Geotech l1/alucfwn - 01..QOJ25.01
3370 FalconOr., River ValIeY,BUildetSl(Greg'pate:
Larkin)
K' it A ENbINE:E~lNb
PAGE 61
.
K & II Eiigltliiiirljj, irlli.
P.O,8ox 23624. Eugene, OR 974ii2
511iliafketSl., Suile 8, Eugene. OR 974il2 '
(541) 684-9399 Voke
(541) 684-935ilFAX
SCANr~ED
Michael Rembold!, P.E.
9
04125/2001
Attached Is a copy of our report and a completed site investigation questionnaire for the SUbject project Please call ~
you have any questions.
Sincerely,
~
Michael Rembold!, P.E.
K & A Engineering, Inc.
04/25/2661 15:12' 5416849358
" Community Services '-Uilding SofelY
, CITY OF SPRJNG1!rLD, OaEGON
2255" Slree(, Springfield, OR, 97477 Ph. 726-3759
K & A ENGItJEERlt~
Job Add",.s ~?",a...~ Od.....
-~ ~-- .,"- - .. .
CityJob# ~/- ~~~ -.....,L
PAGE 02
.
SPRlNGF!~lC
All - fill_
. ,~.
AMBLESIDE MEADOWS SUBDIVISION-1Sl" ADDITION
I Site Investigation Questionnaire for Consulting Design Professionals
toull~ation requilements - new strucmres on reSl(lentIal Jots
'this form may bc:used as a teDlpOl'ary verification to allow construction to Ctlutinue
on the jOb site WitH the ..,,", ,1t8nt's stamped affidavit on the sltt!, soil c:ompactlon
and stabUization is submitted to the City. This form must be completecl by a
Ucensed design professional (engineer or architect) or hlslher authoriRdemployee,
and submitted to the buDding inspector prior to requesting Ci:y inspedlOlllior
placing foundation conc:rete. It is important that all questions be answered
completely for the foundation site to be approved for construction.
Owner and/or Contractor /!IVl<r1f (/~" .r---:, .., ~
1. Date of the design professlOnal,'s site evaluation? --.t/.I f,k I
.
2. Has the design professional reviewed a copy of the geoteclmical info~OD
for the 8ubdi"lsion that was provided with the building ~ ..,.."'~j? Yes_No_
If not, please contact this office for a copy of the report. The design professional
must be familiar with the geotechnical information before completing this form.
3. What was the size and depth of the 1lX.... ..~n and lor till?
A-~,...._ ~. <:;-t' I ~.,r 'C......:'7' J.... :::?_1~~/7
' ,
Was existing non-structurlll fill or expansive soil encountered on the lot?
Yes_ No.$ If "yes", what types, depths and locations?
What measures were taken to remedy the soil condition (incluc;k: type of
engineered fill used to stabilize the soil)?A1trAJIr- /'l """,,, ',< I IZe:n
.
1
64/25/2661 15:12 5416849358 K & A ENGINEERING PAGE 63
Communily Services Dililding Safety JobAddre<< ~~... ftA4..-Go,J OP....
CITY OF SPRINGFIELD, OREGON CityJobi tD 1- CtD~2-r-_OJ
2255'" Slreet, Springfield, OR 97477 Ph. 726.3759
.
Is the site as prepared adequate I!.. inadequate 0 to maintain constant moistw:e
content in the sub grade? Note: Verification ofrrwisture stabiliza1ion in the sub
grade is a requirement of the geotechnical repon, and must be affimred before
construction CCl1l continue.
If inadequate, what measures are needed to provide constant moisture content in
the sub grade?
Is the site as prepared adequate Gl inadeqll4te 0 to support the proposed .
strucmre? An affirmative answer is requisite to proceeding with construaion.
H Inadequale, what additional work is needed to provide adequate
foundation support?
.
4. Did the design professional witness placement and compaction of the
engi "',", ,II flU, or Is there a speclallnspection report forthcoming from a
qualified agency? 1 witnessed Placement 0 Special/nsp/compaction report 0
N><> '~IJG-,~g;II. plw..... v--A-C /Z~II~&v1) D.te..I"VK4.iJ
S. The design professtonallnteods to use the following method for iD5lalJation
of perforated perimeler footing drains:
The design on the attached drawing provided by the design l'.vf....sional ....., 0
The method shown on the original consttUCtion drawings........ "" " "......,.. IS(
The typical 'Foundation Drain' drawing attached to permit ...................., 0
Perforated perimeter drains are not required .........." .. . ..... ........ ..... .. .... El
C._,....,...lS:
Note: City inspectors will inspect installed drains prior to cover upon request...
Call: 726-3769 to schedule inspection:.
.
2
04/25/2001 15:12 5416849358
Community Servil..s Di!'lding SafelY
CITY OF SPRINGF LD, OREGON
225 5" Stre.l, Springfi.Jd, OR 97477 Ph. 726-3759
K & A ENGINEERING PAGE 04
lob Address ~ J ~p A1-L4 A,/ IJJL.
City Job /; 0 I ~ 3 2.r--~ J
.
Low-poiut crawlspace drains are required to r"'..' o...t the build-up of excess
moisture Inside the foundations during (and after) c:ol15tn1ctlon. This drain
may be installed !!Jtt foundation pIa.."",. ,1 onlv wlth the exuresA ne~loq
of the deslm.nrofes.,.-.
a. The design professional bas detennined the following:
The crawl space drain is required when the foundatian is installed..... 0
The low-f'Qint drain can be installed after foundation placement without a
significant moisture build-up problem within the foundation...... ....." ~
(The low-point drain may be installed at the stage
of construction) p..,d. be....jrowU.g, ""'fI"G. lit.
b. Has me design professional observed and approved the installation of the
required low poinrdrain?..............____................. Yes, _No V-
if "yes", where is the low point drain located under the building and
where does it 'terminate at this time? (must be an approved location, i,e.
street gutter, storm sewer, sump pump and discharge line to the street,
etc.)
.
The design professional must detennine whether the Ii"".._ ".d pennit drawings have
adequate foundation steel. Is any additional foundation steel required that is not
shown on the foundaUon drawings for the buDding?
Yes _ No ~ If "yes", describe additional steel required (or provide drawing).
The following statonent must be signed by the tndMdual doing the obSe/"lJatiollS and
providing dtrection for the excavation and site preparation work On the property.
.
3
04/25/2001 15:12 5416849358
Communit)' Services Di.t'ding Safety
CITY OF SPRINGFIELD, OREGON
225 5'~ Street, Springfield, OR 97477 Ph. 726-3159
K & A ENGINEERING
PAGE 05
lob Addr"". S~~ ~~t..J.orL
City Job # U I ~ ~ 7_,) ~~J
.
The unthrsigned design professional (or authorit.ed employee) oltests that he/she
obse",ed required moisture stability procedures on this sUe, and that such procedures
were accomplished before any changes occurred In the moisture content o/the sub-
grtuk under tuUlaTOund the bui14tng (where e:qHI1ISille soils were encountered). The
undersigned further attestr that the BUb-gnule, as prepared, is adequate to support the
bUilding proposed/or this site.
Additional". ".,., ents:
.
(Note): A copy of this report slulU be kept on site with the approved plans at all
times.
This report shall be followed by an affidavit, signed and stamped by the design
professional under whose auspices this report was completed, affmning the information
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to this office prior to requesting framing inspection for the building.
Signatu.<..;':..tc. ,'~,. .~
Name M/d?'--' !,?;;"'AcJLnT- Title ~1Z=S;'D"-~,P.uA/C'Plr- t:--""6-~"*-
Company k. A- F IV' ~ , . ~fF,d . AI n. r-a.<<'" .
. ,
Phon.. "7P oJ. __ 'T"7 .,
Ll....1]lift ~,,.. " A ~ d FJ4.o1.<!. -.rL.o7""
License # '. /49 4- ~ (/- expires rv ~. If) ">--
,
The geotechnical.~t'~.. for the Ambleside Meadows - l't Addition Subdivision
recommends immediate moisture stabilization of exposed expansive sub-grades, and that
expansive soils be over-cxcavatcd and replaced with at least 12 inches of fill compacted
to alleasl 95% of ASTM D698 for foundation preparation. The report also recv........uds
that measures be taken to prevent water from collecting in or around the foundation areas
during and after the construction process, and that positive site drainage be provided to
reduce the infiltration of surface water into the expansive soils.
The geotechnical report further emphasizes that the fmish grade of landscape soil
adjacent to the foundation should be at least 24" above the expansive bearing soils, .tirmlv
comnacted, to reduce the infiltration of water at the surface. The adequacy of fill soil
material around the building must be verified to the satisfaction of the design
professional.
.
4
.
.
.
64/25/2661 15:12 5416849358
<;:ommunilY Services Dililding Safety Job Address ~ 3':tIt ~ .4L-CL'"J..u ~.
CITY OF SPRINGF D, OREGON CityJob# r.') (-DAC>.'i' 2,C:---o,L-
22~ S" Street, Springfield. OR 97477 Ph. 726-3759
K & A ENGINEERING
PAGE 66
, Affidavit
For Site Investigation Questionnaire
Foundation Sub-Grade Approval for
Residential Building Site in Ambleside Meadows _ 151 Addition
Subdivision
The undersigned hereby affums that the excavation, struclUral fill and moisture
stabilization methods for the building site at the address shown above was observed by
me Or an authorized employee of my firm and that the following is true:
1. The foundation sub-grade is capable of supporting a minimum of 1500 psf, and is
adequate to suppon the building proposed for this site.
2. The moisture content of the excavation was adequately maintained during the site
preparation process and was adequately covered to stabilized moisture content
prior to any significant change in moisture content of the sub-grade.
3. The site is adequately graded and drained to prevent the colIection of water in the
excavated area during construction,
4, The accompanying repon titled "Site Investigation Questionnaire for Consulting
Design Professionals" containing field observations and instructions made on
-4eI ?~ I.a.' (date) for the building site was completed either by
myseIl or by ;u{ employee of my firm under my supervision, To the best of my
knowledge, the information contained in that rcpon is complete and acCUlllte.
Name of Licensed Professional (print) M r CL~ /2 ~ 11. rl:' ,n+
.
~~~~
/;1" 1841. ~~\
~.1"'"
'~~J"
~ DENNIS ,,~
Elfl'IRES/ 31th-
.~-
Signatur~~.~, ..~
Date...!/--f 2.---S:" ) I