Report of Inspection Services
Welding/High-Strength Bolting
Client: Mr. Dennis Boyd Project:
HVAC & Metals Institute
2379 NE 178"' Ave.
Portland, Oregon 97230
Sheet Metal Institute
'1887 Laura Street
'Springfield, Oregon
Date:
Project No.:
Report No.:
Inspector:
10 No.:
09-20-10
2107115
E-26679
C. Walpole
01040131
AWS CWI
Field: 0
Inside
COM 2010-00799.
Inspection of: Welding
Fabricator or Erector: Gibson Steel
Contractor: McKenzie Commercial
Shop: It!
Weather:
BPNo.:
Performed visual inspection on four (4) fabricated pipe columns with base plates and buckets. Completed
welds were checked for size, length, profile and location.
Gentry (Gibson Steel) was asked to notify our office when additional services are needed.
To the best of our knowledge, the work checked is in conformance with shop drawings dated 09-13-10
and applicable AWS 01.1 code, except if noted above. - .
.,.
. '" '", ~,.n _,~.. _ _"_.n .~..., _
. . -. -- '.... . ~ ,.,.,-
Reviewed By: .
" . .-.,'.
fh ."7, f),....___
Michael L. ~eye(
Technical Manager
c:
Robertson Sherwood Architects - Randy Nishimura (email)
McKenzie Commercial- Bill Henderson (email)
City of Springfield
MLM:sc
'..
R~C~
S(p < IV~D
12010
,;
.......
,
,
This report and/or endosed test data is the confidential property of the dient to whom it is addressed and pertains to the specific
process and/or matertal evaluated. As such, information contained herein shall not be reproduced tn part Of full and/or any part
the~of be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
750 NWComelIAvenue' CorvaRis, Oregon 97330, phone (541) 757--1698. fax (541) 757-2991
29540 B Airport Road . Eugene, Oregon 97402. phone (541) 684-3849, fax (541)684-3851
62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 3824844, fax (541) 382-4846
&FEI
Page 1 of 1
TEITlIIG K IINECfIOII IlIl
Geded u IicaI & Consln.dial Services
Daily Field Report
Client: Mr. Dennis Boyd Project: Sheet Metal Institute Date: 09-21-10
HVAC & Metals Institute 1887 Laura Street Project No.: 2107115
2379 NE 178th Ave. Springfield, Oregon Report No.: E-26692
Portland, Oregon 97230 Inspector: A. Fenstermacher
10 No.: 5258882-49
ICC
Inspection of: Screw Anchors Weather: Inside Continuous Inspection: 0
Contractor: McKenzie Commercial BPNo.: COM 2010-00799 Periodic Inspection: 0
Performed continuous inspection during the installation of one-hundred sixty (160) 5/8"
x 4" vertical Simpson Titen-HD screw anchors (ICC - ES ESR 1056) into concrete slab
on grade for sill plate attachment at interior partition walls. The predrilled holes were
drilled at least 1" deeper than required embedment depth of 2 3/4". Anchors were
tightened to a snug-tight condition with a Milwaukee 3/4" impact driver.
To the best of our knowledge, the work inspected was in accordance with RFI 3 dated
08-19-10, RFI 8 dated 09-14-10 and applicable workmanship provisions of the I.B.C.,
except if noted above.
Reviewed By:
IA . 'I. fJuy--
Michael L. Meyer
Technical Manager
c:
Robertson Sherwood Architects - Randy Nishimura (email)
McKenzie Commercial- Bill Henderson (email)
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the
specific process andlor material evaluated. As such, information contained herein shall not be reproduced in part or full
and/or any part thereof be disclosed wtthout FEI Testing & Inspection, Inc. 's written authorization.
750 roNV Cornell Averue 'CorvaIIis; Oregon 9733O'phone (541) 7574698 .fax (541) 757-2991
29540 BAirportIbld 'Eugene, Oregon 97402'phone (541) 6ll4-3849.fax (541) 684-3851
62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 382-4844, fax (541) 382-4846
:
&FEt
Page 1 of 1
][\T11IGI.III\PECTIOIIIIK
GeoIechnicaI & ConsbucIion SeM:es
Daily Field Report
Client: Mr. Dennis Boyd Project: Sheet Metallnslitute Date: 09-15-10
HVAC & Metals Institute 1887 Laura Street Project No.: 2107115
2379 NE 178'" Ave. Springfield, Oregon Report No.: E-26653
Portland, Oregon 97230 Inspector: A. Fenstermacher
10 No.: 5258882-49
ICC
Inspection of: Epoxy Dowels Weather: Inside Continuous Inspection: 0
Contractor: McKenzie Commercial BPNo.: COM 2010-00799 Periodic Inspection: 0
Met on-site with Bill Henderson (McKenzie Commercial) to observe the installation of
#4 dowels into existing concrete slab and CMU wall for connection of welding booth
CMU wall. Advised by Mr. Henderson that vertical dowels will be installed into concrete
slab at an embedment of 3"+ and horizontal dowels into solid grouted CMU walls will be
- installed.atan.embedment.of 6". using Hilti Hit RE500SD epoxy (ICC - ES ESR 2322/ .
expiration.date.0712011):' Horizontal dowels into hollow,CMU.bI09k .will.b~ installed
" using' Hilti'Hy'20'(ICC '::"ES'ESR'2659/ expiration'date 04/2011). and screen tubes. .
0'''; Observed'the'installation ofsixtY:One.(61) #4 x"36" vertical 'dowels into concrete'slab.:
Prior to installation, the predrilled holes were cleaned with compressed air and a brush.
Note: no minimum embedment stated. Horizontal dowels are to be installed as CMU
construction progresses.
To the best of our knowledge, the work inspected was in accordance with plans dated
06-21-10 and applicable workmanship provisions ofthe I.B.C., except if noted above.
Reviewed By:
A.~~
Michael L. Meyer
Technical Manager
c:
Robertson Sherwood Architects - Randy Nishimura
McKenzie Commercial - Bill Henderson
City of Springfield
MLM:sc
. ;,:f<.:i; '. _, C ;.:'.'. .::~. . ...........:;::-.. ,... _ . '. : ':'.. ::-; .:J ::-:;'. ..; -:-., ,.... .. ~
~: ~;.....:. ~.D r:e'- ..;: ~;"':' . :"C ':;, ':::-';': .! 'J':'~:: . ,',,'5 ('1<::", _f!\. :. ... ',i...'...:' ='t:.. ~.... .~ ;". ~ ".!C :: : ~-.:.;'
" -=..,"-:.~ ',- ,"".-, ", --,... ".' ~.,~ .~. .
This report and/or en~lose(ftest data is the _confidential property"ofihe clle'rit'io'whom it'ls address6dl'ariifpertains to the
specific-process 'arid/or, material evaluated, -'As such. information contained hereln'shall notbe:reproduced in part or full
~,:" and/or anypaf! th!lreof be disclosed withouq:EI:Tes~ing:& .Inspectlo.n, lnc.'s~written a.uthoriza~on. . i
. 750 rm ComeIJ Averue 'CorvaIIis, 0regJn 97330 -pinna (541) 757-4698 .fax (541) 757-2991
29540 BAirportPDad 'Eugere, Oregon 97402.phone (541) 684-J849.fax (541) 684-3851
62979 NE Plateau Drive, Suile3. Bend, Oregon 97701 . phone (541) 382-4844, fax (541) 382-4846
RtCt
S[p.2 IV-tD
.2 l(j/(j
&FEI
Page 1 of 1
TEITlilGK IIIIPECTIOlIIIIC
Geded u IicaI & Ca1slrudion SerI.1ce;
Daily Field Report
Client: Mr. Dennis Boyd Project: Sheet Metal Institute Date: 09-16-10
HVAC & Metals Institute 1887 Laura Street Project No.: 2107115
2379 NE 178'" Ave. Springfield, Oregon Report No.: E-26663
Portland, Oregon 97230 Inspector: M. Meyer
10 No.: 0877905-84
ICC
Inspection of: Masonry Weather: Inside Continuous Inspection: 0
Contractor: McKenzie Commercial BPNo.: COM 2010-00799 Periodic Inspection: 0
Met on-site with Bill Henderson (McKenzie Commercial) and Greg (Davidson's
Masonry) to review project masonry specifications and inspect in-progress 8" CMU
masonry construction of weld booth wing walls and door infill wall on west side. of booth
area. Currently, all weld booth walls are being constructed and are at varied heights
ranging from :t3' to 8'. Installed rebar was checked for size, length, spacing, quantities,
grade and laps, where applicable. Cells were relatively clean, and free of excessive
mortar projections. Advised by Mr. Henderson that walls will be grouted solid in one (1)
lift and City of Springfield inspection has waived requirements for clean-outs at base of
reinforced cells. Masonry material testing requirements will be verified with design
team.
To the best of our knowledge, the work in-progress was in accordance with prints dated
06-21-10 and applicable workmanship provisions of the I. B. C., except if noted above.
Reviewed By:
Ih. -;(.~
Michael L. W:e&
Technical Manager
c:
Robertson Sherwood Architects - Randy Nishimura
McKenzie Commercial - Bill Henderson
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the
specific process and/or material evaluated. As such. Information contaIned herein shall not be reproduced in part or full
and/or any part thereof be disclosed without FEI Testing & Inspection, Inc. 's written authorization.
750 MN ComeII Awrue 'COrVaJ&S, Oregon 97330 'prone (541) 757-4698 .fax (541) 757-2991
29540 BAirportFbad '1iJgele, Oregon 97402'prone (541) 684-3849'fax (541) 684-3851
62979 NE Plateau Drive, Stile 3, Bend, Oregon 97701 . phone (541) 362-4844, fax (541) 362-4846
~.....~
~rtl
Page 1 of 1
TEITING & INIPEGlOtI, INC
GeoIEd1nicaI & Construdion Services
Daily Field Report
Client: Mr. Dennis Boyd Project: Sheet Metal Institute Date: 09-20-10
HVAC & Metals Institute 1887 Laura Street Project No.: 2107115
2379 NE 178th Ave. Springfield, Oregon Report No.: E-26676
Portland, Oregon 97230 Inspector: D. Delatte
ID No.: 1 080867 ~84
ICC
Inspection of: Masonry Weather: Inside Continuous Inspection: 0
Contractor: McKenzie Commercial BP No.: COM 2010-00799 Periodic Inspection: 0
Performed final inspection on the reinforcing steel in 8" CMU walls for new welding
booths, door infill west of welding booth, infill in rooms 112 and 108A (slab to top of
walls except for infills). Contractor stated last course of infills will be "slugged" with
mortar. Reinforcing steel was checked for grade, size, lap, placement, quantities and
clearance, where applicable. Reinforced cells were relatively clean and free of
excessive mortar projections.
. Observed the placement of 7.5 yards of Knife River 7.5sk grout (mix 247KG3R200) for
. walls noted above. G'rout was placed by pump and was mechanically consolidated.
Slump - 8"+; air temperature - 60F; grout temperature - 69F.
To the best of our knowledge, the work inspected was in accordance with plans dated
06-21-10 and applicable workmanship provisions of the I.B.C., except if noted above
Reviewed By:
/A.'-{~ ~
ric~~el L (:eyir
Technical Manager
c:
Robertson Sherwood Architects - Randy Nishimura
McKenzie Commercial - Bill Henderson
City of Springfield
MLM:sc
This report" and~or enclose~ test data is the confidential property of the client to whom"itis' addressed and pertain~ to the
specific process and/or material evaluated. As such. information contained herein shall not be reproduced in part or full
and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
750 NW ComelJ Averue 'Corvallis, Oregon 97330 'phone (541) 757-4698 .fax (541) 757-2991
29540 B Airport Road 'Eugene, Oregon 97402 'phone (541) 684-3849 .fax (541) 684-3851
62979 NE Plateau Drive, Sutte 3. Bend, Oregon 97701. phone (541) 3824844. fax (541) 382-4846