HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2010-10-7 Carlson Testing, Inc. Bend Office Geotechnical Office Eugene Office Salem Office Tigard Office (541) 330-9155 (503) 601-8250 (541) 345-0289 (503) 589-1252 (503) 684-3460 Daily Report of Structural Steel Client: GOODWILL INDUSTRIES Project: GOODWILL - SPRINGFIELD Address: 514 Q STREET - SPRINGFIELD OR Jurisdiction: CTIrepresentative C. HALSTEAD DBOA 448 was on site this date Oct. 04, 2010 to perform Special Inspection for: Permit SPR2010-105 DFS #(s) en Job #: SPRINGFIELD E1001113. PO Number: SCOPE OF INSPECTION I. Work inspected was: GJ Completed D In progress 2. Completed work inspected was in compliance with [Xl Approved plans and specifications 0 Shop drawings D RFI 0 Design change D Submittal D N/A Docwnent #(s) A4 .1 Dated: 8(18(10 3. Noncompliance item(s) were noted this date, details on following pagels). DYes D No GJ N/A 4. Nottcompliance item(s) were reinspected this date, details Yes No N/A on following pagels). DYes D No GJ N/A D Confonn D Remain in progress ] . Checked in with superintendent, client or shop rep. Name: MARVIN Company: GOODWILL 2. Inspection was "IBC" D Continuous GJ Periodic 3. Work performed: GJ In the field D At fab shop 4. If shop inspection do they have fabrication and QC procedures? DYes D No GJ N/A INSPECTION Yes NoN/A 1. Reviewed previous inspection reports'! X 2. Verified steel materials are in compliance by reviewing random samples of the mill test reports, steel ID X markings or other documentation. 3. Verified weld filler materials conform. X 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and X tolerances required. 5. Checked welded studs and structural connections were installed as required. X 6. Verified high strength holts and fasteners conform. X 7. Verified the quality of welds produced by welders, welding operators, and tackers confonn. X 8. Verified steel frame joint details for bracing, stiffening, member locations, and application of joint details at each X connection are in compliance by random sampling. WELDER INFORMATION \\ielders Name: MARK GREENFIELD Cenification #: 93 0 5 l. Verified the contractor's Welding Procedure Specifications are in confonnance with X A WS requirements. 2. Verified the essential variables outlined in the Welding Procedure Specifications were X employed during execution of the work. 3. Verified the we1dabilitv of reinforcing steel other than ASTM A 706. ' X D See additional repon pagels). D Distribute attachments. Location of steel inspection [to include grid lines, elevations (floors) and drawing details]: PERFORMED PERIODIC VISUAL INSPECTION OF SINGLE .PASS FILLET WELDS ON NEW REAR DOOR JAM. WELDMENTS WERE DONE USING SMAW PROCESS WITH E7018 ELECTRODES REPORT SUMMARY Repon(s) findings were discussed and left with of Based on the Code, approval is required from the Building Official before the SPECLAL INSPECTED items noted above can be cOvered. Carlson Testing has no authority to direct work of contractors or subcontractors. Page _of _ Daily Report of Structural Steel CTI Job #: E1001113. For: 10/04/2010 Project: GOODWILL - SPRINGFIELD Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in Ii without prior authorization from this office. Under all circumstances, the information contained in this report is provide subject to all terms and conditions ofCTl's General Conditions in effect at the time this report is prepared. No party oth r than those to whom CTl has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Reviewed By: Steven Dugger Review Date: 10/07/2010 CH/KMF GOODWILL INDUSTRIES TO: CITY OF SPRINGFIELD x Carlson Testing, Inc. Bend Office Geotechnical Office Eugene Office Salem Office Tigard Office (541) 330-9155 (503) 601-8250 (541) 345-0289 (503) 589-1252 (503) 684-3460 Daily Report of Proprietary Anchors Client: GOODWILL INDUSTRIES Project: GOODWILL - SPRINGFIELD Address: 514 Q STREET - SPRINGFIELD OR Jurisdiction: cn representative S. DAUGHTRY OBOA 658 was on site this date Sep. 30, 2010 to perform Special Inspection for: Penmt SPR2010-105 DFS#(s) cn Job #: E1001113. SPRINGFIELD PO Number: SCOPE OF INSPECTION 1. Checked in with superintendent or client representative. Name: RICK Company: GOODWILL 2. Inspection was !lIBe" [i] Continuous D Periodic PROPRIETARY ANCHORS Yes NaNIA I 1. Reviewed previous inspection reports? I 2. Reviewed evaluation report? I I I X I Verified following items meet manufacturer's published installation instructions. 3. Verified minimum embedment depth of the anchors. x 4.Verified installation of the anchors. X 5. Verified anchor diameter. x 6. Verified steel grade. x 7. Verified hole diameter. X 8. Verified type of drill bit used. x 9. Verified hole cleaning method. x 10. Verified adhesive application. x 11. Verified edge distance. X 12. Verified spacing. X 13. Verified installation torque. x Evaluation report number & date: ESR 1772 Name of product being installed SIMPSON SET PAC EZ Batch Number 161X190X Expiration Date 11/30/11 Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details): (2}s/s"X24" ALL THREAD INSTALLED VERTICALLY FOR HDUB-SDS2.8 HOLD DOWNS INTO EXISTING CONCRETE. PSI lmKNOWN AND THICKNESS UNKNOWN ON THE SOUTH BATHROOM WALL x REPORT SUMMARY 1. Work inspected was: GJ Completed D In progress 2. Completed work inspected was in compliance with GJ Approved plans and specifications D Shop drawings D RFI D Design change D Submittal D N/A Document #(s) A-3.1 Dated: 8/18/10 3. Noncompliance item(s) were noted this date, details on following pagers). DYes D No GJ N/A 4. Noncompliance item(s) were reinspected this date, details on following page(s). DYes D No GJ N/A D Conform D Remain in progress Report(s) findings were discussed and left with of Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. D See additional report pagers). D Distribute attachments. Page _of_ Daily Report of Proprietary Anchors CTI Job #: E1001113. For: 09/30/2010 Project: GOODWILL - SPRINGFIELD Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in n without prior authorization from this office. Under all circumstances, the information contained in this report is provide subject to all tenus and conditions of CTI's General Conditions in effect at the time this report is prepared. No party oth r than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INe. Reviewed By: Steven Dugger Review Date: i 0/07/2010 SD/KMF GOODWILL INDUSTRIES TO: CITY OF SPRINGFIELD x