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA: Zone X
Flood Plain FEMA: Panel 1162/2975
Construction Types:(VN) Wood Frame
Occupancy Groups: Dwelling
# Of Buildings: 2
# Of Bedrooms:
Handicap Access? D
,Area (Sq. Feet)
I Main: 2552 AccessoryS760
Fee
Residential Plan Check
Additional Plan Check
Hourly Plan Review
Total Plan Check
Building Permit
# Of Stories: 1 Height (feet): 22
Current Units: Proposed Units:2
Census Code: New SF - attached
Total:6312
Paid On Receipt#
Plan Check
09/27/2001 6827
03/20/2002 8358
03/20/2002 8358
ValueiQuantity
Fee Amount
255,157
91
1
$697.22
$90.84
$45.00
$833.06
Buildinll
03/20/2002 8358
298,948
$1,212.40
. .
" Job# 01-01058-01 Page 3 of 4
Fee Paid On Receipt# Value/Quantity Fee Amount
Buildinll
Demolition 03/20/2002 8358 1 $45.00
State Surcharge For Building Permit 03/20/2002 8358 $88.02
8% Building Administrative Fee 03/20/2002 8358 $100.59
Total Building $1,446.01
Electrical
Minimum Electrical Permit Fee 03/20/2002 8358 $.00
Wiring Footage 1,000 Sq Ft or Less 03/20/2002 8358 1 $106.00
Wiring Footage Each Add'l 500 Sq Ft 03/20/2002 8358 11 $209.00
Temporary: 200 Amps or Less 03/20/2002 8358 1 $50.00
State Surcharge - Electrical 03/20/2002 8358 $25.55
8% Admin Fee - Electrical 03/20/2002 8358 $29.20
Total Electrical $419.75
Plumbinll
Minimum Plumbing Permit Fee 03/20/2002 8358 $.00
Number of Fixtures 03/20/2002 8358 5 $70.00
Three Bathrooms 03/20/2002 8358 1 $306.00
State Surcharge - Plumbing 03/20/2002 8358 $26.32
8% Administrative Fee - Plumbing 03/20/2002 8358 $30.08
Total Plumbing $432.40
Mechanical
Hood and Exhaust 03/20/2002 8358 1 $9.00
Minimum Mechanical Permit 03/20/2002 8358 $.00
8% Administrative Fee - Mechanical 03/20/2002 8358 $6.48
Less than 100,000 BTU 03/20/2002 8358 1 $12.00
Vent Fan to One Duct 03/20/2002 8358 4 $24.00
Wood stove 03/20/2002 8358 1,000 $30.00
Dryer Vent 03/20/2002 8358 1 $6.00
Mechanical Issuance 03/20/2002 8358 $10.00
State Surcharge - Mechanical 03/20/2002 8358 $5.67
Total Mechanical $103.15
System Development
Residential - Single Family - Storm 03/20/2002 8358 8,307 $2,267.81
SDC Administrative Fee 03/20/2002 8358 $154.14
Residential - Improvement 03/20/2002 8358 1 $659.76
Residential - Reimbursement 03/20/2002 8358 1 $155.13
Total System Development $3,236.84
Willamalane SDe
S.F. Residence - Willamalane 03/20/2002 8358 1 $1,000.00
Total Willamalane SDe $1,000.00
Planninll
Planning Plan Review 03/20/2002 8358 1 $50.00
Total Planning $50.00
Permits w/o Srchll
Address Assignment 03/20/2002 8358 1 $8.00
Total Permits w/o Srchg $8.00
.
..
,
Fee
Large copy - Photocopy Fee
Total Deposit/Copies/Mis
Grand Total
Plan Check Type
Checked By
Initial Review-Res
Bob Barnhart
Engineering-Res
Steve Templin
Planning-Res
Liz Miller
Planning-Res
Liz Miller
Planning-Res
Liz Miller
Structural-Res
Tom Marx
Job# 01-01058-01
Paid On Receipt#
I Deposit/Copies/Mis
03/20/2002 8358
Date Completed
10/01/2001
02/15/2002
12/11/2001
02/05/2002
10/18/2001
.
Page 4 of 4
Value/Quantity
Fee Amount
2
$6.00
$6,00
$7,535.21
Comment
APPLICANT MUST SIGN IMPROVMENT
AGREEMENT AND RIGHT OF WAY
DEDICATION AND PAY RECORDING FEES
($36.00 to "LANE COUNTY DEEDS &
RECORDS" PRIOR TO ISSUING PERMIT.
SEE DOCUMENTS IN FILE.
House to be sited 20' north of location
indicated on submitted plot. Shop to remain in
same location indicated per owner. Set backs
still within limits allowed by city. DB 101501.
Called owner 10/16/01 regarding Future
Development Plan for lot in the UGB. Sending
out letter to detail.
Waiting for joint/use access agreement with
12' width abutting property.
Joint Use access agreement submitted.
Dennis Ernst to record this week. Home
Occupation regulations included with plans
due to size and offices in shop.
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that.NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701.055 will be used on
this project.
I further agree to ensure that all required inspections are requested at the proper time, that each
address is readable from the street, that the permit card is located at the front of the property, and the
approv:w~ w~in on he site at all times during construction.
Signature
S/20/(jd-
Date I I