Loading...
HomeMy WebLinkAboutPermit Building 2000-1-31 -~ .... ~'. .~ I Job# 00-00077-01 I Page 1 of 4 TRANS#:01-0000421 DATE:JAN 31 2000 AMT RECD:2 $ 4137.84 CHANGE: CASHIER: 059 CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-00077-01 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location Of p'roposed Site: 3409 Watermark Dr Spr Assessors Map#: 17021943 Lot: 75 Block: Addition: Tax Lot #: 07500 Subdivision: Ambleside Owner: Address: Greg Larkin Po Box 2041 Phone Number: 541-726-2222 City/State/Zip: Corvallis, OR New Value: $118,760 Scope Of Work: Single Family Residence same as 3483 Watermark, LDAP already done Contractor Typ'e Contractor Registration # Expiration Date Phone General Contr Riyer Valley Builders 72942 4/15/2001 541-740-4370 PO Box 2041, Corvallis, OR 97339 Electrical Contr G&E ELECTRIC 541-967 -8627 PO BOX 1686, ALBANY, OR 97321 Mechanical Contr Midway Mechanical 04687 1/24/2000 541-928-2423 X,X,OR Plumbing Contr Midway Plumbing Inc 4687 7/25/2000 541-928-7927 2428 Three Lakes Rd Se, Albany, OR 97321-9781 Quad Area: # Of Units: Constr. Type: Water Heater: 3RNC 1 (V) Wood Frame Electric Office Use Land Use: Zoning Code: Bedrooms: Range: 3 Electric # Of Buildings: 1 Occupancy Group: Dwelling Heat Source: Forced Air Electric Sq. Footage: 1600 To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Verify Ground Rod Footing Foundation Post and Beam Floor Insulation Ceiling Insulation Shear Wall Nailing Roofing Required Inspections I Building I -Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation i -After trenches are excavated. - After forms are erected but prior to concrete placement. -Prior to floor insulation or decking. -Prior to decking. - Prior to cover. - Before covering sheathing with finish materials. - Prior to installing any roof covering. Street Improvement: Fully Improyed Curb Cut?EJ Improvement Agr.?D San Sewer Depth (Ft): 6 4 Storm Sewer Available? EJ Special Req.: Security Required: Bond Begin DateTime: 001001000000:00 A, Special Instructions: Other Utilities: Project Supervisor: Framing Wall Insulation Drywall Final Building Temporary Power Underfloor Plumbing Underfloor Drain Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Perimeter Foundation Drains Final Plumbing Underfloor Mechanical Rough Mechanical Final Mechanical I Job# 00-00077 -01 I Required Inspections Building Page 2 of 4 - Prior to cover. - Prior to Cover -Prior to taping. - When all required inspections have been approved and the building is complete. I Electrical I -Approval required prior to SUB energizing pole. I Plumbing -Prior to insulation or decking. - Prior to cover or placement of concrete. - Prior to cover. -Prior to filling trench. -Prior to filling trench. - Prior to filling trench. -After gravel and filter cloth is installed, but prior to backfill. - When all plumbing work is complete. I Mechanical -Prior to insulation or decking. - Prior to cover. - When all mechanical work is complete. Sidewalk Type: Additional ROW? Size Of Line (in): Downspouts/Drains: Enchroachment Permit: San Sewer ~ee (in): Bond End DateTime: Curbside - 5' D 8 To Curb and Gutter 6 00/00/000000:00 A Types Of Warning Devices Reqd. Zoning: FloodPlain? D Wetlands? D Journal numbers 1 : Comments: Planner: Urban Growth Boundary? 0 Quantity Of Fill: Supplier: Drainage: Floodway FEMA: ' Overlay District: # of Street Trees: Land Use: Pave Driveway? 0 2: 3: Additional Requirements: Glenwood Area? 0 Required Attachments: Source Locn: Material: Flood Plain FEMA: . Construction Types:(V) Wood Frame Occupancy Groups: Dwelling # Of Buildings: 1 # Of Bedrooms: 3 Handicap Access? 0 -Area (Sq. Feet) Main: 1600 Accessory)400 Fee Hourly Plan Review Total Plan Check Building Permit State Surcharge For Building Permit Building Administrative Fee Total Building Temporary: 200 Amps or Less State Surcharge For Electrical Permit Electric Administrative Fee Total Electrical Minimum Plumbing Permit Fee Two Bathrooms State Surcharge For Plumbing Permit . Plumbing Administrative Fee Total Plumbing Hood and Exhaust Minimum Mechanical Permit Mechanical Administrative Fee Less than 100,000 BTU Vent Fan to One Duct Dryer Vent Mechanical Issuance State Surcharge For Mechanical Permit Total Mechanical Residential - Single Family - Storm Sanitary Sewer Residential Transportation Residential Sanitary MWMC Residential Improvement MWMC MWMC Administrative Fee SDC Administrative Fee Property Annexed 1997 Total System Development Job# 00-00077 -01 Page 3 of 4 Accessory Structure # Of Stories: 1 Height (feet): 18 Current Units: 1 Proposed Units:1 Census Code: New SF - detached Total:2000 Paid On Receipt# Plan Check 01/31/2000 421 Value/Quantity 2 Building 01/31/2000 421 01/31/2000 421 01/31/2000 421 118,760 Electrical 01/31/2000 421 01/31/2000 421 01/31/2000 421 1 Plumbing 01/31/2000 421 01/31/2000 421 . 01/31/2000 421 01/31/2000 421 1 Mechanical 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 1 1 3 1 System Development 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 01/31/2000 421 2,371 18 1 1 1 1 36 Fee Amount $80.00 $80.00 $475.75 $33.30 $14.27 $523.32 $40.00 $2.80 $1.20 $44.00 $.00 $160.00 $11.20 $4.80 $176.00 $4.50 $.00 $.68 $6.00 $9.00 $3.00 $10.00 $1.58 $34.76 $550.01 $868.86 $491.60 $242.76 $22.05 $10.00 $108.56 $-14.08 $2,279.76 Fee SF Residence - Willamalane Total Willamalane SDC Grand Total Plan Check Type Initial Review-Res Engineering-Res Planning-Res Structural-Res Quick Start-Initial Revi Quick Start-Engineering Job# 00-00077-01 Page 4 of 4 Value/Quantity Fee Amount . Paid On Receipt# Willamalane SDC 01/31/2000 421 1 $1,000.00 $1,000.00 $4,137.84 Checked By Bob Barnhart Steve Templin AI Ward Tom Marx Bob Barnhart Steve Templin Date Completed 01/26/2000 01/26/2000 01/27/2000 01/31/2000 01/26/2000 01/26/2000 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the s t, that the ermit card is located at the front of the property, and the approv~~ of plans will re in n the si at all times during construction. (r/7#A /-?/--d? 'signa(ut/ L-- / Date