Loading...
HomeMy WebLinkAboutCorrespondence PWE 9/8/2009 (2) , i . ,,\ L1MBIRD Andrew . . From: Sent: To: Cc: Subject: Attachments: STOUDER Matt Tuesday, September 08,200910:55 AM BOYATT Tom; DONOVAN James L1MBIRD Andrew; DRISCOLL Jon; VOGENEY Ken; MCEACHERN Clayton FW: traffic flow on Chan site 1182-traffic.pdf; ATT00001.txt All, After talking with Andy, DSD would be ok with accepting these changes at the time of Final Site plan, and not requiring a modification to the site plan tentative (since the changes were City requested). This new circulation design alleviates most of Transporation's concerns, and allows better functionality of the site. Jon - please coordinate with Andy regarding implementation, construction and communication with the engineer and developer. Thanks, Matt -----Original Message----- From: DRISCOLL Jon Sent: Friday, September 84, 2889 4:52 PM To: LIMBIRD Andrew Cc: STOUDER Matt; MCEACHERN Clayton; BOYATT Tom Subject: FW: traffic flow on Chan site Andy, Ric from Geomax sent this new site layout to me today, and I reviewed it briefly with Matt, Clayton and Ken. It looks much better from transportation point of view. Ken pointed out the implications of a site plan modification, so I thought I should give you a heads up before your meeting Tuesday. The lack of throat depth is a slight issues, but I believe I could live with this layout. Sincerely, Jon Jon Driscoll EIT, .PLS, WRE Transportation Engineer in Training City of Springfield, Public Works 225 Fifth Street Springfield, OR 97478 Phone: (541) 726-3679 Fax: (541) 726-3781 idriscoll~ci.sDringfield.or.us -----Original Message----- From: Ric Christian [mailto:ric@geomax.us] Sent: Friday, September 84, 2889 3:12 PM To: DRISCOLL ion Subject: traffic flow on Chan site Jon: Date Received:Y4~1 Planner: AL 1 \ , .. These are the changes we are~OPOSing in order to allowable c~ulation on the Chan site for a 30' single unit truck. This will certainly' be the largest vehicle on the site other than fire apparatus. No change 1s proposed for the fire apparatus hammerhead turn around. (. This plan is based on AASHTO Exhibit 2-4, A Guide for Highway and Street Design. I have changed the size'and configuration of the building slightly to accommodate traffic flow. I would also like to move the trash pick-up to the rear of the lot. The delivery spaces are'eliminated due to the loading area at the rear of the building. Please let me know if this meets with your satisfaction so I can change the site and grading plans. Ric Christian DatE! iteCeived:JfI4.., Planner: AL 7~ 2