Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-3-3 t/&,C) ,-. .] SPRINGFIELD , RESIDENTIAL PERMIT APPLICATION Inspections: 726-3769 Office: 726,3759 LOCATION OF PROPOSED WORK' /t./"7' '7 p-~~~~.~" ASSESSORS MAP' /) 'O~ ~.02: y-? ~ . q~/") ~O JOB NUMBER 225 Fifth Street Springfield, Oregon 97477 c~-"'>c::::.::> TAX LOT: LOT: BLOCK' SUBDIVISION' OWNER: /' ~~~ ~~J' L./L E" ADDRESS:' / "9? ~~ . ~ . //~'c:.?2 ? DESCRIBE WORK' 6/ ;'-b-/ ./ ? Y.rh~ B~g7 PHON'" ~x: 7'7~..., ~~ ~ze~ ,./4:~pr::=c ~ ~~ ~7=-~'~ CITY: STATE: ZIP: NEW REMODEL ADDITION DEMOLISH OTHER CON ST. CONTRACTOR . CONTRACTOR'S NAME GENERAl' PLUMBING' ADDRESS EXPIRES PHONE MECHANICAl' ~.hA'/;~"-r ~ ELECTRICA' . - OFFICE USE - QUAD AREA: LAND USE: FLOOD PLAIN: . OF BLDGS' . OF UNITS: ZONING CODE: _ OCCY GROUP' CONSTR. TYPE: . OF BDRMS' . OF STORIES: HEAT SOURCE: SECONDARY HEAT: WATER HEATER' RANGE: SQUARE FOOTAGE: To requesl an Inspection, you must call 726-3769. This Is a 24 hour recording, All Inspections requested before 7:00 a.m. will be made the same working day. Inspectlons requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS D Temporary Electric o Rough Mechanical - Prior to cover. o Final Plumbing - When all plumbing w9rk Is camplet.e. D Site Inspection - To be made after excavation, but prior to setting forms. o Rough Electrical - Prior to cover. o Final Electrical - When all electrical work Is complete. o Underslab Plumblng/Electrical/ Mechanical - Prior to cover. rt7I Final Mechanical - When all l,.Aa-.J mechanical work Is complete. o Electrical Service - Must be approved to obtain permanent electrical power. o Footing - After trenches are excavated. o Final Building - When all required Inspections have been approved and building Is completed. o Other 0~ ,~~t:;:; o Fireplace - Prior to facing materials and framing lnsp. o Masonry - Steel location, bond beams, grouting. o Framing - Prior to cover. o Foundation - After forms are erected but prior to concrete placement. o Wail/Ceiling Insulation - Prior to cover. o Underground Plumbing - Prior to filling trench. o Drywall - Prior to taping. MOBILE HOME INSPECTIONS o Underlloor Plumbing/Mechanical - Prior to Insulation or decking. o Wood Stovo - After Installation. o Post and Beam - Prior to floor Insulation or decking. o Blocking and Set-Up - When all blocking Is complete. o Insert - After fireplace s'pprovlll and Installation of unit. o Fioor Insulation -' Prior to decking. o Plumbing Connections - When home has been connected to water and sewer. "~ . 0 Curbcut & Approach - After forms are erected bllt prior to placemont of concrete. D Sanitary Sewer - Prior to filling trench. o Electrical Connection - When blocking, set-up, and plumbing Inspections have been approved and the home Is connected to the service panel. o Sidewalk & Driveway - After excavation Is complete, forms and sub-base material In place. o Storm Sewer - Prior to filling trench. o Water Line - Prior to filling trench. o Fence - When completed. o Final - After all required Inspections are approved and porches, skirting, decks, and venting have been Installed. o Rough Plumbing - Prior to cover. o Street Trees - When all required trees are planted. .' .1'.;,- III LOl TYP. " "(': ".~: Lot faces Setbacks . IS THE PROPOSED WORK tN THE _ IHSE ACC I .. HISTORICAL DISTRICT, OR ON Lot sq, Itg. Interior p.L. GAR I I THE HISTORICAL REGISTER? Lot coverage Corner N If yes, this application must be signed Topography Panhandle Is I I and approved by the Historical Iw I I I I Coordinator prior to permit Issuance. Total height Cul.de-sac lLLLL. I APPROVED: BUILDING PERMIT ITEM SQ. FT. X $/SQ. FT. VALUE BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT Garage " This permit Is granted on the express condlllon thalthe said construction shall, In all respects, conform to the Ordinance adopted by the City of Springfield, Including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plan Check Fee: Main Carport ~ Total Val ue Date Paid: Building Permit Fee Receipt Number: State Surcharge Received By: Tolal Fee (A) Plans Reviewed By Date SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge Is due on all undeveloped properlles within the City limits which are being Improved. PLUMBING PERMIT ITEM ADDITIONAL COMMENTS FEE Fixtures Residential Bath(s) N' Sanitary Sewer FT. Water FT. FT. Storm Sewer Mobile Home Plumbing Permli Slale Surcharge Total Charge (C) MECHANICAL PERMIT Furnace Exhaust Hood Issuance I~ ,/~ .06 2./6 By signature, I state and agree, that I have carefully examined Ihe completed application and do hereby cerllfy that all Informallon hereon Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safely Division. I further certify thai only contractors and employees who are In compliance with ORS 701.055 will be used on this project. Vent Fan N' Wood Stovellnserl/Flreplace Unit Dryer Vent . .fh~ 70 ,?f?7/ /~~. Mechanical Permit -:::::'_ State Surcharge Total Permit (D) I further agree to ensure that all re~ulred Inspections are reQuested at the proper lime, that each address Is readable from the street, that the permit card Is located at the fronl of the property, and the approved set of plans will remain on the site at all limes dur ng MISCELLANEOUS PERMITS Mobile Home State Issuance State Surcharge Sidewalk fl Slgnatu .-- Date '":'3....... ~ '"' 9s Curbcut It Demolition State Surcharge VALIDATION: Tolal Miscellaneous Permits (E) DATE PAID RECEIPT NUMBER ~/h:5'" c::> ~ 9- -=?-~., 7./6 4~, 'r TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D. and. E' Combined) AMOUNT RECEIVED RECEIVED BY