HomeMy WebLinkAboutPermit Occupancy 2010-10-15
"j,W..._. d_- .....~. ..............
I.M.. .... ·
~.:
City of Springfield
Building Permit & Inspection Summary
10/15/20 I 0
12:42:40PM
Job #:
COM2009-01581
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Job Address: 1820 MAIN ST Springfield
Scope of Work: Interior
Description of Work: Interior Remodel for Welbys Collision Center/
Change of Use and Occupancy
Name
ELC BEAR MOUNTAIN ELECTRIC LLC
ENG KEATING ENGINEERING
FIR GUARDIAN FIRE PROTECTION
LOW NEW REYNOLDS ELECTRIC INC
MEC COMMERCIAL AIR INC
OWN RIVER OAKS LLC
PLM BARNES H[GH TECH PLUMBING INC
Owner & Contractor(s)
Address
85388 DILLARD ACCESS R
159 E 16TH AVENUE
1012 SW A AVENUE
2175 W 2ND AVENUE
1665 IRVING RD
PO BOX 2266
2787 OLYMPIC #2
City, State, Zip
EUGENE OR 97405
. EUGENE OR 97401
CORVALLIS OR 97333
EUGENE OR 97402
EUGENE OR 97402
EUGENE OR 97402
SPRINGFIELD OR 97477-7841-726-9854
Phone
541-741-8844
541-242-0613
541-230-0292
541-343-7297
541-461-4821
Valuation of Proiect
Occupancy
Construction Tvpe
Cost Per Sq Ft Sq Ftl!
Date
Valuation Calculated Staff
Estimate
Estimate
$ 1.00
25,000.00
$25,000.00 2009/10/28
$25,000.00
DJB
Description
Amount Paid
Fees Paid
Date Paid
Receipt #
Plan Review Comm/Ind/Public
Add, Alter, Extend Cire
Add, Alter, Extend Circ Ea Add
+ 5% Technology Fee
+ 12% State Surcharge
Low Voltage - Commercial Indus
+ 12% State Surcharge
+ 5% Techno[ogy Fee
Mechanica[- Value
+ 12% State Surcharge
+ 5% Techno[ogy Fee
Deferred Submittal
Penalty Fee - BWOP Building
Miscellaneous Copy Chgs
Building Permit
Fixture
Minimum! Adjusttnenl Plumbing
+ 12% State Surcharge
+ 5% Technology Fee
FLS Safety Systems Review
***+ 10% Administrative Fee***
Temp Occy NEW C/I Base Fee
Temp Occy NEW C/I Base Fee
Total Amount Paid
$183.46
$55.00
$54.00
$5.45
$13.08
$58.00
$6.96
$2.90
$126.25
$15.15
$6.31
$342.00
$183.46
$4.00
$126.25
$19.00
$39.00
$44.13
$18.39
$165.00
$16.50
$252.00
$252.00
$1,988.29
10/28/2009
11/10/2009
11/10/2009
11/10/2009
11/10/2009
01/07/2010
01/07/2010
01/07/2010
02/08/2010
02/08/20 I 0
02/08/20 I 0
07/06/2010
07/06/2010
07/06/20 I 0
07/06/20 I 0
07/06/2010
07/06/2010
07/06/2010
07/06/2010
07/20/2010
07/20/20 I 0
07/20/2010
07/22/2010
1200900000000001200
1200900000000001252
1200900000000001252
1200900000000001252
1200900000000001252
1201000000000000023
1201000000000000023
1201000000000000023
2201000000000000116
2201000000000000116
220[000000000000116
1201000000000000798
1201000000000000798
'120 I 000000000000798
1201000000000000798
1201000000000000798
1201000000000000798
1201000000000000798
.1201000000000000798
1201000000000000831
1201000000000000831
. 2201000000000000848
2201000000000000861
[ of6
City of Springfield
Building Permit & Inspection Summary
10/15/2010
12:42:4IPM
Job #:
COM2009-01581
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Job Address: 1820 MAIN ST Springfield
Scope of Work: Interior
Description of Work: Interior Remodel for Welbys Collision Center/
Change of Use and Occupancy
Plans Reviewed
Department Received Due Date Completed Result Reviewer Comments
Planning Review 11/02/2009 WE EMM Needs submittal ofMDS and
DWP applications.
Initial Review 11/02/2009 11/02/2009 APP LLH
Structural Review 11/02/2009 11/06/2009 WE CJC Need plans for dumpster
enclosurel deferred submittal
for paint booth.
Structural Review 12/24/2009 12/24/2009 WE RWC spoke with Liz Miller about
what thte contractor needs to
do before perrnitscan be
issued DWP and MDS ( as of
12/24/09 contractor has not
submittted yet)
Note contractor has a current
electrical which allows them
to work on electrical.
CONTRACTOR HAS
INSTALLED WALLS FOR
CONSTRUCTION
Structural Review 01/05/20 I 0 01/05/2010 10 CJC Called Keating engineering
regarding deferred submittals,
left message
SUB Review 01/11/2010 01/19/2010 APP IF No inspections required
Structural Review 02/09/2010 02/09/2010 10 CJC Recieved. revised floor and
site plans for review
Structural Review 02/10/2010 02/1 0/20 1 0 WE CJC Applicant yet to provide
details for:
I) Listed Spray booth,
suppression system and
mechanical ventilation.
2) Details for capture of
combustible dust from
sanding operations.
3) HMMP, MSDS, HMIS for
storage and use of hazardous
materials.
4) Details for storage of
combustible waste containers
exceeding 1.5 cubic yards.
Public Works Review 03/09/20 I 0 03/10/2010 APP LKW
20f6
..-.N....'~ft,iiJ
ittJ'i
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Planning Review
Fire Department Review
Strucbural Review
Fire Department Review
Inspections
Final Electric
Final Site Plan
Gas Service
Final Building
Site Inspection
Site Inspection'
Rough Electric
Rough Electric
Rough Electric
Low Voltage
Site Inspection
Site Inspection
Low Voltage
03/31/2010
11/0212009
07/0612010
07119/2010
,
City of Springfield
Building Permit & Inspection Summary
10/15/2010
12:42:41PM
Job #:
COM2009-01581
Job Address: 1820 MAIN ST Springfield
Scope of Work: Interior
. Description of Work: Interior Remodel for Welbys Collision Center/
Change of Use and Occupancy
03/31/2010 APP
04/0812010 OK
07/06/2010 APP
07119/2010 APP
Inspections Conducted
Comments
CONTRACTOR WORKING
WITHOUT PERMITS
Can Not perform electrical
inspection until building permits
have been issued. I notified Chad
with Be~r Mountain Electric.
This inspection was for the office
walls only. There is a damaged
me cable that needs to be replaced
. And nail plates are needed
Ok to cover office walls
Ok to cover office walls
ree M.D.S. for planning no issues,
still no deferred submitials
investigate work on site( building
is drywalled and painted) ready to
occupy
Omni corn
30f6
EMM
to be constructed per MDS
decision and Final Plot Plan
DRC2009-00053. Please Call
Steve Hopkins at
541-726-3649 for Final Site
Inspection. PLEASE GIVE
48 HOURS NOTICE.
See attached document for
fire department plan review
comments.
Site inspection to verify code
compliance of
as-built/installed equipment
and elements. Use of structure
began prior to permit
issuance.
See attached document for
Fire Department Plans
Review conunents for the
paint booth and mixing room
dry chemical suppression
system.
MF
CJC
GRG
Date
Result
Inspector
12/04/2009
10
RWC
12/08/2009
IRC
BAR
01/06/2010
NOK
GAD
01/08/20 I 0 POK GAD
01/0812010 OK GAD
01/21/20 I 0 10 RWC
01/2512010 10 RWC
01/28120 I 0 OK GAD
~~~~~_..... ..'
r.It.... .. ..
..' ..
.. _On __._.~ .'_...._.'L.
City of Springfield
Building Permit & Inspection Summary
10/15/2010
12:42:41PM
Job #:
COM2009-01581
Job Address: 1820 MAIN ST
Scope of Work: Interior
Description of Work: Interior Remodel for Welbys Collision Center/
Change of Use and Occupancy
02/19/2010 10
02/23/20 I 0 POK
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Site Inspection
Final Electric.
spoke with owner about permits
This inspection took place on
2/22/20 I 0 The electrical final is
for the office portion only
met owner about the need for the
plans for the paint booth
owner to provide the city with
details for paint booth and
exhaustr system
Site Inspection
Site Inspection
Site Inspection
issued stop work in areas that did
not have permits (warehouse area)
1) disconnect gas line to provide
pressure test
2) provide access to rooffor
temination of exhaust ducts
3) tie off exhaust ducts with ties
back to the roof
4) seal all ducts with approvide
listed DU81
5) provide exhaust make up air
disconnect gas line from units to
provide pressure test for 2 PSi
no pressure test
investigate if owner still working
in back part of unit
2nd inspection of the day
Rough Mechanical
Rough Gas
Gas Service
Site Inspection
Final Mechanical
Rough Gas
Part ok
1) need to provide 10 feet from
the exhaust to the intake
2) provide a gas line pressure test.
no gas line pressure of 60 Ibs for
30 min
provide pressure test
Final Gas
Final Mechanical
05/14/2010
OS/20/2010
07/06/20 I 0
,
07/08/20 I 0
07/08/2010
07/08/2010
07/09/2010
07/20/20 I 0
07/20/2010
07/20/20 I 0
07/20/20 I 0
WE
IO
10
NOK
NOK
NOK
10
POK
NOK
NOK
NOK
Springfield
RWC
GAD
RWC
RWC
RWC
RWC
RWC
RWC
RWC
RWC
RWC
RWC
RWC
40[6
WiL'.r.4".~."..'\!IJ.~.'. _. ".... i
'."
i.., !
,:"" ,.'
City of Springfield
Building Permit & Inspection Summary
10/15/20 I 0
12:42:4IPM
Job #:
COM2009-01581
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Issued
Final Electric
Job Address: 1820 MAIN ST
Scope of Work: Interior
Description of Work: Interior Remodel for Welbys Collision Centerl
Change of Use and Occupancy
07/20/20 I 0 NOK
Springfield
Final Electric
Fire Dept Other
First trip today, Install a ko seal
in the 4,square box above the
paint room.
All conduit needs and armored
cable needs to be secured
Gasket and seal the First four light
fixtures in the paint booth
Remove the romex on top of the
paint booth and replace with a
approved wiring method
Secure armord cable at the exit
lights
Interlock the mag starter for the
paint booth exhaust fan with the
paint sprayer.
2nd trip today
(Inspection conducted on
7120/20).
Paint Booth Dry Chemical
Suppression System Acceptance
Test. Job #COM2009-01581.
GAD
07120/2010
07/21/2010
OK
OK
GAD
GRG
Paint Booth:
Nitrogen blow-off: OK for all
work areas, ducts and plenums.
Manual pull station: OK. Fan shut
down-OK.
Link cut: OK. Fan shut down-OK.
Manual re-set: OK.
Mixing Room:
Nitrogen blow-off: OK. Link cut:
OK. Fan shut-down: OK.
Manual pull: OK.
Alarm bells required to be
installed meeting NFPA 33.
(Alarm horns substituted-OK.
GRG)
Fire Dept Temporary Occy
Paint Booth Suppression System:
APPROVED.
(Inspection conducted on
7/20/10).
Fire Temporary Occupancy
Inspection. Job
#COM2009-0l58 1. APPROVED.
meet owner about the need to pay
fees due.
07/21/20 I 0
OK
GRG
Final Building
07/22/20 I 0
10
RWC
Mark paid fees late PM
50f6
4~-;tQ~~.-~.,,,, ,....[
~i
...... i
City of Springfield
Building Permit & Inspection Summary
10115/20 I 0
12:42:4IPM
Job #:
COM2009-01581
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Site Inspection
Job Address: 1820 MAIN ST
Scope of Work: Interior
Description of Work: Interior Remodel for Welbys Collision Center/
Change of Use and Occupancy
08/0212010 10
Springfield
Project Status: Issued
Site Inspection
investigate vision fencing (NOT
READY)
sight fence not installed
RWC
08/0312010
10
RWC
60f6