HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2003-1-15
.............
'---
.;
.
,~
Community Services Div, Building Safety .
CITY OF SPRINGFIELD, OREGON
225 5th street, Springfield, OR 97477 Ph, 726-3759
"
JobAddte<~3422 Falcon Dr.
CitY"job # tOM 2903 ggg')~
AMBLESIDE MEAOOWS SUIsDIVISION-lsT ADDmON
I
. .
Site Investigation ,Qu~tionnairefor (:onsultiog Design Professionals
foundation requirements - new structures on residential lots
SCANNED
I
.~ -. '.:.
This form may be.used as a teIitporary verifiClltimit.o,~ow construction to continue
on the job site untii'tbeconsultarit's Stmnped affi~avit~iithe site soil comPaction ,
and stabilizatioil is submitted. to the City. This form mUst be coinpl~ted by a " r.
IiceWied design professional (engiOeeror archiiect)orhislher authorized einployee,
, .' - - . ".-'. ,,-,' " ,",-,,, -',"' -: ,,'" "--, . '-' -,-' < -' ", - '" - ;
and submitted. to the building ins)lector prior to requestlngCityinspectioDsor
placing foundatic:m concrete.ItisiJnp!J~t that all qu~onsbe answered
completely for the folindation site to ber~pproved't'or w;"';" dC,tion.
,
,.
Owner and/or Contractor
RH'Homes
"
!
. '.
1. Date of the design profeSsional's site evaluation?
".'" ." ..
, ,) .'. -,
] /15/2003"'~j:' .
, ';'. ,~~.,~ I ":...
i~' . .'~',. "...' ~.
.:; 1'-' ....~
. '- "\ - "-.',
2. Has the deSign profeSsional reVie'Yeda copy of the geotechnical information ','
for the subdivisioJl'tb8t was providedwith the buildiJlgPermit? Ye.u !vo_
-, . ",' ".:,' ..' ,,',','" -"'j>':',,' "'- "";,, ....
If not, please contact this office for a copy of the report, The design professional
must be familiarWith the geotechnical infOrmation before completing thisform. '
-
,). , -, ...
3. VVhafwas the size imd depth of the excavation and lor fill?
Ann~nx: 40' {( 30' notincludina drivewa\iaccess. Depth ranqed
from'2.0 to 2.5' -
.....
waS existing non-stlUctUralfill or el(PaIlSive soil encouriteredon the lot?
Yes.:aNo...c.If''yes'', what types, depths and IOcatiOlis? Snils at the site.
consisted of 1-0 tol.5-ftof dark brawh wet mbd. dense mod. plastic
si 1 tsand sandy-s il tswith ,constructi on debris over a soft, tan
highly-plast1c saturateaclay. 'Ine.claYls tlKe.IY 1:0 nave a nlgh
Ilqula tlmn ana mooerate; c.o fl'gO!-,UC""Cld-' ,-ur' ~i"'I"KI:~w"il. .
What measures were riUcento remedyth~ ,soil cOndition (include type of
engineered fill used to s~ilizethe S{)i1)?,,'. The sitewas.excavated to a depth of
2. O-'ft,mi n. to 'undl sturbed tan clays . ApproJl:" J'.O to ~. u~reet of
. I : I !.t-ln. ml nusaense-graaea7.~rusnea aggrega-ce was p' aceu on -ene cl ay
. .
anu l:UfflfJdl,; 1:'"'11_
"
,.-
~~
\".
.
.
~
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 5~ Strect. Springfield. OR 97477 Ph, 726-3759
Job Addres< 3422 Fa 1 con Dr.
City Job # COM 2003-00005
____A oprfnrritprl 4-;0_ [DS rlrri~o Wri~ Dl~pd riround the oerimeter
of the excavation prior to placement of the cr.. aggregate and routed
to drain to the street. The. footings should be formed on the compacted
cr. aggregate ana covereo wltn a m1n1mum OT J!:-lncnes OT Sl tl:y soil.
Is the site as prepared adequate,@ inadequate 0 to maintain constant moisture
content in the sub grade? Note: Verification of moisture stabilization in the sUb
grade is a requirement of the geotechnical report. and must be affirmed before
constniction can continue.
If inadequate, what measures are needed to provide constant moisture content in
the sub grade? .
v
Is the site as prepared adequate IY inadequate 0 to support the ,,,ut'u,,oo
suucture? An affirmative answer is requisite to proceeding with construction.
If irnidequate, what additioDal work is needed. to provide adequate
foundation support? . '
4. Did the design p. u::':""ional witness placement and compaction of the
engineered fill. or is there a special inspection.. '. ' '.. : forthcoming from a
qualified agency? I witnessed Placement 0 Speciallnsplcompaction report 19
compaction test results attached.. .
5. The design professional intends to use the following inethod for installation
of perforated perimeter footing drains:, ,
The design on the attaChed drawmg prOvided by the design professional ...... 0
The method shownon the original consuuction drawings..,...................... 0
The typical 'Foundation Drain' dt8wing attached to peinllt .........~........... 0
Perforated perimeter (Iiains are not required ........,.............................. 0
Comments: The oerimeter footinqdrairil'ias installed as per
our recommendations on the.site during excavation.
Note: City inspectors will inspect installed drains priOr to cover upon request...
Call: 726-3769 to schedUle inspection.
"
.,.';~;
,
2 'l-
"-
.
.
~
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 5" Street, Springfield, OR 97477 Ph, 726-3759
Job Addres< 3422 Falcon Dr.
City Job # tOM 2003-00005
-"'-
Low~point crawl space di-ains are required to prevent the build-up of excess
moisture inside the foundations during (and after) constroction. This drain
may beinStaIIed after foundation placement onlv With the exnress ~"' " .'ssion
of the desiim rirofessional.
a. The design professional has determined the following:
The crawl space drain is required when the foundation is installed..... 0
The low-point drain can be installed after foundation placement without a
significant moisture build-up problem within thefoundation............. 0
(The low;point drain may be installed at the' frami ng . stage
of constrUction) post '" _framing, roofing. etc,
b. Has the design'professional observed and approved the installation of the
required low point drain?...............,.................. Yes, ~Noxx--
if "yes", where is thelow point drain located under the building and
where does it.terminate atthis time? (mUst be an approved location, i.e.
street gutier, storm sewer, sumppump and discharge line to the street,
etc.) , .
The design professional must determine whether the approved peImit drawings have
adequate foundation steel. 'Isany additional foundation steel required that is not
shown on the foundation draWings for the building? " .
Yes _ No~. If "yes", describe lUiditio'nal steel required (or provide draWing).
The following statement must be signed by the individual doing the observations and
providing direction for the eXcavation and site preparation work on the property.
3 .,
r
.
.
~~
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
2255'" Street, Springfield, OR 97477 Ph, 726~3759
Job Addres< , ,4?2 Fa1cop Dr,
City Job # COM 2003-00005
-
. p'.
The undersigned design professional (or luiJ/Wrized employee) aJtests that he/she
. ' .
observed required moisture stability procedures on this site, and that sw:h procedures
were accomplished before any changes occurred in the moisture content of the sub-
grade under and around the building (wh,ereexpansive soils were encountered), The
undersigned further attests that the sub-grade, as prepared, is adeqiulte to support the
building proposed for this sUe.
Additional comments:
(Note): A copy of this ""r _.1 shall be kept on site with the approved plans at all
times.
This ."t'v.~ shall be followed by an affidavit, signed and stamped by the design
professional under whose auspices this '''l-M. was completed, affirming the information
herein, The signed/stamped affidavit together with a copy ofthis."t'v.~ shall be
submitted to this office prior to requesting framing inspection for the building.
Signatu~' · . > '~...4 .......-.
Name Mi("tiile1~t>olqr Titlepresident
Compau" K & A Enqineerinq. Inc.
Phone 084-9399
,;
LicenseeMirh'I>l ~I>mhn1rlt
License #1 q474
expires 12/31/04
The geotechnical report for the Ambleside Meadows - 1st Addition Subdivision
recommends immediate moisture stabilization Of exposed expansive sub-grades, and that
expansive soils be over-excava1edand replaced with at least 12 inches offill compacted
to at leaSt 95% of ASTM D698 for foundation preparation: The report alSo recommends
that measures be taken to, prevent water from cOlleCting in or arouild the foundation areas
during and after the construction process; and that positiv{l site drainage be provided to
reduce the infiltration of surface water into the expansive sOils. .' .
The geotechnical report further emphasizes that the finish grade of landscape soil
adjacent to the foundation should be at least 24" above the expansive bearing soils, firmly
comoacted to reduce the infiltration of water at the surfaCe. The adequacy of fill soil
material around the building must be verified to' the satisfaction of the design
professional.
4
n
,.
o
-.- J.
.
.
c
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 51b Street, Springfield. OR 97477 Ph, 726-3759
lob Addres.< 14?? F.l rnn Or_
City lob # COM 2003-00005
Affidavit
For Site Investigation Questionnaire
Foundation Sub-Grade Approval for
Residential Building Site in Ambleside Meadows - 1 Sl Addition
Subdivision
The undersigned hereby affirms that the excavation, structural fill and moisture
stabilization methods for the building site at the address shown above was observed by
me or an authorized employee of my firm and that the following is true: .
1. The foundation sub-grade is capable of supporting a minimum of 1500 psf, and is
adequate to support the building proposed for this site.
'.
2. The moisture content of the excavation was adequately maintained during the site
preparation process and was adequately covered to scibilized moisture content
prior to any significant change in moisture content of thesub-grilde. "
3. The , site is adequately graded and drained to prevent the collection of water in the
excavated area during construction. .
Sign~,,--,-.../~
4. The accompanying '''t'~.; titled "Site Investigation Questionnaire for Consulting
Design ProfessionaIs" containing field observations and instructions made on
1 /15/2003 , '(date) for the building site was completed either by
myself or by an employee of my firm under my supervi~ion, To the best of my
knowledge, theiIiformatiOli cOiltained in that report is complete and accurate.
. ,M fc-h---f (Le.....k,UJ.-
Name of Licensed ProfessionaI (print) . 1I!"""'dti)~~
4~~~~,rr~
. ~~'~6ih!plf'e '~IU \'
~ ..;'" e., ~
~ 19474 '?=-
S ,~'t{). .-
4L ~ ......~.,2Io...-a,1I i,.....
~~. ,~
~ .....tltBER ,6, fO~
'fc'{ DENNIS ~~~
~~- - -~(J?
Date I A
I I
EXPIRES: /J~i jOy...
. ,~(
r
-~'......---,.----,--
,,-.
~
,:
'0"
.
.
Community Services Div, Building Safely
CITY OF SPRINGFIELD, OREGON
2255'" Street, Springfield, OR 97477 Ph, 72~3759
Iob Addres< ~.4?? Fa 1 C(l1) Or,
City Iob # COM 2003-00005
. ...
The undersigned design professiorud (or authOrized employee) attests that he/she
observed required moisture stability procedures on this site, and that sueh procedures
were accomplished before any clulnges occurred in the moisture content of the sub.
grade under and around the building (where expansive soilS were encountered). The
undersigned further attests that the sub-grade, as.prepared, is adeqUate to support tIu!
building proposed for this site. .
Additional comments:
(Note): A copy of this .".. ' .1 slUdI be kept on site With the approved plans at all
times.
This report shall be followed by an affidavit, signed and s........p...1 by the design
professional under whose auspices this '''pun waS completed, affirming the information
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to .this office prior to requesting framing inspectionJor the building.
"
Signa~' . '----.~\~ '~'.
Name M;d-i~e1RemDo1c\t' Titlepresident
Companv K & A EnQineerinQ. Inc.
Phone 684-9399
. '
Licensee M;-,..h::ll Q.' pg,mhn 1 tH-
License#lQ474
exprres 12/31/04
The geotechnical report for the Ambleside Meadows - 1st Addition Subdivision
reCommends immediate moisture stabillzation of exposed expansive sub-grades, and that . '
expansive soils be over-excavatedand replaced with at least 12 inches offill compacted
to at least 95% of ASTM D698 for foundation preparation; The report also recommends
that measures be taken to, prevent water from cOlleCting in or around the foundation' areas
during and after the constriIction process; and that positivI'; site drainage be provided to'
reduce the infiltration of surface water into the expansive soils. . .
The geotechnical report further emphasize$ that the fInish grade of landscape soil ,
adjacent to the foundation should be at least 24" above the expansive bearing soils, firmlv
comoacted to reduce the iirliltration of water at the. surface. The adequacy of fill soil
material around the building must be verified tome satisfaction of the design
professional.
4
r
"
,
In-Place Denslly
Inlllal
Reading,
et
0,0075
0,0076
0,0076
Test No.
1
2
3
Final
Reading,
ef. Volume, el Welqht, 9 Weight, lb.
0,0258 0,018301 1227,1 2,68
0,0259 0,018301 1170,6 2,56
0,0215 0,01390 1004,9 2,19
ASTM 0698 for 1 1/2,ln, minus
Client RW Homes
Project: 5,03
.
140,0 pel
.'
In.Place Density
34~2~eon Dr.
Eugene, OR
MOisture Content
Wet Moist c, Dry
Denslly, Sample of: Sample+ Moisture
pel Pan, ~ Pii'n,'D. 'Pan, p: Content, %
146,6 100.4 413,9. 393:2 7,1%
139,8 100,11 'z456,5440,O 4,9%
157,7 98,6 408,5 ' 384,7 8,3%
Average 6,7%
Std, Dev. 1,8%
q
,
K & A Engineering, Inc.
,.
Dry
Density,
pel
136
133
145
% Compaction 1
97%
95%J
103%1
99%
4,3%
, ,
1
.
j
j
.
J
.
-I