HomeMy WebLinkAboutPermit Building 7-8-27
_....f.~~~\l',:Qt~~~...~"".~.~,.,_~~,__..._"~~~~__"'~""___~_""________.......~__._....,_>___...'~
.. RESIO ~TIAL..
. APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 9?4??
Building_ Division
?26-3?53 .
Job Location: #h ~5 'f/?,AA7'L wfi
AS8es8ors Map # / rz ();;) 05 1::< T= Lot # 0;2 ;;2 tJ ()
Subdivision:
OWner:
/7
'( ihald
L(~ cj:J
1i hAt-I! il'A 0 ./
I ) ~ S'::;f Phone:
AddPess:
Ci ty: ,
NmJ
Additien
Remodel
Mobile Home
Date of Applicatien
Contractors
General
Plumbing
I Electrical
I Mechar:ical
I ,Const7'Uation
,~r~7-81
CtA~tLcL,
Lender ' (/
,1 L( 7 -1 (J7) '2-
Zip:
Descnbe ivork:
~ & /7\r-.L ~ ~
'T /LflL[; ~~~O
Value
600
Receipt #
/ IJ1Jqq
,/rJ1dr{)/L
~,/
H ~)
Address
<>
I .
/ Av-;;V( a 1f( d
G ~ \11,
Signed:
Date:
c:?&
f?.-;) 7-11
Lisc.#
Expires
Phone
It is the responsibility of the permit holder to see that aH inspections are made at the proper time~ that each r;ddress is readabZe
from the street, and that the permit card is 'located at the front of the property.
"BuUding Divido1'!- approved plan shaH remain on the Building Sit3 at all times.
PROCEDURE FOR INSPECTION REQUEST,:CALL 726-3769 (recorder) state your City designated job nzm;ber, job address, type of inspecticn
requested and when you will be ready for inspection, Contracters or OWners name end phone number. Requests received befere 7:00 ~
:.'ill be made the same dey, requests made after 7:00 am wiZZ be made the next :x>rking day.
Reaui~ed Insvp-ctiens
O SITE INSPECTION: To be made after
excavation, but pner te set up of
, forms.
0, UNDERSLAB PLUMBING. ELECTRICAL &
, MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring aencrete.
o
UNDERGROUND PLUMBING. SEWER. WATER,
DRAINAGE: To be made pnor to fiZ-
Zir.g trenches.
o
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
!zoor insulation or decking.
POST AND BEAM: To be made pnor to
installatien of floor insulation or
decking .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No 1lJork is to be covered
,until these inspections have been
made and approved.
FIRFPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
O F~1ING: Must be requested after
approval of rough plumbing, electri-
,cal & mechanical. AU rOOfing
bracing & chimneys, etc. nr~st be
,. aompleted. No work is to be con-
,_'.,~:cealed until this inspection has
~been made and approved.
o
o
D
.~........-...-. -
Your City' Desigr.ated Job NumbeY' Is:
o
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ~~
required vapor barriers are in place
but before any lath, gypsum beard or
wall covering is applied, and before
any insulation is concealed.
fJDb3D
DEMOLITION OR XOVED BUILDINGS
=:J Sani tary sC'..Jer :Japped at p~opcrty Zine
~ Septi:J tank pwrped and fiZZed with gra;;eZ
I Final - i{hen above items are completed
---l and when demolition is complete or stru:J-
ture moved and premises cleaned up.
. Mobi le Hemes
~ Blocking and Set-up
~ Plumbing connections s~er and water
~ Electrical Connection - Blocking, set-up
---l and plumbing connections nr~st ce approved
before requesting eZectrical inspection
~ AC:Jesso~d Building
I Final - After porches, skirting, decks,
~ etc. are completed.
o
All project conditions, such as the installation of street trees, c~~letion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
o FINAL PLUMBING
o FINAL MECHANICAL
o FINAL ELECTRICAL
l~
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbing
Electrical, and Mechanical Inspections have been made and approved.
D
DRYWALL INSPECTION: Te be made
after all drywa II is in place,
but prior to any taping.
O MASONRY: Steel location, bona
beams, grouting or verticals in
accordance with U.B.C. Section
'}415. } :l
~ WOODSTOVE.:J After installation is
X-.:j ccmpleted.
o
CURB & APPROACH APRON: After foms
are erected but prior to pouring
concrete.
"ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTHENT TO BE f.1.1DE AT NO COST TO CITY Ipage 1 of 2
o
SIDEWALK & DRIVEWAY: For aZZ con-
crete paving within street right-
pf-way, to be made after aU exca-
vating compZete & form work & sub-
, base material in place.
o
FENCE: h'hen complete -- Provide
gates or movable sections through
P.U.E. '
o ~ JA(
t'age t!
JOB NO. ~7D fo30s0LAR J\"CESS REQ.-
Zone:
Lot Sq. Ft:;.
Z of lot Coverage
# of Stories
Total Height
Topography
ITEM
SQ.FTG
Main
GaI'ac; e
Carport
Accessorl/
S.D.C.
TOTAL VALUE
(vaiue)
1.5 x
BuiZding Pem t
State Surcha:rge
Total Charges
lITEM
\ Fixtures
Residential (1 bath)
Sanitary Sewer
Water
Plwnbing Permi t
State Surcr.apge
Total Charaes
lITEM.
Res. Sa. fta.
I New/Extend Circuits
Tempora:ry Seroice
Ele~trical Permit
State SurC!harge
Total Charqes
Occupancp Gra",,;:
WT TYPE
NO.
NO.
Interior
Corner
Panhandle
Cul-de-sac
x
Value
FEE
CHARGE
FEE
CHARGE
ITSM I NO'1 FSE CHARGE
FUrnace ETU' S
Exhaust Hood I I
I Vent Fan
I Woodstove I
I
Permit'Issuance
Me::hanical Permit
State Surcharae
Total Charaes
-- ENCROACHMENT --
Se~~rity Deposit
Storage
I Maintenance
I Permit
Total Charges
Curbcut
I SidehJalk
I Ferule
I Electrical Label
I Mobi le Home
I
TOTAL AMOUNT DUE:'"
Is .01)
.75
(S .75
IS.15
Type/Cor-8t:
I Lot Faces -
I Setbacks
I P.L. House Garage Access.
INorth
East
South
IWest
-- Fees
L -CO G~
Bedrooms:
I ' Energy Sources
I Heat
I Water Heater
I I Range
I I Fireplace
I Woodstove
I I
Tl!De
Building Value & Permit
This permit is granted on the express condition that the said_construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at cny time upon vio-
~tion of any provisions of said Ordinances.
...
IPlan Check Fee:
.I Date Paid:
Recdpt #:
Signed:
Plumbing Permit
No person shall construct, install, alter or change any new or existing
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plwnber's license, except that a person may do
plwnbing work to property which is owned, leased or operated by the appli-
cant.
Electrical Permit
Where State LClLJ requires tr.at the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the tabel has been signed by the Electrical Contractor.
Mechanical Permit
Uate
I HAVE CAREFULLY EXAMINED the compZeted application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d all work perfomed shall be done in accor-
dance with the Ordinances of the city of Springfield, and tha Lcr,,)s of the
... State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structur.3 without permission of the Building Di-
vision. I further certify that only contractors ar~,e~ployees who are in
compliance with ORS 701.055 will be used on this project
I ...
...
l ...
I
I
I
I
I
I
I
I ...
I
/'
)It
...
Plan Examiner
~6YlCL1]QJfl17Q[fJ~ ?--~7-g1
Signed Date