Loading...
HomeMy WebLinkAboutPermit Building 1996-10-18 (2) . COMM ERCIAL/I N DUSTRIAL PERMIT APPLICATION s~ . JOB NUMBER <J (/; /7/ ? 225 Fifth Street, Springfield, Oregon 97477 INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK: ASSESSORS MAP: ?~5' ))~A"/ (' ......... TAX LOT: OWNER: }(//?(~~T? 0~tO ? c;:; /?L _ 'i'r ~~) PHONE: 720 -43'? 0 v , ADDRESS. CITY- STATE:_~ ZIP: 0-:7d7e;., I r ( r DESCRIPTION OF WORK. NEW REMODEL 1].bt:P7 A??#/t7~ AD~TlON DEMOL~H OTHER VALUE: ~1LJ.~ NAME ADDRESS PHONE ARCHITECT: CDNTRACTOR'S NAME ADDRESS ( GENERAL: Vt/v"v S- /1fC';<"'/J,J. .~~~ ~"':!:-r- .~ ( CONST. CONTRACTOR' -;p,9b~cD EXPIRES PHONE r2.~n ,-r:si.3 -~- PLUMBINC'. MECHANICAl. ELECTRICAl - ft. I MECHANICAL FEE CHARGE ~~ LEE. I r~6~n~ Furnacel burner & vent I < 100.000 BTUs I Furnace/burner & vent I > 100.000 BTUs I .- I Floor furnace and vent I Suspended wall or floor I mounted unit healer I Appliance Vent j separate 1 Stationaryevap. cooler I I Vent Fan/Single I duct I Vent System apart J from AC or htg. 1 Mechanical exhaust hood and ducl I I I I Permit Issuance $10.00 j I TOTAL PERMIT I PLUMBING ND. Single Fixture Relocated Bldg. (new fix. addtll Water Service Sanitary Sewer ft. Storm Sewer It. Backflow Device TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: FLOOD PLAIN: OUAD AREA- LAND US.. . OF BLDGf" # OF UNITf'. ZONING. OCCy. GROUP: CONSTR TYP.. LIGHTING POWER BUDGET: WATER HEATER: . OF STORIES: HEAT SOURCE: so. FT. $/SO. FT. VALUE so. FTG MAIN SO. FTG ACCESc x x so. FTG OTHER x TOTAL VALUE OF PROJECC PLAN CHECK FEr RCPP DATE BY BUILDING PERMIT '3~, 5"'0 -I PLUMBING .3 () '7 I. 5% Slate , SurcharQe I FENCE VALUE' SIDEWALK IDEMOLlTION 5% Slate /.'l~L-I/(;, Surcharge . r/. I MECHANICAL I 15% State Surcharoe I PAVING FT. SUBTOTAL PERMITS SYSTEMS DEVELOPMENT CURBCUT FT. TOTAL PERMIT FEES I EXCLUDING ELECTRICAl -11,5" J . . REQUIRED INSPECTIONS It is the responsibillty of the permit holder to see that all inspections are made at the proper tlme. To request an InspectIon, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day. requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMeING. ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. PAVING: After grave] ]s In place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but ~rlor to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS 'X r FRAMING: To be made after ~he roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S.L (306 8.1) CONCRETE SLAB: To be . made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prlor to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all Insulation and re.qulred vapor barrlers are in place but before any lath or gypsum board Interior wall covering Is applied. HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BG. Standards 43.8. UNDERFLOOR: Plumbing, electrical, mechanicaL To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.,1 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. X a:oOR INS~ & ~ y'APOR-BARRIEHS: To be made prior to Installation of decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.c. STDS. 25.10,11). STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel location. bond beams grouting or verticals in accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excav~ting complete and form work and sub-base material in place. ------------------------------------------------------- ROOF SHEATHING AND NAILING: Prior to ]nstalling any roof coverIng. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. .In addition to the inspec- t]ons specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days ]n advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL PLUMBING h FINAL MECHANICAL 'X ( FINAL BUILDING: Requested after the final plumbing, electrical, "-...mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL FIRE DEPARTMENT ADD]TIONAL COMMENTS' PLANS REVIEWED BY DAT" By signature, I state and agree, that I have carefully examined the completed application and do hereby certify th?t alllnformatlon herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety DIvision. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agre to ensure thr' required inspections are requested at the proper tlme, that project address is readable from the street, that the rmlt card is located at the front of the property, and the approved set of plans will remain on the site at all times during con tructlon. /~gnaturp -1, __ LA . Date~//.8A~'c:O VALIDATION: AMOUNT RECE]VED: RECEIPT ': 4/ , 57 .. 2~ S(1!3 DATE PAID: RECEIVED BY: /0/.$/5' &, 4~~ -d/' - L