SPRINGFIELD UTILITY BOARD
WATER SERVICE CENTER 202 South 18th Street Springfield, OR 97477-5240 Tel 541.726.2396 Fax 541.747.7348 www.subutil.com
August 4, 2008
Andy Limbird
City of Springfield
225 N. 5th Street
Springfield, OR 97477
Dear Andy:
SUBJECT:
SITE PLAN TENTATIVE #DRC2008-00042 PEACEHEAL TH BIRTH CENTER
Tax Map 17-03-15-40, Tax-Lot 2200,353 DeadmondFerry Road
Listed below are our comments for the above referenced development proposal:
1.
The proposed development is within the Springfield city limits and will receive water service
from the Springfield Utility Board (SUB).
2.
All new water system facilities and modifications to water system facilities both inside and
adjacentto the proposed development shall be placed in street right-of-way at a location and
depth of15ury that meets the standards of the SUB Water Division. _ _ .
'. :. . 01:: ,"_ _ ,.,' : . ,', . .' . . _ . .: ' .... ~ -. ~ '''.' <.: ,-. ~ ,
, _'.. ,. _ , _ .' - . ' _ .' . ., .' . ,r /. ~, " . ,
All waier facility materials shall be to' it standard that must meet' SUB Water Division
specifications.
, ' -ll.;V
3.
4.
All workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
5.
Size of waterline and other facilities, including water meters, must meet the needs of the SUB
Water Division and the long-range needs of the City. These needs include, but are not limited to,
meter location and access, sizes of water distribution and transmission lines, pumping facilities,
and communication lines.
6.
Please ask the developer to contact the SUB Water Division for detailed information on the
materials and construction standards, detailed costs for installing SUB water facilities, and a
schedule of construction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities installation, and joint trench opportunities.
7.
All water meters will be placed in public right-of-way at a location identified by the developer.
Each lot orRarcel must have its own water service.
',.. I;:
8.
Water' se~ice facilities will be installed upon collection of development charges. Development
policies and charges identified in this letter are subject to change. Actual charges will be those in
eff~ct at the time water service is requested. .
S:\SITEPLAN\353 Deadmond Ferry Road site plan tentative 8-4-08.docx
Dat~ Received:
Planner: AL
i/S/:J&tJ8'
/ /
.
.
.
.
9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water
comes from wells. In every instance, care shall be taken to prevent groundwater contamination.
Contractors/developers/owners shall be responsible for the safe handling and storage of
chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water
runoff contamination.
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396.
10. Backflow prevention devices will be required for this service. Please contact Chuck Davis at
726-2396 prior to installing water service. Chuck can help in the selection of the most
economical device and location. Water service will not be provided until a backflow plan has
been submitted to SUB Water Engineering and approved for installation.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division and
SUB Electric Division.
Sincerely,
~~L
Rebecca Templin, P.E.
Water Engineering Supervisor - Water Division
RAT:mk
cc: PeaceHealth Oregon Region, P.O. Box 1479, Eugene, Oregon 97440
Philip Farrington, AICP, PeaceHealth Oregon Region, 123 International Way, Springfield, Oregon 97477
S:\SITEPLAN\353 Deadmond Ferry Road site plan tentative 8-4-08.doex