HomeMy WebLinkAboutPermit Correspondence 2005-7-29
... ,,_.
J,u I 2 S 05 03: 50 P
......'
'"
, ,
Walter Custom Homes-
"
541":'683-3373 .
)
, fi'axCover Sheet
Walter Custom Homes
. GCB#l60287
2863 RiverwaIk Loop
Eugene, Or. 97401
541.683.6355
fax: 541.683.3373
To (Comvanv): Q~ ct S!nn76~11
,
Fax #: i )(0 - /()rJ-..!
.. . ~, .
Attn:cAo{rl
, From: ,;fv,11 (l~ (,-J 6SCr (t?S.3~
Date:' 7,- ~"~
Paees (includine cover): 8:,
Re: .'3;f('~ Tn r/J?~ 1if/4,h'JN! Qu/s,!rdV)Y! Ctr re..
.. I. \
V
! .jJ...."""j <1/ OG; - ooc,e,j 4-1:?7 fl~k,') (",f-c
~36 ? fivVl 4//1d-cl.
p. 1
.'
~ul 28 05 03:50p
Walter Custom Homes
54 1 - 6 83 - 337.3
p.2
CommUlli,'Y Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 5d1 Street, Springfield, OR 97477 Ph. 726-3 i59
I ,
Job Addr~'ss ~v5r"J t:emh \ \ \
City Job # J.l. ~ - ~ ~ !
Subdivision 40t # '2-'i
SPRINGFIELD
I
~~~1~.~~
" OJ . .. '. I .'.... . .'. ~. ,. , ff! (;~",
Mountaingate Subdivision - Phases I & IT
Site Investigation Questionnaire for Consulting Design Professionals
Foundation requirements - new structures on residential lots
This form may be used as a temporary verification to allow construction to continue
on the job site until the consultant's stamped affidavit on the site soil compaction
and stabilization is submitted to the City. This form must be completed by a
licensed -design professional (engineer or architect) or his/her authorized employee,
and submitted to the building inspector prior to requesting City inspections or
placing foundation concrete. It is important that all questions be answered
completely for the foundation site to be approved for construction.
Owner and/or Contractor
\tllLU'r Qu~A()~
1. Date(s) of the design professional's site evaluation?
~~7 (I] ? ,l;-1-- ~,L2-a('s;
2. Has the design professional reviewed a copy of the geotechnical information
that was prepared for the subdivision relating to this site? Yes i/1Vo_
If not, please, contact this office for a copy of the report. The design professional.
must befqmiliar with the geotechnical information before completing this form.
1. In which Geotechnical Investigation area is this site located?
CLeveiI sites are lots # 3-20,43-49 & 49-71) . Level I
(Level II sites are lots #1-2,21-42 & 50-54) , Level II ~/
Note: Level II reauires a site-soecific {!eotechnical investilration
- " !
Were site conditions identified that would change the category? YES!_ NO, ~
(For criteria determining category,-see the accompanying document titled: I
Geotechnical Requirements for Individual Building Lots Mountaingate Subdivision - fbases 1 & 2
If "yes", explain (use the reverse side of this sheet or an additional sheet if .
necessary) ,
1
~ul 29 05 03:50p
Walter Custom Homes
541-683-3373
p.3
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 51h Street, Springfield, OR 97~77 Ph. 726-3759
, Job Address ,
City Job # [1,r;. 5..~~.
Subdivision Lot #
. . . . .
W3s a geotechnica.i enghieer involved at the site to verify that conditions are
suitable for const~uction','ofthe pr~oied ~uilding(s)? ~~s t/'No ~ ".
Name of geotechnical engmeer ft""Vl0 ~ 1 n ~, U. , l ( ~ 'rTl) lIII'-'" .
3, 'What was the nature of the excavation and lor fill? lilt SLLlf<1::.~r.p ,
~/!{). iI\':'-.i\/~ ~i'f.s. WILt! reAlW\~J..u~ hi <;:'L.u~f-a...6(€'" qta..rlo~. ~4e..e-"e.(J
,+:,It wa..<;" I Il"+"llfr.( -fr-.. t-k.e,J~~s,'re_A, 1R.--u1!1 ~rt~R.- Dr6o::.,,,,,~~f<:;tr-u.cf()./t:.
~ e... o...t\-u.ck~ 1-ej-\-eI- , · )
Was existing non-strUctural fill or expansive soil encountered on the lot? .
Yes ~No _ If "yes", what types, depths and locations, and how does it affect
the building foundation? E~"^->-.; V(Y. (':::,(\1...15 J I .l.'l~,~'r ,h LUtLr~ ('-e I'lAr',{ftc/.
,>,() e i--l '" CI -\\G.c \,., ,N-4 I~_-tt<(.', r
,
. What measures were taken to remedy the soil condition (include type of ,
engineered fill used to stabilIze the soil)? , ~ '/ 9fR_,,:-, ~,~ ~ \.12 '. M..!.f\uS
---.L+v ~~,.j "'~r l-- (^"'~ ('{.~ ri I t\ If; " t i U-, . S e....-c'_ i-l '"
(~ f{.r. r l p;,( ~,#-~ r
Is the site as prepared adequate Q/' inadequate 0 to maintain constant moisture
content in the sub grade? Note: Verification of moisture stabilization in the sub
grade is a requirement for site preparation, and must be affirmed before
construction can continue.
If inadequate, what measures are to be taken to provide constant moisture content
in the sub grade?
Is the site, as prepared, adequare~inadequateD to support the proposed
structure? An affirmative answer is requisite to proceeding with construction.
If inadequate, what additional work is needed to provide adequate
foundation support?
4, Did the design professional witness placement and compaction of the
engineered fill, or is there a special inspection report forthcoming from a
qualified agenc)'? 1 witnessed Placement Ga'Speciallnsp/compaction report Q.-'
2
Jul 29 05 03:50~
Walter Custom Homes
541-683-3373
p.4
Community Services Di\'. Building Safety
CITY OF SPRINGFIELD, OREGON
215 51h Street, Spring~eJd, OR 97477 Ph. 726-3759
Job Address
City Job # -.t\5-59'A
Subdivision Lot #
,
. J .... . ." _ . .
5, The design professional intends to use.the :following method for in~t~lIation
of perforated perimeter footing drains:, ' .: .
The design on the attached drawing provided by the design professional..... . . 0
Th h d h th. . al ' . dr . ',Q-
ernet 0 5 own on eongm construction awmgs.............'..-:.....
The typical 'Foundation Drain' drawing attached to pennit ,.... '..,...., '... ... 0
Perforated perimeter drains are not required........................,...... ..... 0
Comments: ~p" I pI{.." _ r 11 H-CLC I~.p (~ .
Note,' City inspectors will inspect installed drains prior to cover upon request...
Call: 726-3769 to schedule inspection.
Low-point crawl space drains are required to prevent the build-up of excess
moisture inside the foundations during (and after) construction, This drain
may be installed after foundation placement onlv with the eXDress Dermission
of the desi!!llDrofessional.
a. The design professional has determined the following:
The crawl space drain is required when thefoundation is installed..... 0
, The low-point drain can be installed after foundation placement without a
significant moisture build-up problem within the foundation... ...... .... GJ--'
. (The low-point drain may be installed at the {} /J(l.f'OfJr{Q~..p , stage
if t ct'o' I post dI eam, )raming, roofing. etc,
o cons ru 1 nl .
b. Has the design professional observed and approved the installation of the
required low point drain?........... ............... ... ..... Yes, No
if 'yes", where is the low point drain located under the building and
where does it terminate at this time? (Must be an approved location, i. e.
street gutter, storm sewer, sump pump and discharge line to the street,
etc.) , . '..
The design professional must determme whether the approved permit drawings have
adequate foundation steel. . Is any additional foundation steel required that is not
shown on the foundation drawings for the building?
Yes No ~ If "yes ", describe additional steel required (or provide drawing).
nl'l ,() (ld/+{~I\.)'\o ( s+~~i l~ f"@~t-u,(r-erl kr dud-e(l~; ((1 (
rl)v'L s. lCl--l.?..rn. t--, r'll'\ ~ '
...
:)
Jul 29 05 03:51p
Walte~ Custom Homes
541-683-3373
p.5
Community Services Div, Building Safety
CITY OF SPRINGFIELD, OREGON
225 Sdl Street, Sprjng~eJd, OR 97477 Ph,726-3759
Job Address
City Job # {I./5- ~
Subdivision Lot #
The individual doing the observations and providing direction for the excavation and site
preparation work on the property must sign the folloy;ing statement. : "
The undersigned 4esign professional (or authorized employee) attests that he/she
observed required moisture stability procedures on this site, and that such procedures
were accomplished before any changes occurred in the moisture content of the sub-
grade under and around the building (where expansive soils were encountered). The
undersignedfurther attests that the sub-grade, as prepared, is adequate to support the
building proposedfor this site.
Additional comments:
(Note): A copy of this report shall be kept on site with the approved plans at all
times.
This report shall be followed by an affidavit, signed and stamped by the design
professional under whose auspices this report was completed, affIrming the information
herein. The signed/stamped affidavit together with a copy of this report shall be
submitted to this office prior to requesting framing inspection for the building.
SigDatU~ Q "^" to ~,iJJ..u~ _
Name ~ .,~...e_J (3. > .. 14 { I ( 5'.r-Il+;V\. TItle P~,.
Company tJ: (( S;, fh f..p E1A9( II e~ r;"f\.a
Phone e1",)('f",,"(^7 () :r[
Licensee
License #
CUO"72..
v, .~
expires
O/D/;O/t\7
The geotechnical report for the Mountaingate Subdivision Phases I & II makes
recommends for placement of building constnlction on each site. The report also
recommends that site preparation during wet weather conditions be avoided unless
special measures are taken to mitigate soft soil conditions and moisture collecting in' or
around the foundation areas during and after the construction process. Positive site
drainage must be provided.
4
Jul 29 05 '03:51p
Walter Custom Homes
541-683-3373
p.6
Community Services Diy, Building Safety
CITY OF SPRINGFIELD. OREGON
'. ." \ .
225 5th Street, Springfield, OR 99477 Ph. 716-3759
J .' . .' . .
Job Address
City Job #
LP35'J Ieml1\\ U
~~.... ~'9~
Subdivision Lot # ').q
~PRrNGFIELD "
~]
A F FI D AV IT
For Site Investigation Questionnaire
, Foundation Sub-Grade Approval for
Residential Building Site in Mountaingate Subdivision
Phases 1 &2
-
The undersigned hereby affirms that the excavation, structural fill and moisture
stabilization methods for the building site at the address shown above were observed by
me or an authorized employee of my firm and that the following is true:
1. The geotechnical information for the subdivision" specific to this site, was utilized
as part of the determination for foundation preparation and drainage requirements,
2. The foundation sub-grade is capable of supporting a minimum of 1500 psf, and is
adequate to support the building proposed for this site.
3. The moisture content of the excavation was adequately maintained during the site
preparation process and the site is adequately graded and drained for discharge to
an approved location in order to maintain stable moisture content throughout the
const:I1Iction process and thereafter.
4. The accompanying report titled "Site Investigation Questionnaire for Consulting
Design Professionals" containing field observations and instructions made on
(date)' 1"-z.7/0'5' for this building site was completed either by
me or by an employee of my fum under my superv~sion. To the best of my
knowledge, the information contained in that report is complete and accurate.
, ("~~'
. Name' of Licensed Professional (print) r~\'I^.() J,eL,2J" t!-(~{ tslrorv--,
Signaturef?Aw ~.~,S,. ~~-
Date 67(t..%S-
I tX:'RATlnr" j1r'''-''-'~i;~o.!0? "
~ul 29 05 03;51p
Walter Custom Homes
541-683-3373
p.7
HILL& DALE ENGINEERING, LLC
74 EAST 18TH AVENUE, SUITE #5
EUGENE, OREGON 97401
541-868-0667
FAX: 541-868-0$88
07/27/05
Walter Custom Homes
2863 Riverwalk Lp. ..
Eugene, OR 97401
RE: 6357 Femhill Ct. - Site/Soils/Compaction Investigation- Job #264-05
As you requested, a site soils investigation was performed at the above address, Site visits were
performed on July 19,20,21,2005 to supervise the excavation of the site for the proposed
construction.
All unsuitable fills, organics and other unsuitable material has been removed to suitable grade,
The excavation required the removal ofunsuitabJe landslide and expansive soils to a depth of
approximately 6'.8' on the south portion of the site, to suitable decomposed sandstone. The
' sandstone has a Unified Classification ofML-SM and a plasticity index of less than 20. This soil
is not considered expansive (after Holtz 1959). Imported compacted crushed 3" open was placed
and compacted in lifts of 6'~_8" at the base of the excavation to within 24" of the desired footing
elevation for the placement of the stepped foundation walls. 1 W' minus crushed rock was
placed at the top 12" to 24" of the excavated site placed and compacted in 6"-8" lifts.
A compaction inspection on the gravel fill was performed on 07/25/05. The compacted surface
of the I W' minus crushed rock is adequate for the proposed foundation and has a minimum
bearing capacity of 1500 psf, The compaction of the gravel surface is greater than 95% of a
standard proctor per ASTM D698.
Perforated drainlines were placed at the Jow point of the excavation, as directed by this office,
and are to be tied to the approved outlet for this subdivision's storm water system. Drainlines as
specified on the site plan at the back of the lot are not feasible, due to the possible damage to
existing vegetation root system for vegetation that is to remain, The drain line has been installed
at the edge and base oft1~e engineered fill in open rock at the back of the structure excavation and
is to be tied to the approved outlet for storm water, This has been placed in addition to the
perimeter footing drains that are to be installed at the back of the structure as per plan.
'",
Jul 28 05 03:52p
Walter Custom Homes
541-683-3373
p.8
It is recommended that the back patio is to be installed as a concrete slab that will be sloped to
provide that the runoffwi1l be directed to the back of the slab drainage systems as described
above. A pervious paver system for the slab is not recommended, as the footing drains are to the
back of the patio, and surface water from the patio would be allowed to build up against the
house foundation, which may cause damage to 'the structure foundation in this area.
This report is limited to the site soils investigation related to soils and fill in regard to soil
conditions at the excavated structure site at the above address only.
Thank you for this opportunity to be of service, If you have questions regarding this report,
. contact me at 868-0667. '
Sincerely,
Pamela S. Hillstrom, P.E.