Loading...
HomeMy WebLinkAboutPermit Building 2002-6-3 . . ~ 225 Fifth Street' Springfield, OR 97477 . . ~ I Job# 02-00400-01 I Page 1 af4 TRANI!: 01-0009345 JUN 03 2002 $ 5797,71. 032 CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety ; Job Number: 02-00400-01 Office: 726-3759 Inspectian Line: 726-3769 Location Of Proposed Site: 3494 Falcan Dr Spr Assessors Map#: 17021943 Lot: 83 Block: Additian: 1st Owner: Address: Tax Lot #: 03700 Subdivision: Ambleside Tadd Wa9ner 1977 Bannie lane Phone Number: 541-746-6896 City/State/Zip: Springfield, OR 97477 New Value: $195,608 Scope Of Work: Single Family Residence Contractor Type General Gantr Electrical Gantr Mechanical Gantr Plumbing Gantr SFR Contractor Registratian # Expiration Date Phone Tadd Wagner .' , ..... 1~" ~_, '" 541-746-6896 1977 Bannie lane. Springfield. OR 97477 (~'i;~\~~~'I~~ adapted oy the oregan Ut;lll~ I rhose 'ules are set 10,. . TaddWagner NatilicatianCen.ei.; h 'hOAR952-9dP46-6896 .. OAR 952-001-0010 t. roug 1977 Bannie lane, Springfield, OR 9747"1\ bt' copies 01 the rules by 0090. You may 0 am _~ Tadd Wagner callina the center. (Note: thetel~~hal541-746-6896 1977 Bannie lane, Springfield. OR 97477 numb;r lar the Oregon Utility Notillcatlor. Tadd Wagner Centeri~ t_P"C_""?-?344). 541-746-6896 1977 Bannie lane, Springfield, OR 97477 To. request an inspectian call the 24 haur recarding at 726-3769. All inspectians requested befare 7:00 a.m. will be made the same warking day, inspectians requested after 7:00 a.m. will be made the fallawing warking day. Verify Ground Rod Footing Foundation Post and Beam Flaar Insulation Ceiling Insulation Shear Wall Nailing Framing Wall Insulation Drywall Final Building Temporary Power Required Inspections I BuildinR I -Install ground rod at faating, and call far ins.eectian in canjuctian with faating and/ar faundatian ir -After trenches are excavated. NuTICE: -After farms are erected but priar to. cancr'~OI~!IT. SHALL EXPIRE IF THE WORK - Pr~ar to. flaarlnsulatlan ar decking. AUTHORIZED UNDER THIS PERMIT IS NO - Prior to. decking. COMMENCED OR IS ABANDO T -Pnar to. caver. NED FOR -Befare cavering sheathing with finish maMlXIJ.80 DAY PERIOD. - Priar to. caver. - Priar to. Gaver -Priar to. taping. -When all required inspectians have been appraved and the building is camplete. I Electrical I -Appraval required priar to. SUB energizing pale. . . Underfloor Plumbing Underfloor Drain Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Final Plumbing UnderCIoor Mechanical Rough Gas Rough Mechanical Gas Service Final Mechanical SW-Curbside CC-Standard . . I Job# 02-00400-01 I Required Inspections I Plumbinq - Prior to insulation or decking. - Prior to cover or placement of concrete. - Prior to cover. - Prior to filling trench. - Prior to filling trench. - Prior to filling trench. - When all plumbing work is complete. Mechanical -Prior to insulation or decking. -After line is installed and capped if not attached to an appliance. - Prior to cover. -After line is installed and line has been connected to a minimum of one appliance. Pressure tes -When all mechanical work is complete. Public Works I - After forms are erected but prior to placement of concrete -After forms are erected but prior to placement of concrete Sidewalk Type: Additional ROW? Size Of Line (in): Downspouts/Drains: Enchroachment Permit: Street Improvement: Fully Improved Curb Cut?0 Improvement Agr.?D San Sewer Depth (Ft): 6 4 Storm Sewer Available? 0 Special Req.: Security Required: Bond Begin DateTime: Special Instructions: Other Utilities: Project Supervisor: San Sewer Tee (in): DO/DO/DODO 00:00:00' Bond End DateTime: STORM SEWER STUB IS PRIVIDED AT NE CORNER OF LOT Page 2 of4 Curbside - 5' o 8 To Storm Sewer 00/00/0000 00:00:00. Types Of Warning Devices Reqd. Zoning: LDR FloodPlain? 0 Wetlands? 0 Journal numbers 1: 2: Comments: Planner: Sam Gollah Urban Growth Boundary?D Quantity Of Fill: Supplier: Drainage: Floodway FEMA: X-White Overlay District: # of Street Trees: 3 Land Use: Single Family Dwelling Pave Driveway? 0 3: Additional Requirements: Glenwood Area? 0 Required Attachments: Source Locn: Material: Flood Plain FEMA: 1153 of 2975 , , . Construction Types:(VN) Wood Frame Occupancy Groups:Dwelling # Of Buildings: 1 # Of Bedrooms: 3 Handicap Access? D [Area (Sq. r, ,t) I Main: 2393 AccessoryB72 Fee Residential Plan Check Total Plan Check Building Permit State Surcharge For Building Permit 8% Building Administrative Fee Total Building Minimum Electrical Permit Fee Temporary: 200 Amps or Less State Surcharge - Electrical 8% Admin Fee - Electrical Total Electrical Minimum Plumbing Permit Fee Three Bathrooms State Surcharge - Plumbing 8% Administrative Fee - Plumbing Total Plumbing Hood and Exhaust One to Four Outlets Minimum Mechanical Permit 8% Administrative Fee - Mechanical Less than 100,000 BTU Vent Fan to One Duct Gas Fireplace Dryer Vent Mechanical Issuance State Surcharge - Mechanical Total Mechanical New Sidewalk New Curbcut Multiple Permit Discount - 2nd Permit Total Public Works Residential - Single Family - Storm Residential Improvement MWMC MWMC Administrative Fee Job# 02.Q0400.Q1 I . Page 3 of4 Private Garage/Carp/Stor # Of Stories: 2 Height (feet): 26 Current Units: Proposed Units:l Census Code: New SF - detached Total :3265 Paid On Receipt# Plan Check 04/08/2002 8548 Building 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 Electrical 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 Plumbing 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 Mechanical 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 Public Works 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 System Development 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 Value/Quantity 195,608 195,608 1 1 1 1 1 4 1 1 130 1 1 3,096 1 1 Fee Amount $570.47 $570.47 $877.65 $61.44 $70.21 $1,009.30 $.00 $50.00 $3.50 $4.00 $57.50 $.00 $306.00 $21.42 $24.48 $351.90 $9.00 $4.00 $.00 $5.12 $12.00 $24.00 $9.00 $6.00 $10.00 $4.48 $83.60 $77.80 $75.00 $-30.00 $122.80 $845.21 $34.83 $10.00 address change approved to Falcon Drive side. Access taken from 35th Street, but applicant applied for address on Falcon because residence faced and majority of residence was on Falcon Drive. Approved by L Hopper 4/1 0/02 . . . Page 4 of4 Job# 02.Q0400.Q1 Fee Paid On Receipt# System Development 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 06/03/2002 9345 Value/Quantity SDC Administrative Fee Property Annexed 1997 Residential Sanitary MWMC Residential - Improvement Residential - Reimbursement Sanitary Sewer SDC Reimbursement Sanitary Sewer SDC Improvement Total System Development 30 1 1 1 29 29 S.F. Residence - Willamalane Total Willamalane SDC Willamalane SDC 06/03/2002 9345 1 Planning Plan Review Total Planning Planninn 06/03/2002 9345 1 Address Assignment Total Permits w/o Srchg Grand Total Plan Check Type Permits w/o Srchn 06/03/2002 9345 1 Checked By Date Completed Comment Initial Review-Res Lisa Hopper 04/10/2002 Engineering-Res Planning-Res Structural-Res Bob Kettwig Sam Gollah 04/23/2002 04/18/2002 04/18/2002 Tom Marx By signature. I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct. and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property. and the approved set of plans will remain on the site at all times during construction. '- y-~.d "...- Signature~ Date Fee Amount $155.48 $-18.87 $332.86 $659.76 $155.13 $619.73 $470.96 $3,265.09 $1.000.00 $1,000.00 $55.00 $55.00 $8.00 $8.00 $6,523.66 $;" -3--0~