All,
After talking with Andy, DSD would be ok with accepting these changes at the time of Final
Site plan, and not requiring a modification to the site plan tentative (since the changes
were City requested). This new circulation design alleviates most of Transporation's
concerns, and allows better functionality of the site. Jon - please coordinate with Andy
regarding implementation, construction and communication with the engineer and developer.
Thanks,
Matt
-----Original Message-----
From: DRISCOLL Jon
Sent: Friday, September 84, 2889 4:52 PM
To: LIMBIRD Andrew
Cc: STOUDER Matt; MCEACHERN Clayton; BOYATT Tom
Subject: FW: traffic flow on Chan site
Andy,
Ric from Geomax sent this new site layout to me today, and I reviewed it briefly with Matt,
Clayton and Ken. It looks much better from transportation point of view. Ken pointed out
the implications of a site plan modification, so I thought I should give you a heads up
before your meeting Tuesday.
The lack of throat depth is a slight issues, but I believe I could live with this layout.
Sincerely,
Jon
Jon Driscoll EIT, .PLS, WRE
Transportation Engineer in Training
City of Springfield, Public Works
225 Fifth Street
Springfield, OR 97478
Phone: (541) 726-3679 Fax: (541) 726-3781 idriscoll~ci.sDringfield.or.us
-----Original Message-----
From: Ric Christian [mailto:ric@geomax.us]
Sent: Friday, September 84, 2889 3:12 PM
To: DRISCOLL ion
Subject: traffic flow on Chan site
Jon:
Date Received:Y4~1
Planner: AL
1
\
,
..
These are the changes we are~OPOSing in order to allowable c~ulation on the Chan site for
a 30' single unit truck. This will certainly' be the largest vehicle on the site other than
fire apparatus. No change 1s proposed for the fire apparatus hammerhead turn around.
(.
This plan is based on AASHTO Exhibit 2-4, A Guide for Highway and Street Design.
I have changed the size'and configuration of the building slightly to accommodate traffic
flow.
I would also like to move the trash pick-up to the rear of the lot.
The delivery spaces are'eliminated due to the loading area at the rear of the building.
Please let me know if this meets with your satisfaction so I can change the site and grading
plans.