HomeMy WebLinkAboutPermit Building 2010-10-15
ilirjlj 10/15/2010
City of Springfield 2:01:08PM
Building Permit & inspection Summary Job #:
COM2009-01778
225 Fifth Street
541-726-3753 Phone Job Address: 3841 EST SPRINGFIELD
541-726-3676 Fax Scope of Work: Single Family Residence
Project Status: Deferred Payment Description of Work: Single family residence
-***********DP A **********
Owner & Contractor(s)
Name Address City, State, Zip Phone
CON BANYAN CONSTRUCTION LLC 3419 VIDERA DR EUGENE OR 97405 541-434-1333
ELC HARDING ELECTRIC INC 3039 WINTERCREEK ST EUGENE OR 97405 541-688-5006
ELC STEVE HAUCK 828 SOUTH 46TH STREET SPRINGFIELD OR 97478 541-221-2665
MEC LOWES WEATHERIZATION POBOX 21337 EUGENE OR 97402 541-485-2282
OWN KLM CAPITAL INC 9712 SW ALABAMA ST TUALATIN OR 97062
PLM T & S PLUMBING INC PO BOX 42274 EUGENE OR 97404 541-915-1000
Valuation of Proiect
Date
Occupancy Construction Type Cost Per SQ Ft SQ Fte: Valuation Calculated Staff
Estimate Estimate $ 1.00 179,000.00 $179,000.00 2009/12/14 DJB
SF/Duplex R-3 VB 1&2 Family $ 96.83 1,301.00 $125,975.83 2009/12/14 CJC
Garage/Misc U VB Utility $ 37.72 237.00 $8,939.64 2009/12/14 CJC
$313,915.47
Fees Paid
Description Amount Paid Date Paid Receipt #
SDC MWMC Reimbursement $101.97 12/16/2009 1200900000000001338
SDC MWMC Improvement $1,044.54 12/16/2009 1200900000000001338
SDC MWMC Administration $10.00 12/16/2009 1200900000000001338
Total Amount Paid $1,156.51
Plans Reviewed
Department Received Due Date Completed Result Reviewer Comments
Planning Review 12/14/2009 APP DDK
"'PLAN REVIEW'"
Public Works Review 12/14/2009 12/14/2009 APP LKW Roof runoff from Lots 3 will
be directed to the existing city
stormwater system through an
8" stormwater pipe in the
j9int utility trench.
Structural Review 12/14/2009 12/15/2009 APP CJC As noted on plans
Inspections Conducted
Inspections Comments Date Result Inspector
Final Building
Final Plumbing
Final Mechanical
lof4
'1.......~_.....~.'.....,.',
Ilk: 'I
,. . I
,.WW.. ,
City of Springfield
Building Permit & Inspection Summary'
10/15/2010
2:01 :08PM
Job #:
COM2009-01778
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Job Address: 3841 E ST SPRINGFIELD
Scope of Work: Single Family Residence
Description of Work: Single family residence
-***********DP A **********
Project Status: Deferred Payment
Drywall
Erosion/Grading Inspection
Stom1 Sewer Line
Framing Inspection
Wall Insulation
Ufor Electrical Ground
Footing
Foundation
Temporary Electric
en.
l.NEC250.50:Can not find
ground rod.
2.No plans on site.
I) provide anchor bolts within 12
inches of the end of the sill plate.
ORSC R403.1.8.1
2) provide underfloor access to all
locations under floor ORSC R
408.3
3) provide 1/2 inch clearance
from wood to concrete ORSC R
502
4) NOte plumbing not complete
Post and Beam
Underfloor Plumbing
Underfloor Mechanical
Underfloor Mechanical
Temporary Electric
Post and Beam
Floor Insulation
called sub. correction made.
correction cocmplete
contractor requested second
inspection not ready in late
. afternoon
Underfloor Plumbing
Floor Insulation
Rough Plumbing
Rough Mechanical
remove mechanical duct from
under stairs fill in hole in wall
then reduct
renail all shear wall s that have
Over driven nails
Shear Wall Nailing
All shear walls to be nailed at 6
inches on center on the edges and
12 inches in the field
12/17/2009
12/17/2009
12/17/2009.
12/18/2009
OK
OK
OK
NOK
RWC
RWC
RWC
BAR
12/22/2009
NOK
RWC
12/22/2009 NR SKG
12/22/2009 OK SKG
12/22/2009 OK RWC
12/23/2009 OK BAR
12/23/2009 OK RWC
12/23/2009 NR RWC
12/23/2009 OK SKG
12/24/2009 OK RWC
02/02/2010 NR RWC
02/02/20 I 0 NOK RWC
02/02/2010 NOK RWC
20f4
ap.,A~I~~.F;~m~iii ...... i
Wil: ..,
l' . .
. I
....:. !
City of Springfield
. Building Permit & Inspection Summary
10/1512010
2:01:08PM
Job #:
COM2009-01778
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Deferred Payment
Job Address: 3841 EST SPRINGFIELD
Scope of Work: Single Family Residence
Description of Work: Single family residence
-***********DP A **********
Framing Inspection
I) provide window flashing
2) provide attic access of 22x30
3) provide moisture conlnet letter
4) provide details for cut floor
joist, or r~place with new one
where plumbing has removed the
top plate
5) strap top plate where removed
by plumbing or electrical
6) provide trusses clips on all
trusses
7) replace studs at electrical panel
where more thau 40% of the stud
has been removed
8) replace interior barring wall at
the kitchen! stairs with 2x6 studs
( note plumbing has bored a 2
inch hole in a 2x4 wall) only
leaving 1/2 inch on each side
9) fix stud where mechanical duct
has removes studs under stairs
10) plumbing not ready/ electrical
still setting boxes
Hold Downs Installed
Rough Electric
Shear Wall Nailing
Low Voltage
Post and Beam
Exterior
Underfloor access provided
2/3/10
correction complete
moisture content letter see file for
details
corrections complete
moisture content letter see file
Left correction notice: I.Please
install long 90 degree fitting on
kitchen sink vent and slope 1/4
inch per foot toward drain where
located below 6 inches above
flood rim of sink(904 OPSe)
2.Provide minimum 30 inch wide
finish clear floor space for master
water closet.( 407 OPSe)
3.Fasten master shower enclosure
to framing every 8 inches on
verticle flanges using roofing nails
or pan head screws.(31 0, 314
OPSe)
corrections complete
Post and Beam
Framing Inspection
Rough Mechanical
Framing Inspection
Rough Plumbing
Framing Inspection
02/02120 I 0
NOK
RWC
02/02/20 I 0 OK RWC
02/03120 I 0 OK BAR
02/03120 I 0 OK CJC
02/03120 I 0 OK BAR
02/0412010 POK CJC
02/04120 I 0 OK RWC
02/04120 I 0 10 RWC
02/04120 I 0 OK RWC
02/04/2010 OK RWC
02/04/2010 POK SKG
02/04/20 I 0
OK
RWC
3 of 4
,!~~.....-'......!....
1..-..
... .:
City of Springfield
Building Permit & Inspection Summary
10/15/2010
2:01 :08PM
Job #:
COM2009-01778
225 Fifth Street
541-726-3753 Phone
541-726-3676 Fax
Project Status: Deferred Payment
Job Address: 3841 EST SPRINGFIELD
Scope of Work: Single Family Residence
Description of Work: Single family residence
-***********DP A **********
Rough Plumbing
Wall Insulation
inspectioon completed 2/8/20 I 0
Framing Inspection
provide vapior barrior letter
inspectioon completed 2/8/2010
Electric Service
Water Line
Sanitary Sewer Line
Water Line
Final Plumbing
hold downs complete
Called Sub
Storm Sewer Line
Final Electric
Left correction notice: I.Please
complete storm. sewer connection
to building.(31 0 OPSe)
2.Relocate pressure reducing
valve to above ground
location.(608.20PSe) 3.Secure
dishwasher to countertop.(31 0
OPSe) 4.Provide two seismic
water heater straps, one within top
1/3 of tank and one within bottom
1/3 oftank.(508 OPSe)
Around building O!,-
02/05/20 I 0 OK SKG
02/09/20 I 0 POK RWC
02/09/20 I 0 OK RWC
03/24/20 I 0 OK GAD
05/13/2010 CWO! SKG
05/13/2010 OK SKG
06/22/20 I 0 OK SKG
06/22/20 I 0 NOK SKG
06/22/2010
06/29/20 I 0
POK
NR
SKG
GAD
4 of 4