Loading...
HomeMy WebLinkAboutPermit Building 2003-10-15 (2) Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line .. . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2003-00894 ISSUED: 10/15/2003 APPLIED: 09/15/2003 EXPIRES: 04/15/2004 VALUE: $ 252,183.20 SITE ADDRESS: 1172 Delrose Dr ASSESSOR'S PARCEL NO.: 1703234409700 PROJECT DESCRIPTION: SFR Springfield TYPE OF WORK: Single Family Residence TYPE OF USE: Owner: SCOTT KENNETH L & KARLA C Address: 2742 LOCUST ST SPRINGFIELD OR 97477 Contractor License Expiration Date PETERSON DESIGN DEVELOPMENT 74534 06/1312005 ROSE CORPORATION 54431 09/30/2004 MARSHALLS INC 25790 12/23/2003 STEVEN DOUGLAS JACKSON 131109 08/24/2004 0\)\,...... BUILDING INFORMATION ~Q\l,{es 'll..l\i\i\'l ,a.W \ Otaqo\'l \\o{l # of Stories: O{e90\'l w \"e ~ te ~()t~ize: "7".!".,r ou'l \~c.a: ~ v H~AAl\of~tr'u5\lN Sa {I!2S:0fl>.~ 'D<!- tJst Floor: f>.Th~ oflHca'fP 'at .F.n-~ed~if.GJs .....eSil\'Ft'2~d Floor: ,.."N IV ref\\ o \\'1' v ,,' \\. A~ \Ow~~<<;{\J:,ype: ~ .00'\ opiE6as \8\€.~4'l't lS\\,\ement: '~clU'~~?~l!.e;lO o'o\a.i\'l c o~'~ii~ \'Io~.ii~~arage/carport ,Itil~li!"I):>a.'l n\et .1..\'1 ,~t!i,I1I.$~ Ft Other: 0090.. ,,\\1e ce 0{e90\'l ":3'2--'2-3AYmpervious Surface Area: _\\\(\~ . .he ....f\n...,:) , .....- r ,... . - . - I DEVELOP.MENTiNIt6RMATION , REQUIRED PARKING Overlay Dist: Total: 2 # Street Trees Rqd: I Handicapped: Paved Drive Rqd: Y /Oo'?!t'act: _.r-i:' p.n':~ I\-1E IN tI % ofP.61Coverage1 S\-Il\ll EX 24:(1)' MIl IS NOT 1\1\S PERMI cR 1\-1\S PER .~n"cn \ INO,- . ..n,"lcfl FOR I PUBLIC IMPROMEMIDus,-R \~ 1\0"''-- , "U~l ER\O~. F II I d · N'< 180 Sidewalk Type: u v mprove t\ Yes Downspoutsillrains: All storm drainage to go to weep holes and then curb and gutter Contractor Type General Electrical Mechanical Plumbing # of Buildings: Primary Occupancy Group: Secondary Occupancy Group: Primary Construction Type Secondary Construction Type: # of Bedrooms: SETBACKS Frontyard Setback: Side I Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: Street Improvements: Storm Sewer Available: Special Instruction: Notes: I R-3 U-I VN 20.00 14.00 8.00 47.00 33.00 I CONTRACTOR INFORMATION I 2 Paee I of4 Residential Phone 541-344-6638 541-686-0905 541-747-7445 541-683-7535 12,212 2,144 488 876 Curbside 5' Curb and Gutter Status Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Description TVDe of Construction V Wood Frame V Wood Bonus Rm Garaee Dwellines Dwellines Garaee Fee Description Plan Review Residential -Mechanical Issuance Fee- + 100;0 Administrative Fee + 7% State Surcharge 3 Baths One & Two Family Addressing Assignment Annexed 1998 Building Permit Curbcut Permit Dryer Vent Exhaust Hoods Furnace - up to 100,000 btu Gas Fireplace Gas Outlets 1-4 Heat Pump Plan Review - Planning Plan Review Residential PW Mult Disc - 2nd Permit Residence Wiring 1000 Sq Ft Residence Wiring Ea AddU 500 Sanitary Sewer - Improvement Sanitary Sewer - Reimbursement SDC MWMC Administration SDC MWMC Improvement SDC MWMC Reimbursement SDC SanitarylStorm Admin SDC Transpo Admin SDC Transpo Improvement SDC Transpo Reimbursement Sidewalk Permit Storm Drainage Impervious Area Temp Power 200 amps or less Vent Fan Willamalane Single Family '. . Uli' OF SPRINGFIELD Building/Combination Permit PERMIT NO: COM2003-00894 ISSUED: 10/15/2003 APPLIED: 09/15/2003 EXPIRES: 04/15/2004 VALUE: $ 252,183.20 I Valuation Descriotion , $ Per Sq Ft or multiplier $90.60 $76.00 $23.80 Square Footage or Bid Amount 2,144.00 488.00 876.00 Value Date Calculated $194,246.40 $37,088.00 $20,848.80 $252,183.20 09/15/2003 09/1712003 09/15/2003 Total Value of Project Fppo, P..W Amount Paid $612.72 $10.00 $172.09 $120.46 $306.00 $8.00 $-22.56 $1,062.90 $75.00 $6.00 $9.00 $12.00 $15.00 $4.00 $12.00 $59.00 $78.17 $-30.00 $106.00 $1l4.00 $413.04 $543.36 $10.00 $34.83 $332.86 $130.63 $49.50 $727.42 $164.89 $75.00 $1,398.67 $50.00 $24.00 $1,000.00 Date Paid Receipt Number 9/15/03 10115/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10115/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 10/15/03 1200200000000002121 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 2200200000000001660 Paee 2 of 4 '. . CITY OF SPRINGFIELD Status Issued Building/Combination Permit PERMIT NO: COM2003-00894 ISSUED: 10/15/2003 APPLIED: 09/1512003 EXPIRES: 04/15/2004 VALUE: $ 252,183.20 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Total Amount Paid $7,683.98 I Plan Reviews I Initial Review 09/16/2003 0911712003 APP LLH Plan nine Review 09/1712003 09/23/2003 APP TAJ A LOMA was approved for Orchard View dated 6/1/2001 whicb gave a new flood zone of X Unshaded for this lot. taj Public Works Review 0911712003 09/18/2003 APP MS 9/29103 - Contacted contractor- he decided to stick to original plan and take storm drainage to weep holes and then to street. -MS 9/17103 - Contacted contractor and told him that storm drainage must go weep holes and curb and gutter instead of directly into the street. He agreed this would be ok and I marked tbis on the plans. Applicant also agreed to reduce the size of driveway throat to 24 feet so a overwidth permit would not be needed. -MS 9117103 - No part of any building, foundation, or overhand shall be permitted within any easements associated with this property. -MS Structural Review 09/1712003 10/02/2003 APP TCM L-DAP permit required prior to excavation and building permit issuance. To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. I Sidewalk - Curbside: After forms are erected but prior to placement of concrete. 2 Curbcut - Standard: After forms are erected but prior to placement of concrete. 3 Site Inspection: To be made after excavation but prior to setting forms. 4 ErosionlGrading Inspection: After all erosion measures are in place. 5 Footing: After trenches are excavated. 6 Foundation: After forms are erected but prior to concrete placement. 7 Post and Beam: Prior to floor insulation or decking. 8 Floor Insulation: Prior to decking. 9 Shear Wall Nailing: Before covering sheathing with finish materials. 10 Framing Inspection: Prior to cover and after all rough in inspections have been approved. Paee 3 of 4 '. . Lll l' 01' ~rKlr\jul'lJ'.LU Building/Combination Permit Status Issued PERMIT NO: COM2003-00894 ISSUED: 10/15/2003 APPLIED: 09/15/2003 EXPIRES: 04/15/2004 VALUE: $ 252,183.20 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line II Wall Insulation: Prior to cover. 12 Ceiling Insulation: Prior to cover. 13 Drywall: Prior to taping. 14 Final Building: After all required inspections have been requested and approved and the building is complete. 15 UnderOoor Plumbing: Prior to insulation or decking. 16 UnderOoor Drain: Prior to cover or placement of concrete. 17 Rough Plumbing: Prior to cover and including required testing. 18 Water Line: Prior to filling trench and including required testing. 19 Sanitary Sewer Line: Prior to filling trench and including required testing. 20 Storm Sewer Line: Prior to filling trench. 21 Final Plumbing: When all plumbing work is complete. 22 UnderOoor Mechanical. Prior to insulation or decking and including required testing. 23 Rough Gas: After line is installed and required testing and capped if not attached to an appliance. 24 Gas Service: After line is installed and line has been connected to a minimum of one appliance including required testing. Presure test done at this point. 25 Rough Mechanical: Prior to Cover 26 Final Gas: When all gas work is complete. 27 Final Mechanical: When all mechanical work is complete. 28 Temporary Electric: Approval required prior to Utility Company energizing pole. 29 Rough Electric: Prior to Cover 30 Electric Service: Approval required prior to utility company energizing service. 31 Final Electric: When all electrical work is complete. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that tbe permit card is located at the front of the property, and the approved set of plans will remain on the site at all tim:;;rin/n~i07' f../4--4--~ /.0-1 S -03 Owner or Contractors Signature Date Paee 4 of 4 225 Fifth Street Springfield, Oregon 97477 541-726-3759 Phone Job/Journal Number COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 C0M2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 COM2003-00894 -Wil:;~. ,."Sl!'~~' ',..,",.'.,,1, ,- ... ! .:,....'..,. j .. - " ...~--,....,. -. Receipt #: 2200200000000001660 Description Plan Review Residential Addressing Assignment Willamalane Single Family Residence Wiring 1000 Sq Ft Residence Wiring Ea Addtl 500 Temp Power 200 amps or less Sidewalk Permit Curbcut Permit PW Mull Disc - 2nd Permit Storm Drainage Impervious Area Sanitary Sewer - Reimbursement Sanitary Sewer - Improvement SDC Transpo Reimbursement SDC Transpo Improvement SDC MWMC Reimbursement SDC MWMC Improvement SDC MWMC Administration SDC Sanitary/Storm Admin SDC Transpo Admin Annexed 1998 Plan Review - Planning Building Permit 3 Baths One & Two Family Furnace - up to 100,000 btu Vent Fan Exhaust Hoods Dryer Vent Gas Outlets 1-4 Gas Fireplace Heat Pump -Mechanical Issuance Fee- + 7% State Surcharge + 10% Administrative Fee Payments: Type of Payment Paid By Check PETERSON DESIGN Received By djb l.:heck Number Batch Number Authorization Number City of Springfield Official Reel Development Services Dep~rtm Public Works Deparlm , . Date: 10/15/2003 9:56:54, Amount Paid Item T olal: 78.17 8.00 1,000.00 106.00 114,00 50.00 75.00 75,00 (3. 1,39 543.36 413.04 164.89 727.42 332.86 34.83 10.00 130.63 4950 (2256) 59.00 1,062.90 306.00 10 9. 0 6.00 4.00 15.00 12.00 10.00 120.46 172.09 $7,071.26 How Received In Person Payment Total: Amount Paid $7,071.26 $7,071.26